    Strategic Investment Opportunities forStrategic Investment Opportunities for

    EMCO LimitedEMCO Limited

  • 8/8/2019 EMCO Final Final

    2/24

    Agenday Industry Overview

    yCompany Analysis

    yAcquisition Targets

    yFinancial Valuation & Potential Synergies

    y

    Risks Analysis

  • 8/8/2019 EMCO Final Final

    3/24

    Industry OverviewIndustry Overview

  • 8/8/2019 EMCO Final Final

    4/24

    Indian Power Sector ScenarioIndian Power Sector Scenarioy Government plans to increase current power generation capacity

    of 152GW to 200GW

    y Vision 2012 has made an increasing number of rural areas and

    villages get access to power.

    y Inter Regional Power transmission to be raised from 20GW to

    38 GW

    y Privatization of Power Distribution to minimize T&D losses.

    y Government experience a YOY shortage of 10% of its expected

    capacity

  • 8/8/2019 EMCO Final Final

    5/24

    Power Industry OpportunitiesPower Industry OpportunitiesGeneration

    Transmission

    DistributionPower

    Solution

    EquipmentExport

  • 8/8/2019 EMCO Final Final

    6/24

    Government Regulations &Government Regulations &

    ReformsReforms 11th Five Year Plan

    Ambitious Plan to add 78.7GW of power generation

    Rs 7500bn likely to be invested in Power Sector Government encouraged Private sector participation in transmission

    sector.

    12th Five year Plan

    100,000MW additional capacity.

    Electricity Act 2003y Removed Licensing needs for Power generation projects.

    y Project allocation through competitive bidding

    y National Tariff Policy 2006 promotes Private sector contribution

    y Allocation of Captive Coal blocks to Private players to ensure fuelsecurity.

  • 8/8/2019 EMCO Final Final

    7/24

    Key Observations

    For each MW of capacity added generates a demand for7-8 MVA Transformers across generation, T&D.

    Replacement demand of almost 20,000 MVA`sexpected by 2012.

    Huge capex investments expected in the sector which

    were put on hold because of the economic recession.

  • 8/8/2019 EMCO Final Final

    8/24

    Company AnalysisCompany Analysis

  • 8/8/2019 EMCO Final Final

    9/24

    Name EMCOLtd. Sector: Power Equipment Industry

    Brief

    DescriptionIncorporated in the year 1964

    Leading Electrical Technology and Solutions Provider in India.

    3rd Largest manufacturer of transformers in India

    Manufacture of power equipment viz. Generation Equipment and T & D

    Equipment

    Multi-Product End-to-End Solutions Provider for Power generation,

    transmission and distribution

    Operations in more than 40 countries

    In the year 1996, the company diversified into manufacturing of electronicenergy meters and project division for construction of sub-station projects

    Amongst the 100 fastest growing companies in India

  • 8/8/2019 EMCO Final Final

    10/24

    Company Shareholding

    y Big MF`s like SBI Magnum

    Midcap- Growth & Equity,DSP Blackrock, and BNPParibas to name a few.

  • 8/8/2019 EMCO Final Final

    11/24

    Performance in 2Q FY2011

    Reported revenue increased by44%

    OrderBook dropped by 70%

    Transformer business marginshave dropped to 8% from 14% asa result of excess capacity.

    Meter division showed a sharpincrease of 44%

  • 8/8/2019 EMCO Final Final

    12/24

    Performance vis-a-vis Sensex

  • 8/8/2019 EMCO Final Final

    13/24

    EMCO Product PortfolioEMCO Product Portfolioy Transformer Division :

    Leading Manufacturer ofPower, Distribution, Furnaceand Rectifier Transformers .

    yMeter Division: ManufacturesSingle Phase , High endelectronic Meters and RevenueManagement solutions.

    y Project Division: Constitutestwo SBUy 1) Sub-station

    y 2) Transmission Line

    Also provides end to endsolutions for Transmission andDistribution of Power.

  • 8/8/2019 EMCO Final Final

    14/24

    EMCO Order bookEMCO Order booky Order book of Rs 1500 Cr

    for FY10.

    y

    Provides a decentRevenue assurance forFY11.

    y Transformer and Project

    Division Constitutes98% of orders.

  • 8/8/2019 EMCO Final Final

    15/24

    Acquisition TargetsAcquisition Targets

  • 8/8/2019 EMCO Final Final

    16/24

    Companies ConsideredCompanies Considered

    Options Acquisition targets Decision

    Option 1 Power Generation Companies Rejected

    Option 2 Meter Manufacturers Rejected

    Option 3 Smart Maintenance Technology

    Solutions Provider

    Rejected

    Option 4 Transformer manufacture Accepted

  • 8/8/2019 EMCO Final Final

    17/24

    Target Company

    Accurate Transformers

    AccurateTransformers

    PowerTransformers

    DistributionTransformers

    y Higher EPS

    y D:E of 0.51

    y

    Book Value and PE ratio isless

    y ROCE is better

    y Enterprise value is lesser

    y

    Transformers above 220KVNAINITAL PROJECT -Successfully executed this project worth Rs. 422 million andelectrified 35 villages with 11000ETAH PROJECT- Successfully executed this project worth Rs. 642 million and electrified741 villages with 12000 BPL Connections.

    .

  • 8/8/2019 EMCO Final Final

    18/24

    Financial Valuation & Potential SynergiesFinancial Valuation & Potential Synergies

  • 8/8/2019 EMCO Final Final

    19/24

    Risk AnalysisRisk Analysis

  • 8/8/2019 EMCO Final Final

    20/24

    Business Risk

    Competitor Risk

    Regulatory

    Overcapacity

    Political Risk

    Risk Analysis [1/3]Risk Analysis [1/3]

  • 8/8/2019 EMCO Final Final

    21/24

    Operational Risk

    Efficiency

    Capacity

    Performance Gap

    Risk Analysis [2/3]Risk Analysis [2/3]

  • 8/8/2019 EMCO Final Final

    22/24

    Financial Risk

    Interest Risk

    Default Risk Price Risk

    Risk Analysis [3/3]Risk Analysis [3/3]

  • 8/8/2019 EMCO Final Final

    23/24

    OtherP

    ossibleTargets

    y Smart Maintenance Technology Systems (SMT)Provider

    y

    Mining operatorsy Thermal Power Plants

  • 8/8/2019 EMCO Final Final

    24/24

    Thank YouThank You