elliott ops status - airs.jpl.nasa.gov€¦ · title: elliott_ops status.pptx author: denis a...

30
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California Atmospheric Infrared Sounder Ops Status AIRS Science Team Meeting April 21–23, 2010, Pasadena CA Copyright 2010 California Institute of Technology Government sponsorship acknowledged Instrument/Spacecraft Operations Status Denis Elliott April 21, 2010

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Instrument/Spacecraft Operations Status

Denis Elliott

April 21, 2010

Page 2: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Outline

•  AIRS 28-volt power supply anomaly of January 9, 2010

•  AIRS operational status

•  AMSU-A operational status

•  Aqua spacecraft status

2

Page 3: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Anomaly of January 9

3

Page 4: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Anomaly Description

•  January 9, 2010 at 09:45:40 UT the AIRS Actuator Drive Module (ADM) Group 2 28 V line dropped its voltage to 0.8 V

•  The AIRS choke point heater and the on-board calibrator heater both turned off at the same time

•  The drop in voltage on the 28 V line was sudden and no strange behavior was seen until the moment of the drop

•  No other AIRS subsystems malfunctioned before or after the anomaly

•  Nothing unusual was seen in the spacecraft telemetry

4

Page 5: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS ADM 28 V Power Supply Voltage

5

Page 6: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Choke Point Heater Current

6

Page 7: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS OBC Temperature

7

Page 8: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Immediate Actions Taken

•  The Aqua Flight Operations Team (FOT) at Goddard has instructions on how to respond to any red alarm

•  The FOT ran the designated alarm response procedure as soon as the problem was detected –  Focal plane, scanner, chopper, and high rate

telemetry were shut down in an orderly manner –  Group 2 power turned off –  Flight control computer, low rate telemetry,

and both coolers remained on

8

Page 9: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Anomaly Response Team Actions(1 of 2)

•  The procedures in the AIRS Anomaly Resolution Management Plan were followed

•  A combined team from several institutions analyzed the telemetry data –  AIRS Project –  Earth Science Mission Operations (ESMO)

project at GSFC (the parent organization of the Aqua FOT)

–  BAE Systems (AIRS system contractor)

9

Page 10: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Anomaly Response Team Actions(2 of 2)

•  An SEU that activated a crowbar circuit was suspected

•  Since turning off Group 2 power resets the crowbar, the recommendation was simply to turn everything back on, monitoring closely as we went

•  A Command Authorization Meeting (CAM) was held on January 19 at which the detailed recovery plan was approved

10

Page 11: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Recovery Timeline

•  Bringing up the subsystems took place over two days, January 20–21

•  Minor adjustments were made on January 22

•  The detector gain/circumvention table was uploaded on January 23—at that point the science data was back to normal

•  AIRS put back in OPERATE mode on January 26

11

Page 12: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Conclusions

•  The hypothesis that an SEU caused the activation of the crowbar circuit appears to have been correct

•  AIRS suffered no damage from the incident

•  The AIRS spectral calibration was not significantly affected, because the focal plane did not warm up (coolers remained on)

•  AIRS science data quality before and after the anomaly is the same

12

Page 13: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Status

13

Page 14: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Operational Status

•  AIRS is in excellent health •  All engineering parameter plots versus time are

either flat or changing extremely slowly—no concerns

•  A few channels have degraded noise performance due to radiation dosage on the ROICʼs –  More on the status of the channel noise

properties and possible improvements in Steve Brobergʼs talk on a proposed new gain table (Friday morning)

14

Page 15: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Chopper Drive Current

15

Page 16: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Scan Mirror Temperature

16

Page 17: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Choke Point Heater Current

17

Page 18: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Second Stage Radiator Temperature

18

Page 19: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Cooler A Drive Level

19

Page 20: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Cooler B Drive Level

20

Page 21: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AIRS Focal Plane Temperature

21

Page 22: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AMSU-A Status

22

Page 23: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AMSU-A Operational Status

•  AMSU-A mechanical parts and most of the electronics are in very good health

•  Engineering parameter trends are slow—no concerns

•  12 of the 15 channels are rock solid, but –  Channel 4 failed in 2007 (declared

non‑operational on October 1 2007) –  Channel 5, while still useful, is steadily

degrading –  Channel 7 has been noisy since launch and

has never been used

23

Page 24: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AMSU-A1-2 RF Shelf Temperature

24

Page 25: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AMSU-A2 RF Shelf Temperature

25

Page 26: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AMSU-A1-2 Noisy Bus Current

26

Page 27: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

AMSU-A Channel 5 NEΔT

27

Page 28: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Aqua Status

28

Page 29: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Aqua Spacecraft Health Status

•  Aqua is in very good health •  Several minor anomalies (mostly involving the

power system) have occurred over the years •  Solar array panel #8 thermistor #6 temperature

anomaly began on August 3, 2009 –  Thermistor #6 is no longer providing valid

temperature readings of array panel #8 –  The panel itself appears to be operating

normally –  If the other thermistor also fails, there is

enough capacity to permit the deactivation of panel #8 without impacting operations

29

Page 30: Elliott Ops Status - airs.jpl.nasa.gov€¦ · Title: Elliott_Ops Status.pptx Author: Denis A Elliott Created Date: 4/21/2010 1:50:59 PM

National Aeronautics and Space Administration

Jet Propulsion Laboratory California Institute of Technology Pasadena, California

Atmospheric Infrared Sounder

Ops Status AIRS Science Team Meeting

April 21–23, 2010, Pasadena CA

Copyright 2010 California Institute of Technology

Government sponsorship acknowledged

Aqua Fuel Supply

•  Occasional drag make up burns use only a very small amount of fuel

•  Most fuel usage takes place in orbital inclination adjustment maneuvers, needed to keep Aqua properly aligned with other A-train instruments and to tightly control our 1:30 pm crossing time –  A series of three orbital inclination adjustment

maneuvers, each involving 9-minute thruster burns, was completed on March 23

–  A recent estimate of future fuel usage indicates that the hydrazine should last at least until 2017, and probably several years more

30