08/14/2022 CONFIDENTIAL - TECHNIP, USA document.xlsx page 1 of 32 0 BUDGETARY ESTIMATE - PRE ESA PROJECT BASIS PROJECT BASIS Rev. A Revision Revision Description A Revision Date Revision Date Prepared By

Upload: kevin-j-mills

Post on 09-Nov-2014

100 views

Category:

Documents


16 download

DESCRIPTION

lights camera action

TRANSCRIPT

Page 1: Electrical Cost Estimate Abridged

04/08/2023 CONFIDENTIAL - TECHNIP, USA document.xlsx page 1 of 16

0

BUDGETARY ESTIMATE - PRE ESAPROJECT BASIS

PROJECT BASIS

Rev. A

Revision Revision DescriptionA

Revision Date

Revision Date

Prepared By

Checked By

Approved By

Page 2: Electrical Cost Estimate Abridged

04/08/2023 CONFIDENTIAL - TECHNIP, USA document.xlsx page 2 of 16

0

BUDGETARY ESTIMATE - PRE ESAPROJECT BASIS

Page 3: Electrical Cost Estimate Abridged

04/08/2023 CONFIDENTIAL - Technip North America file:///tt/file_convert/545e8407b1af9f03088b45ad/document.xlsx page 3 of 16

0

BUDGETARY ESTIMATE - PRE ESA

EQUIPMENT SETTING COST ESTIMATE

123456789

10111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061

Page 4: Electrical Cost Estimate Abridged

04/08/2023 CONFIDENTIAL - Technip North America file:///tt/file_convert/545e8407b1af9f03088b45ad/document.xlsx page 4 of 16

0

BUDGETARY ESTIMATE - PRE ESA

EQUIPMENT SETTING COST ESTIMATE

123456789

10111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061

Page 5: Electrical Cost Estimate Abridged

0

BUDGETARY ESTIMATE - PRE ESA

EQUIPMENT SETTING COST ESTIMATE

123456789

1011121314151617181920212223242526272829303132333435363738

###

Page 6: Electrical Cost Estimate Abridged

0

BUDGETARY ESTIMATE - PRE ESA

EQUIPMENT SETTING COST ESTIMATE

123456789

101112131415161718192021222324252627282930313233343536373839

Page 7: Electrical Cost Estimate Abridged

0

BUDGETARY ESTIMATE - PRE ESA

EQUIPMENT SETTING COST ESTIMATE

40

Page 8: Electrical Cost Estimate Abridged

04/08/2023 CONFIDENTIAL - Technip North America file:///tt/file_convert/545e8407b1af9f03088b45ad/document.xlsx page 8 of 16

0

BUDGETARY ESTIMATE - PRE ESA

EQUIPMENT SETTING COST ESTIMATE

123456789

10111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061

Page 9: Electrical Cost Estimate Abridged

04/08/2023 CONFIDENTIAL - Technip North America file:///tt/file_convert/545e8407b1af9f03088b45ad/document.xlsx page 9 of 16

0

BUDGETARY ESTIMATE - PRE ESA

EQUIPMENT SETTING COST ESTIMATE

123456789

10111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061

Page 10: Electrical Cost Estimate Abridged

TECHNIP CONFIDENTIAL

BUDGETARY ESTIMATE - PRE ESA

NFPA 70 - NEC; HAZARDOUS ZONES, DIVISIONS, & CLASSES

1 OHSA Publication 30732 Hazardous locations are areas where flammable liquids, gases or vapors or combustible dusts exist in sufficient quantities to produce an explosion or fire. In hazardous locations, specially designed equipment and special 3 installation techniques must be used to protect against the explosive and flammable potential of these substances.45678 Flammables9 ignition

10 PROCESS AREAS gas liquids solids source protection method hazard exposure Class Zone Group11 100 MATERIAL HANDLING12 200 REACTOR TRAIN x x hot surface isolate hazard, pressurized I 213 100 MATERIAL HANDLING14 100 MATERIAL HANDLING15 100 MATERIAL HANDLING16 101 MATERIAL HANDLING17 102 MATERIAL HANDLING18192021222324252627282930313233343536373839404142434445

Page 11: Electrical Cost Estimate Abridged

TECHNIP CONFIDENTIAL

123456789

101112131415161718192021222324252627282930313233343536373839404142434445

Page 12: Electrical Cost Estimate Abridged

TECHNIP CONFIDENTIAL

Page 13: Electrical Cost Estimate Abridged

TECHNIP CONFIDENTIAL

confine explosion, flame-proof Zone 0; ignitable gases present continuouslyconfine explosion, powder filled Zone 0; ignitable gases present long timesincreased safety Zone 1; ignitable gases normally existisolate hazard, pressurized Zone 1; ignitable gases frequently exist by repairs or leaksisolate hazard, oil-filled Zone 2; ignitable gases not likelyisolate hazard, potted Zone 2; ignitable gases for a short periodlimit energy, intrinsically safe Zone 2; ignitable gases due to an accident

Page 14: Electrical Cost Estimate Abridged

LIGHTING GLOSSARY

CU (Coefficient of Utilization )General Area

HFC Horizontal Footcandle Quantity of light (measured in footcandles) on a horizontal surface.Luminous Efficacy (LE)

LDD (Luminaire Dirt Depreciation)LLD (Lamp Lumen Depreciation)

Lens Light Distribution

Light Source

LPD (Lighting Power Density)

RCR (Room Cavity Ratio)

Recommended Light Level

Reflectance The ratio of light reflected from a surface to the light falling on the surface.

Size The size of a lens covering a luminaire opening – typically applied to downlights.Source

Task Area

TEF (Total Efficiency Factor )

Weighted Average Footcandles

Weighted Average LPD

The ratio of lumens from a luminaire (fixture) received on the workplane to the lumens emitted by the luminaire’s lamps alone.The percentage of the area of an individual space type that is considered to be general and illuminated with general lighting.

The total lumens emitted by a light source divided by the total lamp power input, expressed as lumens per watt.An adjustment factor that accounts for the fractional loss of task illuminance due to luminaire dirt accumulation.An adjustment factor that accounts for the fractional loss of lamp lumens at rated operating conditions that progressively occurs during lamp operation.

A glass or plastic element used in luminaires (fixtures) to change the direction and control the distribution of light rays.The way in which light is emitted from a luminaire (fixture); often classified as direct, semi-direct, diffuse, semi-indirect or indirect.

The lighting technology that is applicable to the specific luminaire. Typically: compact fluorescent - CF, fluorescent - FL, incandescent - INC, metal halide - MH, miniature reflector incandescent - MR, parabolic incandescent - PAR, tungsten halogen - TH.

LLF (Light Loss Factor) The fractional remainder of task illuminance due to all combined lumen depreciations including LDD, LLD, and RSDD.A measure of electrical power used to provide lighting to a space - expressed in watts per square foot (or watts per square meter).

A number relating the dimensions of an enclosed space ( length, width, height) that effects the overall coefficient of Utilization of a luminaire within that specific space. The actual values used in the calculations were: 1 for RCR A, 5 for RCR B, and 7 for RCR C

The horizontal light level (expressed in footcandles) that is considered appropriate for the space or area. These values are generally taken from published IESNA data where applicable.

RSDD (Room Surface Dirt Depreciation)

An adjustment factor that accounts for the fractional loss of task illumination due to dirt on room surfaces.

A reference to the source of the building space-by-space description and square footage data (typically sets of building plans) from which building space square footage takeoffs are completed.

The percentage of the area of an individual space type that is considered to be for specific tasks and illuminated with task lighting.

A total efficiency factor used in calculating space type LPDs that includes initial Lamp Efficacy, Light Loss Factor (LLF), and Coefficient of Utilization (CU) and is expressed in lumens per watt.

The footcandle level considered to be typical over an entire space that accounts for both general and task footcandle levels and the space to which each is applied.

The allowable LPD value for a building type (i.e. office, fire station, library). This value is an average of the whole building LPD values for multiple buildings of this type. This value can be "weighted" in favor of one or more of these individual buildings if that building exhibits unique characteristics within its general type and there is data to support its actual share of new construction. Currently all buildings within a building type are given equal weight.

Page 15: Electrical Cost Estimate Abridged

http://lpd.ies.org/cgi-bin/lpd/ShowSpaceTypes.pl

Space Description Typically Associated Building

41 Active storage NA (typical all bldgs) 0.7622 Atrium - first three floors NA (typical all bldgs) 0.631.02 Audience/Seating Area Auditorium 1.763.11 Audience/Seating Area Court House 0.853.12 Audience/Seating Area Police/Fire Stations 0.8591 Audience/Seating Area Performing Arts Theatre 2.5992 Audience/Seating Area Motion Picture Theatre 1.16115.02 Audience/Seating Area Gymnasium 0.4115.03 Audience/Seating Area Exercise Center 0.3118 Card File & Cataloguing Library 1.073.1 Classroom/Lecture/Training NA (typical all bldgs) 1.4331 Conference Meeting/Multipurpose NA (typical all bldgs) 1.2557 Confinement Cells Penitentiary 0.932 Corridor/Transition NA (typical all bldgs) 0.465.1 Corridor/Transition Manufacturing Facility 0.48137 Court Sports Area Sports Arena 2.336 Dining Area NA (typical all bldgs) 0.867.03 Dining Area Lounge/Leisure Dining 1.424.01 Dressing/Locker/Fitting Room Exercise Center 0.58102 Dressing/Locker/Fitting Room Auditorium 1.134 Electrical/Mechanical NA (typical all bldgs) 1.4560 Emergency Hospital/Healthcare 2.664.1 Equipment Room Manufacturing Facility 1.1559 Exam/Treatment Hospital/Healthcare 1.52126.01 Excercise Area Gymnasium 0.9177 Exhibit space Convention Center 1.3356 Fire Station Engine room Police/Fire Station 0.758 Food Preparation NA (typical all bldgs) 1.2490 Garage Service/Repair Automotive Facility 0.7435.2 General High Bay Manufacturing Facility 1.6735.1 General Low Bay Manufacturing Facility 1.1578 Hotel/Conference Center - Conference/Meeting WHOLE BULDING ANALYSIS ONLY 2.0340 Inactive storage NA (typical all bldgs) 0.3115 Laboratory Office 1.3882 Laundry-Washing Hospital/Healthcare 0.654 Living quarters Dormitory 1.0920.1 Lobby NA (typical all bldgs) 1.3293.2 Lobby Auditorium 1.0543 Medium/Bulky Material Warehouse 0.9325 Office - enclosed NA (typical all bldgs) 1.1327 Office - open plan NA (typical all bldgs) 1.0613 Parking Area - Pedestrian Parking Garage 0.2118 Playing Area Gymnasium 1.3519 Reading Area Library 1.1712 Restrooms NA (typical all bldgs) 0.8634 Sorting Area Post Office 1.2217 Stacks Library 1.7111 Stairway NA (typical all bldgs) 0.5735 Workshop Workshop 1.91

90.1-2004 Model #

90.1-2004 Model

LPD

Page 16: Electrical Cost Estimate Abridged

http://lpd.ies.org/cgi-bin/lpd/CategoryList.pl

0.911.221.42

1.61.021.120.99

Emergency 2.661.23

Laboratory 1.381.291.261.231.11

1Parking Area 0.2

0.271.57

11.11.2

10.821.39

Fluorescent FLInandescent INCCompact Fluorescent CFMetal Halide MH

Building Area Type Category Average LPD (W/ft2)

Automotive RepairConvention CenterDining-Caf‚/Fast FoodDining-FamilyDormitoryGymnasiumHealthcare-Clinic

Healthcare-Hospital

LibraryManufacturingMotion Picture TheatreMuseumOffice

Parking GaragePerforming Arts TheaterPolice/Fire StationPost OfficeSchool/UniversityTransportationWarehouseWorkshop