electrolux system integration projects general rules and guidelines for edi and communication...

7
Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

Upload: antony-atkins

Post on 24-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

Electrolux System Integration ProjectsGeneral Rules and Guidelines for EDI and Communication projects

Wolfgang Dvorak

Page 2: Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

2

Overview

• General Prerequisites• Contacting System integration Communication setup Supplier messages

Page 3: Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

3

Prerequisites for a new project

Agreement between both business parties• Idea about scope of the project• Idea about the timeline• Agreement between partners to start a project

Contact partners given by all relevant parties• Electrolux Business reference person• Reference person on partner side• Technical application contacts (where needed)• 3rd parties (where needed)

• Official request by Electrolux business• System Integration acts only on request of Electrolux business. • We do not act on partner requests that are not confirmed.

Page 4: Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

4

Contacting System Integration

There are two mailboxes for contacts with System Integration.

Si Projects ([email protected])- request new projects- questions about existing projects when the project leader is not available- change priorities and planned delivery dates of projects

Si Support ([email protected])- ask for support of production problems- queries about production message status- Small service requests in production (e.g. resend)

SI project leader can be contacted every time

Page 5: Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

5

Communication setup

System Integration has defined ‚preferred‘ ways how external partners should connect with Electrolux. Our preferrence is following the sequence below. See the document ‚SI Connectivity guide‘ below for details. Email is not a preferred way of communication.

Preferred communication ways are:– AS2 (safe and secure transmission via internet, free of charge)– SFTP via SSH (secure FTP transmission via internet, free of charge)– X.25 (safe and secure call by call communication via phone lines, cheap)– X.400 (safe and secure transmission via WAN, less expensive)– GXS Mailbox (safe and secure transmission via WAN, expensive)

Connectivity Guide V1.6

Page 6: Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

6

Supplier Messages Overview

Electrolux exchanges 3 standard messages with suppliers:

– DELFOR D91.1 (outgoing Calloff and Forecast messages)

– DESADV D91.1 (incoming delivery notification)

– INVOIC D94B (incoming for goods- and service invoices)

For suppliers not capable of EDIFACT messages a flat file layout is defined as well. In future Electrolux will offer a Web solution for supplier connection (Web-EDI) that will also allow smaller suppliers without any technical infrastructure to join the electronic handling of messages.

Page 7: Electrolux System Integration Projects General Rules and Guidelines for EDI and Communication projects Wolfgang Dvorak

7

Supplier Messages - Specifications

Format specifications/descriptions:

DELFOR DESADV

EDIFACT + inhouse EDIFACT + Inhouse

INVOICEEDIFACT + Inhouse

DESADV 91.1DELFOR 91.1 DELFOR flat file Format

INVOIC D94BINVOIC flat file

Format

DESADV flat File Format