Electricity Solutions Limited (ES) is an Independent ConnectionsProvider offering a full turnkey alternative to the host DistributionNetwork Operators (DNOs) for the design and delivery of electricityconnections . We are fully accredited to work in each DNO region withparticular emphasis across the North West, Midlands and the South.

Electricity Solutions was registered at Companies House in 2006 and startedtrading as a project management company in March 2007. Partial accreditationwas secured by the end of the summer allowing ES to provide electricityconnections under Ofgem’s Competition in Connections initiative, recognisingthe poor service levels offered to housing and industrial/commercial developersby the local utilities. We currently have full accreditation up to 11kV and partialaccreditation up to 66kV.

Our Business StructureElectricity Solutions is wholly owned by Kevin and Gill Bergin who both haveextensive knowledge and experience in the electricity distribution industryhaving worked in Scottish Power and other major utility constructioncompanies.

SectorsTo date we have secured contracts throughout the UK with particular emphasison connections for Utility Scale Solar Projects across the South and the Isle ofWight with major solar developers in this sector. We also aim to continue oursuccess in the Industrial Commercial sectors and have recently appointed anew Business Development Manager with over 30 years in the industry todevelop our order book across the Midlands.

Our PeopleWe are a small but rapidly growing business with a personal approach andunrivalled experience levels throughout our business from Director level to SiteStaff who are committed to delivering excellence to our customers.

Multi-UtilityWe are also able to offer gas and water connections as part of a multi-utilityoffering through working with our preferred partners for the Residential andIndustrial/Commercial sectors.

Restoration and RepairsIn addition to our New Connections division we also undertake emergencysupport and fault repairs for IDNO’s in the North West through our dedicatedjointing teams.

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Page 3: Electricity Solutions Limited (ES ... - Design | Installation

Case Studies...

Page 4: Electricity Solutions Limited (ES ... - Design | Installation

The Installation

• Excavation, installation and reinstatement of 65m of 3 core 185mm2waveform cable to Scottish Power specification.

• Installation of 2 way link box as part of the IDNO interface to terminatethe offsite and onsite cables.

• Planning and co-ordination of off-site route with Wrexham CouncilHighways Department to establish least disruptive and environmentallyfriendly route.

• Lay 15m of 3 core 185mm2 waveform cable to terminate into the onsitemode unit located within the metering room.

• Supply and installation of emergency tripping between substation andgeneration equipment

• 36 Apartments and 1 landlord supply with each apartment beingmetered in metering cupboards outside each apartment.

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Abbey Road, Llandudno, Conwy

36 Apartments – SJ Roberts Construction Ltd

5

Page 5: Electricity Solutions Limited (ES ... - Design | Installation

The Installation

• Supply and installation of Scottish Power approved switchgear with fullinterface protection for generation

• Installation of brick built substation to house the above inclusiveof metering

• Supply and installation of standard Type “A” earthing arrangement

• Lay 1 x 3c HV cable between Pole 6 & Pole 8, and loop new substation inusing 3x 1c HV cable to Scottish Power specification

• Supply and installation of emergency tripping between substation andgeneration equipment

• Supply and installation of private transformer complete with bespokeLV cabinet

• First ICP to undertake a pilot of this configuration of generation connectionin the Scottish Power Distribution Network area

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Park House FarmShawbury, Shrewsbury

Anaerobic Digestion Plant

1

Page 6: Electricity Solutions Limited (ES ... - Design | Installation

The Installation

• Excavation, reinstatement and installation of approximately 350m ofHV cables in order to connect a 3.6 MW Solar Farm to Scottish &Southern’s network

• Supply and Installation of 11kV switchgear complete with protection

• Design and build substation earthing system

• Commissioning of 11kV substation

• Assisting with 3rd party land-owner negotiations

• Construction co-ordination with EPC Contractor

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Chawton Farm Solar PlantLightsource Renewable Energy Ltd

Chawton Farm Solar Plant, Isle of Wight

2

Page 7: Electricity Solutions Limited (ES ... - Design | Installation

The Installation

• Designed, constructed and commissioned 33kV cabling from WPD 33kVcircuit breaker through to LV connection point at each of 4 PV substations

• Designed and constructed a 33kV transformer, 11kV Primary Substationand Metering room within the compound of the existing WPDBlack Ditch Substation

• Installation of Primary Substation including recovery of existing on-sitesubstation and retro-fitted as 5 panel 11kV switchboard

• Installation of 11kV cabling from primary substation to four“packaged” substations

• Supply and installation of four “packaged” substations including substationcompound and civils

• Installation of all terminations of LV cable between substations and PVCollector boxes

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

BNRG Puriton Ltd/Element Power – Joint Venture

Puriton, Bridgewater, Somerset – 4MVA Solar Farm

3

Page 8: Electricity Solutions Limited (ES ... - Design | Installation

The Installation

• Excavation and installation of 650m of twin circuit 300mm HV XLPE cable toScottish Power specification

• Planning and co-ordination of off-site route with Wrexham Council HighwaysDepartment to establish least disruptive and environmentally friendly route

• Installation of 500kVA ‘packaged’ substation, including associated HV cablingand earthing

• Installation of a brick built Substation

• Excavation and installation of 700m LV on-site mains

• 40 apartments in two blocks with 3 communal metering rooms in each block

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Hawk Developments(UK)

40 Apartments, Tenters Square, Wrexham

4

Page 9: Electricity Solutions Limited (ES ... - Design | Installation

The National Electricity Registration Scheme(NERS Accredited)

The National Electricity Registration Scheme (NERSAccredited) is managed by Lloyd’s Register on behalf of theUK Distribution Network Operators (DNO’s). It wasintroduced as part of the process of introducingcompetition into the electrical services market.

To gain accreditation Electricity Solutions were subject torigorous competency assessments and are currentlyaccredited to carry out the following works:

Installation

Cable Laying (LV, 11kV)

Civil Works

Jointing (LV Dead and 11kV)

Substation Installation (11kV)

We also have partial accreditation for the following:

Cable Laying (66kV)

Jointing (66kV)

Substation Installation (66kV)

Overhead Line Wooden Pole (LV, 11kV)

Electrical Design of Distribution Networkscovering:

LV cable networks to Domestic, Industrial and CommercialProperties, HV cable networks 11kV, HV Overhead Networksup to 11kV, S/Station 11kV

We also have partial accreditation for Design in:

HV cable networks 66kV, S/Station 66kV

CHAS

CHAS is established as the market leader for health andsafety pre-qualification in the UK, with over 50,000 suppliersand 570 buyer members on it’s database. To maintain theaccreditation Electricity Solutions are subject to an annualassessment.

The SMAS Worksafe Certificate

The SMAS Worksafe Certificate allows us to demonstrate ourHealth and Safety Competence. SMAS use the Construction(Design and Management) Regulations 2007 “core criteria”or the health and safety module in PAS91 as it’s threshold.

Achilles

Achilles has matured into one of the most thorough andrigorous accreditation schemes. Launched in 2007 it isdesigned to meet the increasingly demanding legislativeand risk management needs of construction clients. Usedby 17 buyer organisations and over 1,500 suppliers in theUK Construction sector Electricity Solutions are proud tohave achieved the accreditation at their first attempt(something 25% of subcontractors fail to achieve).

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Accreditation

Page 10: Electricity Solutions Limited (ES ... - Design | Installation

Kevin BerginManaging Director

Joined Manweb in 1989 and then moved across to Scottish PowerContracting in 1997. Kevin held numerous engineering positions atAlstom, Areva and latterly was Private Networks Manager at BethallPower before forming Electricity Solutions in March 2007.

[email protected]

Gill BerginFinancial Director

Joined Manweb Contracting in 1992 working in the High VoltageDepartment, before going on to work in the Completion departmentof The Mortgage Business within HBOS in 1997. Gill then moved toThe Close Brothers group working in the Asset finance department in2003 before moving to Electricity Solutions in June 2008.

[email protected]

Mark BerginOperations DirectorJoined HBOS in 1984, where he held many management positionsincluding Operations Director and Sales and Marketing Director. Markwent on to hold Director positions at Deutsche Bank and Investecbefore joining Electricity Solutions in September 2013.

[email protected]

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Our Team

Page 11: Electricity Solutions Limited (ES ... - Design | Installation

Electricity Solutions Ltd

Unit 5, Portside Business Park, Portside North, Ellesmere Port, Cheshire CH65 2HQ

0333 202 1012 • Email: [email protected]

Contact us...

We are based in Ellesmere Port in Cheshire and are literally secondsfrom the M53 motorway (junction 8). We are 20 minutes away fromLiverpool, 10 minutes from Chester, and 35 minutes from Manchester.

Contact our Business Development Team on 0333 202 1012,who will be happy to answer any of your questions.