SULTANATE OF OMAN
MINISTRY OF TRANSPORT AND COMMUNICATIONSDirectorate General of Roads and Land Transport
Construction of Batinah Expressway Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 atBatinah Expressway
Part B: Design and Construction of Interchange Nos. 4, 4A
& 5 on Batinah Highway
TENDER DOCUMENT
VOLUME 3 of 4
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
3/200
Construct ion of Batinah Expressway Package 7Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah ExpresswayPart B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah
Highway
TENDER DOCUMENTS
INDEX
Volume 1 of 4: Prime DocumentPart 1 TechnicalPart 2 Financial (To be returned in the envelope with theTender)
Volume 2 of 4: Special Specification
Volume 3 of 4: Bill of Quantities (To be returned in the envelope with theTender)
Book 1 of 3Volume 4 of 4: Tender Drawings Part A
Book 2 of 3
Part B Book 3 of 3
-
8/11/2019 electrical infrastructure
4/200
BILL OF QUANTITIES
TABLE OF CONTENT
Preamble to Bill of Quantities 1 -1
Bill DESCRIPTION PAGESNo.1 Preliminaries 1/1 to 1/7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway
2 Earthworks 2/1 to 2/6
3 Granular Sub Base, Aggregate Base Course and 3/1
Stabilized Base Courses
4 Bituminous Pavement 4/1
5 Concrete and Concrete Structures 5/1 to 5/13
6 Incidental Construction 6/1 to 6/16
7 Road Lighting and Electrical Installation 7/1 to 7/10
9 Utilities 9/1 to 9/28
11 Day works 11/1 to 11/13
Grand Summary - 1 GS-1
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway
2a Earthworks 2a/1 to 2a/6
3a Granular Sub Base, Aggregate Base Course and 3a/1
Stabilized Base Courses
4a Bituminous Pavement 4a/3
5a Concrete and Concrete Structures 5a/1 to 5a/13
6a Incidental Construction 6a/1 to 6a/18
7a Road Lighting and Electrical Installation 7a/1 to 7a/17
9a Utilities 9a/1 to 9a/23
10a Provisional Sum 10a/1
-
8/11/2019 electrical infrastructure
5/200
Construction of Batinah Expressway Package 7Preamble to The Bill of Quantities
Add the following to the 20.1.2 Quantities
f) Amendment shall not be made to these Bills of Quantities without the authority, inwriting, of the Tender Board during the tender stage.
g) The Contractor is to ensure that identical items occurring in separate bills are not pricedat different rates unless this is the Contractors deliberate intention.
h) The prices and rates entered by the Contractor against items in the Bills of Quantitiesshall apply throughout the duration of the Contract to the execution of these items inany location and, except where otherwise provided for, to any additional work ordered
by the Engineer and/or the Employer.
i) A price or rate is to be entered against each item in the Bills of Quantities and the Daywork Schedules and any item left unpriced will be deemed to be included for elsewherein the Bills of Quantities for the Day work Schedules and hence the rate for that item willbe taken as NIL.
j) According to the General Conditions of Contract the Engineer may, if in his opinion it is
necessary or desirable, order in writing that any additional or substituted work shall beexecuted on a day work basis. The Contractor shall be paid for such work at the ratesentered by him in this list. The rates entered herein shall include and be consideredcompensation for the costs incurred for organization of work, overheads, profits, taxes,royalties, fees, payment to third parties for land or the use of land, or for damage toproperty, incidentals, haulage, tools and all other costs necessary for the performanceof the work on a day work basis.
k) Rates quoted under Day Works Schedule would not be used for evaluating cost of any
item of works not listed in the BOQ. The price payable for any new item of work
instructed to be executed shall be reasonable and appropriate and shall be calculated
on the following lines as may be applicable:
(a) Price of comparable item in the Contract
(b) Price quoted for similar works on other contracts
(c) Price based upon Rate Analysis utilizing actual cost of materials, labour and
equipment plus the profit margin
(d) Based upon quotation from qualified sub-contractors in case the work is of such a
nature that a sub-contractor has to be engaged plus the tendered margin.
(e) Based upon rates approved for nominated sub-contractor plus the tendered margin
Rates quoted under Day Works Schedule is meant to be utilized for executing anactivity of incidental nature and which is not susceptible to measurement Amount
-
8/11/2019 electrical infrastructure
6/200
1/1 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs.
1 PRELIMINARIES
CONDITIONS OF CONTRACT
The Contractor is deemed to have carefully studied
and understood and taken into account the provisions
and requirements of the General and Particular
Conditions of Contract. The rates and prices stated in
the Bill of Quantities shall include for all costs of
com liance with the Conditions exce t for the costs
Item No. Item Description UnitEstimated
Quantity
Unit Rate (Rial Omani) Amount
of the items given in this Section 1 and for which a
separate amount is stated herein.
1 General
1.3 Project Site
1.3.5(i)a Soil Investigation and report LS
1.3.5(i)b Confirmatory boreholes at location of Pier & Abutment nr. 12
foundation of bridge, for a minimum depth of 20m or
as directed by the Engineer
Carried to Summary
-
8/11/2019 electrical infrastructure
7/200
1/2 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs.Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.4 Contractor's Site Facili ties
1.4.3(i) Mobilization and demobilization of Contractor's site LS
facilities
1.4.3(ii) Maintenance of Contractor's site facilities month 30
1.5 En ineer's Facilities
1.5.13(i)a Provision of Engineer's Office as per Special month 33
Specifications (1 unit x 33 months) type-1
(RE + QS + AA)
1.5.13(i)b Provision of Engineer's Office as per Special month 30
Specifications (1 unit x 30 months) type-2
1.5.13(ii)a Maintenance of Engineer's Office as per Special month 33
Specifications (1 unit x 33 months) type-1
1.5.13(ii)b Maintenance of Engineer's Office as per month 30
Special Specifications (1 unit x 30 months) type-2
Carried to Summary
-
8/11/2019 electrical infrastructure
8/200
1/3 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs.Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.5 Engineer's Facili ties (Continued)
1.5.13(iii)a Provision of Surveying equipments for the Engineer month 30
as per Specifications
1.5.13(iii)b Provision of One 3D Laser Scanner Surveying Device month 30
for Client including training
1.5.13(iv) Maintenance of Surveying equipments for the Engineer month 30
1.5.13(v)a Provision of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-1 (RE)
1.5.13(v)b Provision of Engineer's Accommodation as per month 66
Special Specifications (2 unit x 33 months) type-2 (QS)
1.5.13(v)c Provision of Engineer's Accommodation as per month 120
Special Specifications (4 unit x 30 months) type-2
(CE, ME & UE,)
1.5.13(v)d Provision of Engineer's Accommodation as per month 300
Special Specifications (10 unit x 30 months) type-3
(SI, MI, LS & AA)Carried to Summary
-
8/11/2019 electrical infrastructure
9/200
1/4 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs.Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.5 Engineer's Facili ties (Continued)
1.5.13(v)e Provision of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-4
1.5.13(vi)a Maintenance of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-1
1.5.13(vi)b Maintenance of Engineer's Accommodation as per month 66
Special Specifications (2 unit x 33 months) type-2
1.5.13(vi)c Maintenance of Engineer's Accommodation as per month 120
Special Specifications (4 unit x 30 months) type-2
1.5.13(vi)d Maintenance of Engineer's Accommodation as per month 300
Special Specifications (10 unit x 30 months) type-3
1.5.13(vi)e Maintenance of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-4
1.5.13(vii) Provision of Site Laboratory as detailed in the month 30
Specifications
Carried to Summary
-
8/11/2019 electrical infrastructure
10/200
1/5 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs.Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.5 Engineer's Facili ties (Continued)
1.5.13(viii) Maintenance of Site Laboratory month 30
1.7 Control of Traffic and Access
1.7.6(i)a Maintenance and Protection of Traffic month 30
1.10 Management Procedures
1.10.6(i) Provision of 5 sets of photographs (294X210mm) month 30
1.10.6(ii) Provision of two sets of Video recordings as month 30
specified
1.11 Submittals
1.11.8(i) Provision of As-built drawings, record drawings, record LS
specifications and miscellaneous records as specified
Carried to Summary
-
8/11/2019 electrical infrastructure
11/200
1/6 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs.Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.14 Contractor's Temporary Works and Services
1.14.8(i) Provision, erection, relocation, maintenance and nr. 2
removal of project signboards (Alluminium)
1.15 Commemorative Plaque and Opening
Ceremon
1.15.4(i) Supply and erection of commemorative plaque nr. 1
1.15.4(ii) Opening ceremony including all facilities LS
Carried to Summary
-
8/11/2019 electrical infrastructure
12/200
1/7 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs.Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
SUMMARY
Page 1/1
Page 1/2
Page 1/3
Page 1/4
Page 1/5
Page 1/6
Carried to General Summary
-
8/11/2019 electrical infrastructure
13/200
BILL OF QUANTITIES
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway
-
8/11/2019 electrical infrastructure
14/200
2/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs.
2 EARTHWORKS
2.1 Clearing and Grubbing
2.1.5(i) Clear site of all trees less than 300mm ,shrubs, sq.m. 1,050,000
vegetation including roots as necessary to
commence work
2.1.5(ii)a Removal and delivery of trees of 300mm trunk nr. 50
diameter or reater
Item No.Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2.1.5(ii)b Removal and disposal of trees of 300mm trunk nr. 50
diameter or greater
2.2 Removal of Structures and Obstructions
2.2.5(i) Removal of existing building, single-storey area nr. 1
500sq.m.
2.2.5(ii) Removal of reinforced concrete (for box culverts) cu.m. 200
2.2.5(iii) Removal of mass concrete (200mm thick) cu.m. 150
Carried to Summary
-
8/11/2019 electrical infrastructure
15/200
2/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(v) Removal of Concrete Curbs lin.m. 1,000
2.2.5(vi) Removal of interlocking tiles in sidewalks and median sq.m. 500
2.2.5(vii) Removal of pipe culvert (900mm diameter) lin.m. 50
2.2.5(viii) Removal and disposal of bituminous pavement cu.m. 18,500
200mm max. thickness in carriageways and paved
areas
2.2.5(x) Removal of steel safety barrier including posts and lin.m. 1,500
foundation
2.2.5(xi) Removal of concrete barrier lin.m. 200
Carried to Summary
-
8/11/2019 electrical infrastructure
16/200
2/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(xii) Removal of sign boards (single post) nr. 20
2.2.5(xviii)a Removal of Mortared Riprap cu.m. 250
2.2.5(xviii)b Removal of Gabion Boxes cu.m. 200
2.2.5(xix) Removal and disposal of Existing Fence with gate lin.m. 50
(up to 2m high)
2.2.5(xx) Removal and disposal of Existing Masonry Wall cu.m. 50(Block Type, up to 2m high)
2.2.5(xxvi)a Removal and delivery for re-use by others of Street nr. 10
Light Pole, to the MRMWR stores or as directed
by Engineer
Carried to Summary
-
8/11/2019 electrical infrastructure
17/200
2/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(xxvi)b Removal and delivery for re-use by others of Flag Pole, nr. 10
to the MRMWR stores or as directed by Engineer
2.3 Roadway Excavation
2.3.6(i) Unclassified excavation to Embankment & Dyke cu.m. 208,600
2.3.6(iii) Unclassified Excavation under water cu.m. 1,000
2.3.6(v) Leveling and Grading for Wadi Training Works cu.m. 329,800
Carried to Summary
-
8/11/2019 electrical infrastructure
18/200
2/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.4 Borrow Materials
2.4.6(i)a Borrow excavation to embankment & Dykes cu.m. 3,254,000
2.6 Sub-grade Construction
2.6.6 i Sub rade re aration in cut s .m. 352,580
2.7 Excavation and Backfilling for st ructures
2.7.6(i) Unclassified structural excavation cu.m. 9,305
(depth 0m to 2.0m)
2.7.6(ii) Unclassified structural excavation cu.m. 6,240
(depth >2.0m to
-
8/11/2019 electrical infrastructure
19/200
2/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
SUMMARY
Page 2/1
Page 2/2
Page 2/3
Page 2/4
Page 2/5
Carried to Grand Summary - 1
-
8/11/2019 electrical infrastructure
20/200
3/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
GRANULAR SUB-BASE, AGREGATE BASE COURSE, AND STABILISED BASE COURSES Bill No. 3
(in figures) (in words) R.O. Bzs.
3 GRANULAR SUB-BASE, AGREGATE BASE
COURSE AND STABILISED BASE COURSES
3.2 Granular Sub-Base Course
3.2.6(ii) Granular Sub-Base Course (Class B) cu.m. 546,400
3.3 Aggregate Base Course
3.3.6 i Crushed A re ate Base Course Class A cu.m. 268,800
Item No.Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
Carried to Grand Summary - 1
-
8/11/2019 electrical infrastructure
21/200
4/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
BITUMINOUS PAVEMENT Bill No. 4
(in figures) (in words) R.O. Bzs.
4 BITUMINOUS PAVEMENT
4.2 Bituminous Materials for Prime Coat
and Tack Coats
4.2.8(i) Bituminous Prime Coat kg. 1,185,400
4.2.8(ii) Bituminous Tack Coat kg. 882,200
4.4 Bituminous Base Course
Item No.Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
4.4.14(i) Bituminous Base Course cu.m. 120,500
4.5 Bituminous Binder and Wearing Courses
4.5.14(i) Bituminous Wearing Course cu.m. 59,650
4.9 Pavement Repairs and Reinstatement
4.9.10(i) Surface milling (up to 50mm thick) sq.m. 5,000
4.12 Surface Ride ability Measurement
4.12.10(i) International roughness index (IRI) for Asphalt lin.m. 235,000
pavement
Carried to Grand Summary - 1
-
8/11/2019 electrical infrastructure
22/200
5/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
5 CONCRETE AND CONCRETE STRUCTURES
5.1 Concrete Materials and Mixes
5.1.7(i)a Unreinforced Concrete Class 16/20 for Bridges, cu.m. 3,195
Retaining walls, Overpasses, Box Culverts and Drains
5.1.7(i)b Reinforced Concrete Class 30/20 MS7 for rectangular cu.m. 1,500
closed drains
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
. . c oncre e ass . n e n orce oncre e cu.m. ,Box Culvert including headwalls, wing walls, apron slabs
and cut-off walls
5.1.7(i)d Post-tensioned Concrete, Class 50/20 MS7 in Cast cu.m. 1,890
in-situ Post-tensioned Box Girders including Integral
Abutment, Hanging Back wall etc.for 12.26m deck width
(For Interchange Bridge )
5.1.7(i)e Reinforced Concrete, Class 45/20 MS7 in Bridge cu.m. 851
abutment, abutment cap and its foundation, Wing wall
etc. (For Interchange Bridge )
5.1.7(i)f Concrete Class 45/20 MS7 in Pile Caps & Footings cu.m. 252
(For Interchange Bridge)
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
23/200
5/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
5 CONCRETE AND CONCRETE STRUCTURES
(Continued)
5.1 Concrete Materials and Mixes (Continued)
5.1.7(i)g Concrete Class 45/20 MS7 in Pier Columns & cu.m. 120
Pier Caps (For Interchange Bridge)
5.1.7(i)h Concrete Class 40/20 MS7 in Approach Slabs including cu.m. 95
all items as indicated on drawings
(For Interchange Bridge)
5.1.7(i)i GRP Cladding to cover space between superstructure sq.m. 11
and Pier column (color to match with Pier)
5.2 Reinforcing Steel
5.2.6(ii)a High tensile steel bar reinforcement, Grade 500, Type 2, t. 798
of any diameter for Interchange bridges
5.2.6(ii)b High tensile steel bar reinforcement of any diameter for t. 3,980
Retaining wall, Box culverts, Underpass and Drains
5.2.6(iii) Fabric wire mesh reinforcement of any size t. 5
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
24/200
5/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
5 CONCRETE AND CONCRETE STRUCTURES
(Continued)
5.4 Prestressed Concrete Structures
5.4.6(i) Prestressing Cables - 0.6" Diameter Strands Grade 270 t. 95
5.10 Waterproof ing for Structures
5.10.6(i) Bitumen Water Proofing Paint for surfaces in contact sq.m. 35,500
w t eart n u verts an oncrete ra ns
5.10.6(ii) Waterproofing Membrane including Protection board sq.m. 914
for Bridge Abutments, Pier and Pier Footing, Hanging
Back Wall etc.
5.10.7.7(i) Waterproofing for Bridge Decks sq.m. 2,069
(isocyanite amine based)
5.12 Load Testing of Bridges
5.12.7(i)a Bridge Loading Test - Testing by Static Load nr. 2
5.12.7(i)b Bridge Loading Test - Testing by Moving Load nr. 2
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
25/200
5/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
6 STRUCTURAL STEEL AND OTHER METALWORK
6.6(i) Metal Access door for box girder bridges nr. 8
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
26/200
5/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
8 DRAINAGE
8.1 Pipe Culverts
8.1.6(ii) Reinforced Precast Concrete Pipe Culvert lin.m. 200
(diameter 1000mm)
8.2 Storm Sewers
8.2.6(i)a Storm Sewer, HDPE Pipe (diameter 300mm) lin.m. 50
8.2.6(i)b Storm Sewer, HDPE Pipe (diameter 400mm) lin.m. 200
8.2.6(i)c Storm Sewer, HDPE Pipe (diameter 500mm) lin.m. 50
8.2.6(i)d Storm Sewer, HDPE Pipe (diameter 600mm) lin.m. 6,000
8.2.6(i)e Storm Sewer, HDPE Pipe (diameter 900mm) lin.m. 50
8.2.6(i)f Storm Sewer, HDPE Pipe (diameter 1000mm) lin.m. 50
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
27/200
5/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
8 DRAINAGE (Continued)
8.2 Storm Sewers (Continued)
8.2.6(i)g Storm Sewer, RC Pipe (diameter 300mm) lin.m. 50
8.2.6(i)h Storm Sewer, RC Pipe (diameter 400mm) lin.m. 50
. . orm ewer, pe ame er mm n.m.
8.2.6(i)j Storm Sewer, RC Pipe (diameter 600mm) lin.m. 50
8.2.6(i)k Storm Sewer, RC Pipe (diameter 900mm) lin.m. 50
8.2.6(i)l Storm Sewer, RC Pipe (diameter 1000mm) lin.m. 450
8.3 Manholes Inlets and Chambers
8.3.6(ii)a Grated Inlet (600mm x 600mm) with DI grating and nr. 20
Locked frame
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
28/200
5/7 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
8 DRAINAGE (Continued)
8.3 Manholes Inlets and Chambers (Continued)
8.3.6(ii)b Grated Inlet (1000mm x 1000mm) with DI grating and nr. 198
Locked frame
8.3.6(ii)c DI grating (1000mm x 1000mm) and Locked frame at nr. 32
Culvert for Median Drainage as shown on Dwg.
(on the top of box culvert)
8.3.6(iii) Curb Inlet (600mm x 600mm) as shown on Dwg. nr. 84
8.4 Drainage of Structures
8.4.6(ii)a Drainage pipe, 100mm uPVC in structure lin.m. 350
8.4.6(ii)b Drainage pipe, 200mm uPVC in structure lin.m. 200
8.4.6(ii)c 150 mm Dia. uPVC perforated pipe wrapped in lin.m. 300
Geotextile
8.4.6(iii) Permeable backing including Geotextile Membrane cu.m. 11,500
8.4.6(iv) Granular backfill cu.m. 3,560
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
29/200
5/8 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
10 PILING
10.1 Piling General
10.1.6(i) Setting up at each 750mm diameter pile location nr. 90
10.1.6(ii)a Piling - Cast in place, 750mm diameter for Pier lin.m. 504
Foundation including reinforcement in piles (Boring piles)
. . ng - as n p ace, mm ame er or n egra n.m. ,
Abutment or Abutment Foundation including
reinforcement in piles (Boring piles)
10.2 Pile Testing
10.2.6(i) Static Load Testing of 750mm diameter expendable nr. 2
piles (including all materials)
10.2.6(ii) Static Load Testing of 750mm diameter working piles nr. 2
10.2.6(iii) Non-destructive Integrity Test as per the Specifications. nr. 90
Carried to Collection Page - 1
-
8/11/2019 electrical infrastructure
30/200
5/9 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
11 BRIDGE ACCESSORIES
11.3 Bearings General
11.3.6(i)a Pot Bearing, (V= 16,000kN - 18,000kN & nr. 2
H =2,000kN - 4,000kN) , Fixed type including supply &
installation
11.3.6(i)b Pot Bearing, (V= 14,000kN - 16,000kN & nr. 2
H =2,000kN - 4,000kN), Guided type including supply &
ns a a on
11.3.6(i)c Pot Bearing, (V= 4,000kN - 6,500kN & nr. 4
H =500kN - 1,500kN), Guided type including supply &
installation
11.3.6(i)d Pot Bearing, (V= 2,000kN - 4,000kN), nr. 4
Free type including supply & installation
11.3.6(i)e Pot Bearing, (V= 4,000kN - 6,000kN ), nr. 4
Free type including supply & installation
Carried to Collection Page - 2
-
8/11/2019 electrical infrastructure
31/200
5/10 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
11 BRIDGE ACCESSORIES (Continued)
11.4 Bridge Expansion Joint
11.4.6(vii) Provide Strip Seal Type Expansion Joint lin.m. 30
(Max. Opening = 60mm & Max. Closing = 30mm)
11.6 Bridge Parapets and Railings
11.6.6(i) Concrete Barrier for Bridge Parapet as shown on Dwg. lin.m. 410
Carried to Collection Page - 2
-
8/11/2019 electrical infrastructure
32/200
5/11 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
COLLECTION PAGE - 1
Page 5/1
Page 5/2
Page 5/3
Page 5/4
Page 5/5
Page 5/6
Page 5/7
Page 5/8
Carried to Summary
C i f B i h E P k 7
-
8/11/2019 electrical infrastructure
33/200
5/12 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
COLLECTION PAGE - 2
Page 5/9
Page 5/10
Carried to Summary
C t ti f B ti h E P k 7
-
8/11/2019 electrical infrastructure
34/200
5/13 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description UnitEstimated
Quantity
SUMMARY
COLLECTION PAGE 1 - 5/11
COLLECTION PAGE 2 - 5/12
Carried to Grand Summary - 1
Construction of Batinah Expressway Package 7
-
8/11/2019 electrical infrastructure
35/200
6/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.
9 SLOPE PROTECTION AND STABILIZATION
9.1 Riprap
9.1.6(i) Loose Stone Riprap (Class B) of varying thickness cu.m. 2,000
for Dyke and slope protection as shown in the Dwg.
9.1.6(ii)a Mortared Stone Riprap (Class A, Varying Thickness) cu.m. 220,000
for Slope Protection and Floodways including Stubs
as per dwg.
Item No.Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
9.1.6(ii)b Mortared Stone Riprap (Class A) for Culvert inlet cu.m. 11,000
& outlet
9.1.6(ii)c Mortared Stone Riprap (Class A) for Dyke as shown cu.m. 550
on dwg.
9.1.6(iv) Geotextile Fabric Filter sq.m. 2,250
9.2 Gabions
9.2.6(i) Gabion lining of varying thickness for wadi bed, slope cu.m. 42,000
protection, culvert inlet, outlet protection and
Floodways as per Dwg.
Carried to Collection Page - 1
Construction of Batinah Expressway - Package 7
-
8/11/2019 electrical infrastructure
36/200
6/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
9 SLOPE PROTECTION AND STABILIZATION
(Continued)
9.9 Ditch Lining
9.9.6(i)a Concrete Ditch Lining (100mm Thick) with wire mesh sq.m. 200
(10mm dia @200mm c/c both ways)
9.9.6(i)b Reinforced Concrete Chute 100mm thick with wire mesh lin.m. 200
(10mm dia @150mm c/c both ways) as per Dwg.
9.9.6(ii) Grouted Stone Ditch lining (200mm thick) sq.m. 10,620
9.12 Mechanically Stabilized Earth Retaining Walls
9.12.7(i) Mechanically Stabilized Earth Retaining Walls sq.m. 1,200
(MSERWs)
9.12.7(ii) Standard Coping for MSERWs lin.m. 80
9.12.7(iii) Concrete Barrier Parapet on MSERWs lin.m. 100
Carried to Collection Page - 1
Construction of Batinah Expressway - Package 7
-
8/11/2019 electrical infrastructure
37/200
6/3 .
Construction of Batinah Expressway Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
12 SIDEWALKS, PAVED AREAS AND CURBS
12.1 Sidewalks, Paved areas and Curbs
12.1.7(ii)a Paving, concrete interlocking blocks 60mm thick sq.m. 35,200
for side walks and median
12.1.7(ii)b Paving, concrete interlocking blocks 80mm thick sq.m. 1,000
for Car parking
12.1.7(v)a Precast Non-Mountable Concrete Curb Type ''A'' lin.m. 18,500
12.1.7(v)b Precast Mountable curb Type ''B'' lin.m. 1,200
12.1.7(v)c Precast flush curb Type ''D'' lin.m. 1,500
12.1.7(v)d Precast concrete edge curb Type ''E'' lin.m. 15,500
Carried to Collection Page - 1
Construction of Batinah Expressway - Package 7
-
8/11/2019 electrical infrastructure
38/200
6/4 .
Construction of Batinah Expressway Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
13 SAFETY BARRIERS AND FENCES
13.1 Roadside Barriers
13.1.7(i) W-Beam Guardrail (Strong post) including lin.m. 131,700
W150 x 13.5 Steel post, reflectors, accessories
and foundations
13.1.7(iii)a End anchorage for approach including post, reflectors, nr. 52
accessories and foundations
13.1.7(iii)b End anchorage for approach nr. 12
(Guard Rail-Concrete Barrier transition)
13.1.7(iii)c W-Beam Guardrail connection with Concrete barrier nr. 12
as indicated in the Drawing
13.1.7(iii)d W-Beam Guardrail Terminal section for Departure end nr. 52
including post, reflectors, accessories and foundations
13.1.7(vii)a Precast Concrete barrier, Single face as shown lin.m. 4,500
in the Dwg.
13.1.7(vii)b Heavy Duty Concrete barrier, Single face as shown lin.m. 180
in the Dwg.
Carried to Collection Page - 1
Construction of Batinah Expressway - Package 7
-
8/11/2019 electrical infrastructure
39/200
6/5 .
p y g
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
13 SAFETY BARRIERS AND FENCES (Cont inued)
13.1 Roadside Barriers (Continued)
13.1.7(ix) Concrete barrier, transition section lin.m. 600
13.1.7(x) Impact attenuator, Quad Beam type, with expandable nr. 2
modules/cartridges, including new foundation, slab
with reflective studs and connection to the concrete
13.4 Delineators
13.4.6(i)a Floodway markers, painted white & red as shown on nr. 25
Dwg. Including anchor bolt
13.4.6(i)b Floodway water depth guage as shown on Dwg. nr. 8
Including anchor bolt
Carried to Collection Page - 1
Construction of Batinah Expressway - Package 7
-
8/11/2019 electrical infrastructure
40/200
6/6 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
14.1 Traffic Signs
14.1.7(i)a Highway sign, Triangular Side (750mm) nr. 15
14.1.7(i)b Highway sign, Triangular Side (900mm) nr. 33
. . c g way s gn, r angu ar e mm nr.
14.1.7(i)d Highway sign, Triangular Side (1500mm) nr. 2
14.1.7(ii)a Highway sign, Circular (Diameter 750mm) nr. 47
14.1.7(ii)b Highway sign, Circular (Diameter 900mm) nr. 10
14.1.7(ii)c Highway sign, Circular (Diameter 1200mm) nr. 2
Carried to Collection Page - 1
Construction of Batinah Expressway - Package 7
-
8/11/2019 electrical infrastructure
41/200
6/7 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iii)a Chevron Signs, rectangular [2100 mm x 600 mm] sq.m. 10
14.1.7(iii)b Chevron Signs, rectangular [2400 mm x 600 mm] sq.m. 10
14.1.7(iii)c Chevron Signs, rectangular [380 mm x 600 mm] sq.m. 50
14.1.7(iii)d Highway Signs, rectangular [750x1400] sq.m. 10
14.1.7(iii)e Highway Signs, rectangular [600x800] sq.m. 5
14.1.7(iii)f Supplementary plate, rectangular [1200 mm x 700 mm] sq.m. 5
14.1.7(iii)g Supplementary plate, rectangular [1500 mm x 700 mm] sq.m. 5
Carried to Collection Page - 1
6/8
Construction of Batinah Expressway - Package 7
-
8/11/2019 electrical infrastructure
42/200
6/8 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iii)h Rectangular or Polygonal Sign Face (Area 1-2 sq m) sq.m. 20
14.1.7(iii)i Rectangular or Polygonal Sign Face (Area 2-4 sq m) sq.m. 40
14.1.7(iii)j Rectangular Sign Face (Area 4-6 sq m) sq.m. 50
Carried to Collection Page - 1
6/9
Construction of Batinah Expressway - Package 7
P t A Li k R d 2 4 4A d I t h N 2 t B ti h E P N
-
8/11/2019 electrical infrastructure
43/200
6/9 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iv) Octagonal Road signs (Height 900mm) nr. 8
14.1.7(v)a Sign post support assembly G.I pipe 100mm Dia. nr. 121
Including foundation and painting of post
14.1.7(v)b Multi-post Sign Support Assembly, Type PI posts, nr. 22
complete including foundation, painting
(black and white) etc.
14.1.7(v)c Multi-post Sign Support Assembly, Type PII posts, nr. 4
complete including foundation, painting
(black and white) etc.
14.1.7(v)d Multi-post Sign Support Assembly, Type PIII posts, nr. 8
complete including foundation, painting
(black and white) etc.
14.1.7(v)e Multi-post Sign Support Assembly, Type PIV posts, nr. 4
complete including foundation, painting
(black and white) etc.
Carried to Collection Page - 2
6/10
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No
-
8/11/2019 electrical infrastructure
44/200
6/10 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.2 Road Markings
14.2.6(i)a Traffic Lines, Type L1/2(120) White sq.m. 5,500
(Mechanical application)
14.2.6(i)b Traffic Lines, Type L1/3(120) White sq.m. 300
(Mechanical application)
14.2.6(i)c Traffic Lines, Type L2A(120) White sq.m. 900
(Mechanical application)
14.2.6(i)d Traffic Lines, Type L2/1(120) White sq.m. 4,000
(Mechanical application)
14.2.6(i)e Traffic Lines, Type L2/2(120) White sq.m. 600
(Mechanical application)
14.2.6(i)f Traffic Lines, Type L4/1(150) Yellow sq.m. 100
(Mechanical application)
14.2.6(i)g Traffic Lines, Type L4/2(120) Yellow sq.m. 28,500
(Mechanical application)
Carried to Collection Page - 2
6/11
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No
-
8/11/2019 electrical infrastructure
45/200
6/11 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.2 Road Markings (Continued)
14.2.6(i)h Traffic Lines, Type L5/1(150) White sq.m. 50
(Mechanical application)
14.2.6(i)i Traffic Lines, Type L5/2(120) White sq.m. 900
(Mechanical application)
14.2.6(i)j Traffic Lines, Type L7(400) White sq.m. 50
(Mechanical application)
14.2.6(i)k Traffic Lines, Type L8(200) White sq.m. 300
(Mechanical application)
14.2.6(iii)a Special Marking , Pedestrian Crossing sq.m. 1,200
14.2.6(iii)b Special Marking , Chevrons Marking S9 sq.m. 2,200
14.2.6(iii)c Special Marking , Lane Selection Arrow White (S3/1) sq.m. 120
Carried to Collection Page - 2
6/12 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No
-
8/11/2019 electrical infrastructure
46/200
6/12 .Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.2 Road Markings (Continued)
14.2.6(iii)d Special Marking , Lane Selection Arrow White (S4/1) sq.m. 120
14.2.6(iii)e Special Marking , Lane Selection Arrow White (S5/1) sq.m. 120
14.2.6(iii)f Special Marking , Lane Selection Arrow White (S7/1) sq.m. 120
14.2.6(iii)g Special Marking , Lane Selection Arrow White (S8/1) sq.m. 120
14.2.6(iv) Curb painting sq.m. 11,010
Carried to Collection Page - 2
6/13 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2 4 4A and Interchange No 2 at Batinah Expressway Page No
-
8/11/2019 electrical infrastructure
47/200
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.3 Road Studs
14.3.6(i)a Reflecting Road Studs (Double face, Red color) nr. 1,200
14.3.6(i)b Reflecting Road Studs (Single face, Red color) nr. 7,800
14.3.6(i)c Reflecting Road Studs (Single face, White color) nr. 3,800
14.3.6(iii) Provide removable bollards in the median opening nr. 30
and one fixed bollard at each ends as shown in
the Dwg. for R.O.P. including chain and lock
Carried to Collection Page - 2
6/14 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
-
8/11/2019 electrical infrastructure
48/200
, , g p y g
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
COLLECTION PAGE - 1
Page 6/1
Page 6/2
Page 6/3
Page 6/4
Page 6/5
Page 6/6
Page 6/7
Page 6/8
Carried to Summary
6/15 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
-
8/11/2019 electrical infrastructure
49/200
g p y g
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
COLLECTION PAGE - 2
Page 6/9
Page 6/10
Page 6/11
Page 6/12
Page 6/13
Carried to Summary
6/16 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
-
8/11/2019 electrical infrastructure
50/200
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs.Item No.
Estimated
Quantity
Unit Rate (Rial Omani) AmountItem Description Unit
SUMMARY
COLLECTION PAGE 1 - 6/14
COLLECTION PAGE 2 - 6/15
Carried to Grand Summary - 1
7/1 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
-
8/11/2019 electrical infrastructure
51/200
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION
15.1 General
15.1.20(i) Power Supply connection to the feeder pillar nr. 53
15.1.20(ii) Spare Parts (5%) as per the approved list LS
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15.3 Package Sub-stations
15.3.6(i)a Supply and installation of Electrical Sub-station with nr. 1
1Nr RMU,1Nr 500 KVA Transformer and 800 A feeder
pillar, including building, cable terminations, testing,
commissioning and all civil works and other
accessories necessary to complete the system
functional
15.3.6(i)b Supply and installation of Electrical Sub-station with nr. 1
1Nr RMU, 1Nr OLU, 1Nr 500 KVA Transformer and
800 A feeder pillar, including building, cable
terminations, testing, commissioning and all civil works
and other accessories necessary to complete the
system functional
Carried to Summary
7/2 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
-
8/11/2019 electrical infrastructure
52/200
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.5 33kV and 11kV Pole Mounted TransformerSub-stations
15.5.6(ii)a Supply and installation of 11kV pole mounted nr. 12
transformer sub-station, 100KVA with 1 way LV panel
including H-pole transformer mounting structure,
earthin , connections and other accessories
necessary to complete the system functional
15.5.6(ii)b Supply and installation of 11kV pole mounted nr. 1
transformer sub-station, 100KVA with 2 way LV panel
including H-pole transformer mounting structure,
earthing, connections and other accessories
necessary to complete the system functional
15.5.6(ii)c Supply and installation of 11kV pole mounted nr. 1
transformer sub-station, 200KVA with 2 way LV panel
including H-pole transformer mounting structure,
earthing, connections and other accessories
necessary to complete the system functional
Carried to Summary
7/3 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
53/200
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.5 33kV and 11kV Pole Mounted TransformerSub-Stations (Continued)
15.5.6(ii)d Supply and installation of 11kV pole mounted nr. 1
transformer sub-station, 200KVA with 1 way LV panel
including H-pole transformer mounting structure,
earthin , connections and other accessories
necessary to complete the system functional
15.6 Feeder Pillars
15.6.6(i)a Supply and install Mini Feeder Pillars, 400 A, 4way nr. 2
15.6.6(i)b Supply and install Street Lighting Feeder Pillars, 100 A nr. 51
Carried to Summary
7/4 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
54/200
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.7 Electrical Cables
Supply 4-Core cabling, copper conductor,
XLPE insulated, Steel Wire armoured,
PVC sheathed, 600/1000V rating, as fo llows:
15.7.6 i a Nominal Conductor Area 25mm2 lin.m. 84,000
15.7.6(i)b Nominal Conductor Area 95mm2 lin.m. 4,500
15.7.6(i)c Nominal Conductor Area 120mm2 lin.m. 2,500
15.7.6(i)d Nominal Conductor Area 240mm2 lin.m. 1,000
15.7.6(ii)a Termination on 25mm2 cabling nr. 115
Carried to Summary
7/5 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
55/200
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.7 Electrical Cables (Continued)
15.7.6(ii)b Termination on 95mm2 cabling nr. 30
15.7.6(ii)c Termination on 120mm2 cabling nr. 150
15.7.6(ii)d Termination on 240mm2 cabling nr. 10
15.8 Road Light ing Masts, Columns and Luminaries
15.8.6(i) Supply, install and commission Galvanized steel nr. 20
lighting column polygon (Mid hinged Type) 25m high
mast with 4 x 600 Watt HPSV luminaries fixed on
bracket complete with fused cut out, control gear,
wiring, connection etc
Carried to Summary
7/6 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
56/200
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.8 Road Light ing Masts, Columns and Luminaries(Continued)
15.8.6(ii)a Supply, install and commission Galvanized steel nr. 1,354
lighting column polygon (Mid hinged Type) 14m high
pole/column with 1 x 400 Watt HPSV luminaries
fixed on bracket com lete with fused cut out,
control gear, wiring, connection etc
15.8.6(ii)b Supply, install and commission Galvanized steel nr. 676
lighting column polygon (Mid hinged Type) 14m high
pole/column with 2 x 400 Watt HPSV luminaries on
bracket complete with fused cut out, control gear,
wiring, connection etc
15.8.6(iii) Column / high mast testing LS
Carried to Summary
7/7 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
57/200
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.10 Under Bridge Light ing
15.10.6(i) Under bridge surface mounted lighting including nr. 32
Conduits, Cables, 150W High Pressure Sodium
Lanterns, Junction Boxes, including Supply,
Installation, Testing and Putting into service complete
15.15 Earth ing
15.15.7(i) Supply and install Twin rod earthing installation at nr. 53
street lighting feeder pillars
15.15.7(ii) Supply and install Single rod earthing installation nr. 150
at the end of street lighting circuits
15.17 Civil Works for Electri cal Installations
15.17.6(vi)a Supply and install Pre-cast concrete foundation for nr. 2
mini feeder pillars as per Dwg. including Bolts and
any other accessories required for installation.
Carried to Summary
7/8 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
58/200
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.17 Civil Works for Electri cal Installations(Continued)
15.17.6(vi)b Supply and install Pre-cast concrete foundation for nr. 51
street lighting feeder pillars as per Dwg. including
Bolts and any other accessories required for
installation.
15.17.6(vii)a Trench for low voltage cable for one cable lin.m. 84,000
15.17.6(vii)b Trench for low voltage cable for two cable lin.m. 4,500
15.17.6(vii)c Trench for low voltage cable for three cable lin.m. 3,500
15.17.6(ix) Supply and install Precast Concrete Foundation for nr. 2,030
columns 14m high pole/column as per Dwg. including
Base plate, Bolts, Hexagonal nuts, washers,
uPVC ducts and any other accessories required
for installation
Carried to Summary
7/9 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
59/200
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.17 Civil Works for Electrical Installations(Continued)
15.17.6(x) Supply and install Precast Concrete Foundation for nr. 20
25m high mast as per Dwg. including Base plate,
Bolts, Hexagonal nuts, washers, uPVC ducts and
an other accessories re uired for installation
Road Crossing Ducts
15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with lin.m. 2,250
concrete encasement
15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lin.m. 1,600
lighting with concrete encasement
15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with lin.m. 1,600
concrete encasement
15.17.6(xii)d 6Way 150 mm Upvc duct for street lighting with lin.m. 500
concrete encasement
Carried to Summary
7/10 .
Construct ion of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
-
8/11/2019 electrical infrastructure
60/200
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) AmountItem No. Item Description Unit
Estimated
Quantity
SUMMARY
Page 7/1
Page 7/2
Page 7/3
Page 7/4
Page 7/5
Page 7/6
Page 7/7
Page 7/8
Page 7/9
Carried to Grand Summary - 1
9/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill N 9
-
8/11/2019 electrical infrastructure
61/200
UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs.
18 UTILITIES
18.1 Locating and Protecting Existing Utilit ies
Water Utility
18.1.6(i)a Concrete protection slab for existing water lines/ducts lin.m. 100
300 mm dia (Class 25/20)
Gas Line Utility
''
Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity
. . . .
excavation, backfilling, concreting (Class 35/20),reinforcement etc as per drawings but excluding any
roadway related items over the culvert, as per OGC
specification and requirements
18.1.6(i)c Utility culvert for protection of 16'' Gas line including lin.m. 145
excavation, backfilling, concreting (Class 35/20),
reinforcement etc as per drawings but excluding any
roadway related items over the culvert, as per OGCspecification and requirements
Carried to Collection Page - 1
9/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No 9
-
8/11/2019 electrical infrastructure
62/200
UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Exist ing Utili ties (Continued)
Oil Line Utility
18.1.6(i)d Utility culvert for protection for 24'' oil line including lin.m. 75
excavation, backfilling, concreting (Class 35/20),
reinforcement etc as per drawings but excluding
embankment for roadway over the culvert as per
ORPC (Oman Refineries & Petroleum Chemicals)
Electrical Utility
18.1.6(i)e Supply and Install proposed 2way 200mm dia Upvc lin.m. 110
and 2way 50mm Split duct to protect the existing
underground 33kv electrical cables complete with
concrete protection (class 25/20) including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. at locations shown in the drawingsor as directed by the Engineer
Carried to Collection Page - 1
9/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No 9
-
8/11/2019 electrical infrastructure
63/200
UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Exist ing Utili ties (Continued)
18.1.6(i)f Supply and Install proposed 2way 150mm and 2way lin.m. 50
50mm dia uPVC Split duct to protect the existing
underground 11kv electrical cables complete with
concrete protection (class 25/20) including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. at locations shown in the drawings
or as directed by the Engineer
Telephone Utili ty
18.1.6(i)g Supply and install 4way 100mm dia Upvc Split duct lin.m. 60
to protect existing Omantel / Nawras / MOD cables
complete with concrete protection (class 25/20)
including excavation, backfilling, duct marker and
compaction etc. at locations shown in the drawings
or as directed by the Engineer as per Omantel /
Nawras / MOD Standards and Specifications
Carried to Collection Page - 1
9/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No 9
-
8/11/2019 electrical infrastructure
64/200
UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Exist ing Utili ties (Continued)
18.1.6(i)h Supply and install 2way 100mm dia and 2way 100mm lin.m. 50
dia Upvc Split duct to protect existing Omantel /
Nawras / MOD cables complete with concrete protection
(class 25/20) including excavation, backfilling, duct
marker and compaction etc. at locations shown in the
drawings or as directed by the Engineer as per Omantel/
Nawras / MOD Standards and Specifications
18.2 Removing and Disposing or RelocatingExisting Utilities
Electrical Utility
18.2.6(i)a Carefully disconnect and remove existing LV overhead lin.m. 1,040
electrical Cable any size including poles stay
insulators and any other accessories existing wires,
and dispose of same to the locations as directedby the Engineer
18.2.6(i)b Carefully disconnect and remove existing LV lin.m. 1,300
underground electrical cables and any other
accessories existing and dispose of same to the
locations as directed by the Engineer
Carried to Collection Page - 1
9/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
65/200
UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(i)c Carefully disconnect and remove existing 11KV lin.m. 11,100
overhead electrical conductors including poles stay
wires, insulators and any other accessories existing
and dispose of same to the locations as directed
by the Engineer
. . . .
underground electrical cables and any otheraccessories existing and dispose of same to the
locations as directed by the Engineer
18.2.6(i)e Carefully disconnect and remove existing 33KV lin.m. 1,520
overhead electrical conductors including poles stay
wires, insulators and any other accessories existing
and dispose of same to the locations as directed
by the Engineer
18.2.6(i)f Carefully disconnect and remove existing 33KV lin.m. 220
underground electrical cables and any other
accessories existing and dispose of same to the
locations as directed by the Engineer
Carried to Collection Page - 1
9/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
66/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(i)g Carefully disconnect and remove existing 132KV lin.m. 800
overhead electrical conductors, Double Circuit
(6 conductor together) including insulatorsand other
accessories existing and dispose of same to the
locations as directed by the Engineer (Quantity
measured as Route length).
18.2.6(i)h Carefully disconnect and remove existing 132KV nr. 3electricity pylons including foundation, excavation,
backfilling and any other accessories existing and
dispose of same (except foundation) to the locations
as directed by the Engineer
18.2.6(i)i Carefully disconnect and remove existing 220KV lin.m. 1,500
overhead electrical conductors, Double Circuit
(6 conductor together) including insulatorsand otheraccessories existing and dispose of same to the
locations asdirected by the Engineer (Quantity
measured as Route length).
Carried to Collection Page - 1
9/7 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
67/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(i)j Carefully disconnect and remove existing 220KV nr. 2electricity pylons including foundation, excavation,
backfilling and any other accessories existing and
dispose of same (except foundation) to the locations
as directed by the Engineer
18.2.6(i)k Locate excavate down to and remove the existing lin.m. 300
110mm diameter AC/DI pipe including but not limited
to valve chambers, Fire hydrants and all other
accessories complete and dispose of same to the
locations as directed by the Engineer including
excavation, backfill, disposal, disconnection ,etc
18.2.6(i)l Locate excavate down to and remove the existing lin.m. 300800mm diameter CS pipe including but not limited
to valve chambers, Fire hydrants and all other
accessories complete and dispose of same to the
locations as directed by the Engineer including
excavation, backfill, disposal, disconnection ,etc
Carried to Collection Page - 1
9/8 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
68/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Telephone Utili ty
18.2.6(i)m Locate, excavate down, disconnect and remove lin.m. 600
existing telephone cables and ducts, chambers and
dispose of same (except chambers) to the locations
as directed by the Engineer including excavation,
, .
For Electrical: All LV, 11KV/33KV Electrical
Relocation work inc luding materials shall be as
per MEDC/Mazoon/Majan Electricity Distribution
Company Standards and Specifications.
18.2.6(ii)a Carefully disconnect and Relocate existing 11KV nr. 2
substation with 500KVA TX+ 1 No. and 800 A Feeder
pillar locations as directed by the Engineer includingfoundation, jointing, excavation & connecting to the
existing supply, testing, commissioning, all civil works
and other accessories necessary to complete the
system functional
Carried to Collection Page - 1
9/9 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
69/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(ii)b Carefully disconnect and Relocate existing 11KV nr. 1substation with 500KVA TX+ 1 No. RMU+1 No. OLU
and 1000 A Feeder pillar locations as directed by
the Engineer including foundation, jointing, excavation
& connecting to the existing supply, testing,
commissioning, all civil works and other accessories
18.2.6(ii)c Remove and Relocate Underground MRM&WR Borewell nr. 2
with existing equipment complete with new structure,
pipe work, all electro mechanical work and necessary
work to complete system to make functional
18.2.6(ii)d Remove and Relocate Rain Water Monitoring Station nr. 1
(MRM&WR) existing equipment complete with new
structure, pipe work, all electro mechanical work andnecessary work to complete system to make functional
Carried to Collection Page - 2
9/10 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
70/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Provide and install new utilities
18.2.6(iii)a Supply and installation of overhead LV electrical lin.m. 1,650
Cable including poles, stay wires, insulators,
jumpers, stringing, jointing, excavation & backfilling
of poles, connecting to the existing supply, testing,
, ,
necessary labor, operation, materials, accessories,earthing.
18.2.6(iii)b Supply and installation of underground proposed LV lin.m. 1,095
cable (4C x 240 Sq.mm) complete including excavation,
backfilling, cable covering tiles, warning tapes, joints,
connecting to the existing supply, testing,
commissioning, carting spoil to tips as directed, all
necessary labor, operation, materials and any otheraccessories including earthing, etc
Carried to Collection Page - 2
9/11 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
71/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)c Supply and installation of overhead 11 KV electrical lin.m. 5,500conductors (3 conductors together) for Street Lighting
complete including poles, stay wires, insulators, AB
switches, lightning arrestors, jumpers, stringing,
jointing, excavation & backfilling of poles, connecting
to the existing supply, testing, commissioning,
, ,
operation, materials, accessories, earthing and anyspecial protection to the poles (Wadi Area).
(Quantity measured as Route length).
18.2.6(iii)d Supply and installation of underground proposed lin.m. 1,000
11KV Electrical cable for Street Lighting complete
including excavation, backfilling, cable covering tiles,
warning tapes, route markers, joints, connecting to
the existing supply, testing, commissioning, cartingspoil to tips as directed, all necessary labor,
operation, materials and any other accessories
including earthing, etc.
Carried to Collection Page - 2
9/12 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
72/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)e Supply and installation of overhead 11 KV electrical lin.m. 7,350conductors (3 conductors together) complete
including poles, stay wires, insulators, AB
switches, lightning arrestors, jumpers, stringing,
jointing, excavation & backfilling of poles, connecting
to the existing supply, testing, commissioning,
, ,
operation, materials, accessories, earthing and anyspecial protection to the poles (Wadi Area).
(Quantity measured as Route length).
18.2.6(iii)f Supply and installation of underground proposed lin.m. 5,220
11KV Electrical cable complete including
excavation, backfilling, cable covering tiles,
warning tapes, route markers, joints, connecting to
the existing supply, testing, commissioning, cartingspoil to tips as directed, all necessary labor,
operation, materials and any other accessories
including earthing, etc.
Carried to Collection Page - 2
9/13 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
73/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)g Supply and installation of underground proposed lin.m. 2,00033KV Electrical cable complete including excavation,
backfilling, cable covering tiles, warning tapes, joints,
connecting to the existing supply, testing,
commissioning, carting spoil to tips as directed, all
necessary labor, operation, materials and any other
, .
18.2.6(iii)h Supply and installation of proposed overhead 132KV lin.m. 900
Electrical AAAC Twin YEW Conductors, Double
Circuit (6 conductor together) including insulators,
warning lights, ground wire, connecting to the existing
supply, testing, commissioning, carting spoil to tips
as directed, all necessary labor, operation, materials
and any other accessories including earthing, etc.
complete as per OETC Standards & Specifications(Quantity measured as Route length).
18.2.6(iii)i Design, Supply, Install, Testing and Commissioning nr. 2
132KV electricity pylons (Tension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
Carried to Collection Page - 2
9/14 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
74/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)j Design, Supply, Install, Testing and Commissioning nr. 2132KV electricity pylons (Suspension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
. . . . ,
Electrical AAAC Twin YEW Conductors, Double
Circuit (6 conductor together) including insulators,
warning lights, ground wire, connecting to the existing
supply, testing, commissioning, carting spoil to tips
as directed, all necessary labor, operation, materials
and any other accessories including earthing, etc.
complete as per OETC Standards & Specifications
(Quantity measured as Route length).
Carried to Collection Page - 2
9/15 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
75/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)l Supply and installation of underground proposed lin.m. 300220KV Electrical cables (Double Circuit, 12nr. Single
core cable) complete including
excavation, backfilling, cable covering tiles,
warning tapes, joints, connecting to the existing
supply, testing, commissioning, carting spoil to tips
, , ,
and any other accessories including earthing, etc.
18.2.6(iii)m Design, Supply, Install, Testing and Commissioning nr. 1
220KV electricity pylons (Tension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
18.2.6(iii)n Design, Supply, Install, Testing and Commissioning nr. 1
220KV electricity pylons (Suspension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
Carried to Collection Page - 2
9/16 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
76/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Supply & Installation of New Water Lines: TheNew Pipe lines installed to replace affected pipe
lines should have all the fittings, accessories,
Valves (Gate valves, Drain valves, Air Valves, etc),
Fire Hydrants, any other specials and related
Chambers complete necessary to reinstate the
on the Drawings
18.2.6(iii)o Supply and install 110mm HDPE Water pipes (PN16) lin.m. 500
complete with all the specials, fittings, and chambers
including but not limited to tees, bends, shut off valves,
air valves, washout valves, Fire hydrants, thrust blocks
etc and also excavation, backfilling, warning tape,
bedding and surrounding, jointing to existing water pipe
and jointing material, Flushing, Disinfecting, pressuretesting and any other items necessary to complete
the work
Carried to Collection Page - 2
9/17 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
77/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)p Supply and install 800mm CS Water pipes lin.m. 300complete with all the specials, fittings, and chambers
including but not limited to tees, bends, shut off valves,
air valves, washout valves, Fire hydrants, thrust blocks
etc and also excavation, backfilling, warning tape,
bedding and surrounding, jointing to existing water pipe
, , ,
testing and any other items necessary to complete
the work
18.2.6(iii)q Supply and install 4Way uPVC duct for telephone lin.m. 50
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
18.2.6(iii)r Supply and install 2Way uPVC duct for telephone lin.m. 420
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
Carried to Collection Page - 3
9/18 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
78/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)s Supply and install 1Way uPVC duct for telephone lin.m. 50cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
18.2.6(iii)t Supply, install and laying EEF 100x0.65 telephone lin.m. 210
cable including jointing, jointing material and any
other items necessary to complete and commission
the work
18.2.6(iii)u Supply, install and laying EEF 200x0.65 telephone lin.m. 210
cable including jointing, jointing material and any
other items necessary to complete and commission
the work
Carried to Collection Page - 3
9/19 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9
-
8/11/2019 electrical infrastructure
79/200
(in figures) (in words) R.O. Bzs.Unit Rate (Rial Omani) AmountItem No. Item Description Unit EstimatedQuantity
18 UTILITIES (Continued)
18.3 Service / Future Utilit y Road Crossing Ducts
18.3.6(i)a Supply and Install proposed 9way 200mm and 2way lin.m. 150
100mm dia uPVC duct for 132kv electrical cables withconcrete protection (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in
the drawings or as directed by the Engineer
18.3.6(i)b Supply and Install proposed 9way 200mm and 2way lin.m. 150
100mm dia uPVC duct for 220kv electrical cables with
concrete protection (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in
the drawings or as directed by the Engineer
18.3.6(i)c Supply and Install proposed 2way 100mm dia lin.m. 200uPVC duct for electrical cables with concrete
surround (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawi