electricity supply and opportunities in myanmar
TRANSCRIPT
Electricity Supply and Opportunities
in Myanmar
Ministry of Electricity and Energy
The Republic of the Union of Myanmar
Ms Mi Mi KhaingDirector General
Department of Electric Power Planning
2
Department of Electric Power Planning
Electricity Supply Enterprise
Electric Power Generation Enterprise
Yangon Electricity Supply Corporation
Mandalay Electricity Supply Corporation
Myanma Oil and Gas Enterprise
Myanma Petrochemical Enterprise
Myanma Petroleum Products Enterprise
Oil and Gas Planning Department
Dept. of Electric Power Transmission & System Control
Department of Hydropower Implementation
Transmission
Distribution
Generation
Upstream
Downstream
3,255 MW
57.7 %Hydro
2,175 MW38.6 %Natural
Gas
120 MW…
92 MW1.6 %…
Installed Capacity (5,642MW)
56%11,190 Gwh…
41.6%8,344.55
GwhNatural
Gas
2%451 Gwh
Coal
0.34%68.87 Gwh
Diesel
Generation (20,054 GWh)
3
4
1,600 1,7961969 2232
2497 28023189
3586 3653 3653 3653 3653 3653 3653 3653 3653 3653 3653 3653 36534032
45315092
57236431
72278121
9125
10253
11520
12944
14542
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Supply DemandMW
YEAR
Future Demand and Electricity Supply Gap
5
Energy Resources
ScenarioOption 1
Domestic Energy Consumption
Option 2Least Cost
Option 3 Power Resource
BalanceHydro (Large) 42% 42% 6%
Hydro (Small &Medium) 24% 24% 32%
Gas 17% 9% 20%Coal 10% 18% 33%Renewable 7% 7% 9%
Total Installed Capacity 28,784 MW 28,552MW 23,594 MW
Energy Source Scenarios (by National Electricity Master Plan 2014)
v Challenges on Environmental Protest for Large Dam and CO2 emission for Coalv Alternated Option need to be consider ;
Ø Importing Electricity from Neighbouring Countries, Ø Using Imported LNG
6
Domestic Natural Gas & Imported LNG
Domestic Natural Gas & Imported LNG
Kanbauk LNG to Power 1,350MW
Ahlone LNG to Power 356MW
KyaukphuCCGT 135MW
Meelaungyint(Shwethaungyan)
LNG to Power 1,390MW Sout
hern
Grid
(2
75)M
ILES
)Ea
ster
n Gr
id
(616
)MIL
ES)
South West Grid (170)MILES)
Wes
tern
Grid
(777
)MIL
ES)
INDIA
MUSE
North
ern
Grid
(573
)MILE
S)
CHINA
BANGLADESHLAOS
THAILAND
Imported Electricity
7
2030
National Electrification
Plan
As of 2019 June Target
8
Un-electrified
Households –
6.28 Millions
54%
46%
Un-electrified
Households –
5.92 Millions
Electrified
Households -
4.96 Millions
9
2015
202075%
100%
52%
2014
2020
2025
2030
33%End of 2019
50%
75%
100% “Pre-electrification” Options• Solar home systems• Mini-grids : solar, hybrid, diesel,
or micro-hydro where available
Systematic grid network rollout connection plan
2014-15 2015-16 2016-17 2017-18 2018-19Billion Kyats -13 -455 -352 -403 -883
-1,000
-900
-800
-700
-600
-500
-400
-300
-200
-100
0
10
Subsidization to Electricity Price
11
Residential Use of Electricity Tariff (kyats)1kWh – 30kWh 35
31kWh – 50kWh 50
51kWh – 75kWh 70
76kWh – 100kWh 90
101kWh – 150kWh 110
151kWh – 200kWh 120
201kWh and above 125Non-residential Use of Electricity [Commercial, Industrial and Others]
1kWh – 500kWh 125
501kWh – 5,000kWh 135
5,001kWh – 10,000kWh 145
10,001kWh – 20,000kWh 155
20,001kWh – 50,000kWh 165
50,000kWh – 100,000kWh 175
100,001kWh and above 180
Residential Use of Electricity Tariff (kyats)1kWh – 100kWh 35
101kWh – 200kWh 40
201kWh and above 50
Commercial and Industrial1kWh – 500kWh 75
501kWh – 10,000kWh 100
10,001kWh – 50,000kWh 125
50,001kWh – 200,000kWh 150
200,001kWh – 300,000kWh 125
300,001kWh and above 100
Subsidization to Electricity PriceBefore July 2019 After 1st July 2019
Challenging in Investment of Power Project
12
• to utilize least cost resource mix including both supply side and demand side option
• to be ensured reasonable price with fair competition and full accountability
• to be balancing of consumer interests and investor interests
• to minimize the Environmental and Social Impact
• ensure the availability, transferability and convertibility of foreign currency for its payment obligations
• repatriation of the profits of the Company
• pay, or cause buyer to pay, ü any amount that is finally due and
payable by buyer to the Company under the Power Purchase Agreement,