Elstree to St John’s Wood 400 kV Cable Tunnel
Professor Steve Swingler
![Page 2: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/2.jpg)
System Overlay Philosophy
275 kV system is over 40 years oldNew build to be at 400 kVMinimise public impactMinimise disruption to existing system during construction
![Page 3: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/3.jpg)
St John’s Wood: Aerial Shot
![Page 4: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/4.jpg)
Construction Issues: Substations
SpaceSite accessTraffic managementSite clearanceConstruction worksImpact on local communityArchitecture
![Page 5: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/5.jpg)
Why Dig a Tunnel?
Reduced public disruption during constructionReduced programme risk Secure environment for cableFuture provision for second circuit
![Page 6: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/6.jpg)
The Tunnel Route
![Page 7: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/7.jpg)
Technical Details
400kV XLPE cable circuit2500 mm2 Copper conductorForced air coolingDTS monitoring and controlPD Couplers installed in accessoriesSingle circuit
![Page 8: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/8.jpg)
The Tunnel
![Page 9: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/9.jpg)
Construction Issues: Tunnel Shaft Sites
Site availabilitySite accessTraffic managementSpoil removalImpact on local communityHeadworks
![Page 10: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/10.jpg)
Kilburn Grange Park:Aerial Shot
![Page 11: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/11.jpg)
Kilburn Grange Park:Headhouse and New Entrance
![Page 12: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/12.jpg)
Tunnel Layout
![Page 13: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/13.jpg)
Consultations and Communications Strategy
Introductory open meetingsOngoing discussion forumsFreephone serviceProgramme updatesAdvertsLocal community support
![Page 14: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/14.jpg)
Project Identity
![Page 15: Elstree to St John’s Wood 400 kV Cable Tunnel - T3-02 - … · 400 kV Cable Tunnel Professor Steve Swingler. System Overlay Philosophy 275 kV system is over 40 years old New build](https://reader033.vdocuments.mx/reader033/viewer/2022052611/5f0738497e708231d41be7c8/html5/thumbnails/15.jpg)
London Infrastructure Project: Summary
System installed and operatingCommissioning test from ElstreePD measurements during testMajor consultation exercise