Page 1: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©2009

Electric Vehicles and the Power Grid

American Association of State Highway and Transportation Officials

October 29, 2010Biloxi, MS

Sean McNamaraManager, Member RelationsPJM Interconnection

www.pjm.com

Page 2: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20092

PJM’s Responsibilities

• Ensures the reliability of the high-voltage electric power system

• Coordinates and directs the operation of the region’s transmission grid

• Administers a competitive wholesale electricity market

• Plans regional transmission expansion improvements to maintain grid reliability and relieve congestion.

www.pjm.com

Page 3: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20093

Air Traffic Controllers for the Transmission Grid….Operators of for Energy

Markets…

Match Generation to Load

Page 4: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20094

PJM as Part of the Eastern InterconnectionKEY STATISTICSPJM member companies 650+millions of people served 51peak load in megawatts 144,644MWs of generating capacity 164,905 miles of transmission lines 56,250GWh of annual energy 729,000generation sources 1,310square miles of territory 164,260area served 13 states + DCInternal/external tie lines 250

26% of generation inEastern Interconnection

23% of load inEastern Interconnection

19% of transmission assetsin Eastern Interconnection

19% of U.S. GDP produced in PJM

6,038 substations

www.pjm.com

Page 5: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20095

PJM’s Role in the Smarter (Robust) Grid

Generation

Transmission & Sub-transmissionDistribution

Customer

Smart Metering, Demand Response, PHEV, Energy Conservation and Distributed Resources

Substation AutomationSCADA and PhasorMeasurements

The Smart Grid is realized by merging data from these areas of automation to achieve a total end-to-end systems view by integrating information technology and operational technology.

Energy Storage

ISO/RTO

Two-Way Communication and Control

Page 6: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20096

Smarter Grid Network – Smart Home

GridSignal

• Smart ApplianceEnergy Management

• Smart Charger (PHEV)Storage

• Ancillary Services Signals• Price Signals• Generation Mix• Reliability Control• Load Curtailment

Aggregator

Page 7: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20097

• Enable greater penetration of PHEVs through coordination with state SMART Grid and retail tariff innovation initiatives

• Develop infrastructure to support non-traditional demand based regulation resources

• Develop operational tools and forecasting techniques to enable PHEV deployment

• Develop Vehicle to grid / Plug-in hybrid electric vehicles (PHEVs) protocol

• Participate in Mid-Atlantic Grid Interactive Cars Consortium (MAGICC) – electric companies, research institutes, and vehicle manufacturers

• Test storage batteries in regulation markets

Integrate SMART Grid with PHEVs

Page 8: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20098

Vehicle Economic ChargingAssumptions• 1,000,000 PEV Vehicles by 2015•~18% of U. S. Population is within the PJM territory• ~ 180,000 PEV Vehicles in the PJM Territory• ~ 33** Miles traveled per vehicle per day• ~ Average vehicle fuel usage: 22** mpg• ~ No tax compensation

Daily cost per PEV VehicleGasoline: 33 miles/day * $3.00 /gal // 22 miles/gal = $4.50Electric: 33 miles/day * $.07 / kWh // 4 miles/kWh = $0.60

Annual cost/savingsCost: Gasoline: 365 days * $4.50 /day = $1650Electric: 365 days * $0.60 /day = $220Savings:~ $1400 annually per vehicle180,000 vehicles (within PJM) = ~ $250,000,000 annual** U.S. Bureau of

Transportation Statistics

Page 9: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©20099

0

20,000

40,000

60,000

80,000

100,000

120,000

12:00

AM

2:00 A

M4:0

0 AM

6:00 A

M8:0

0 AM

10:00

AM

12:00

PM

2:00 P

M4:0

0 PM

6:00 P

M8:0

0 PM

10:00

PM

12:00

AM

Load

MW

PJM LoadAugust 26, 2009

PJM Load, MW

PJM Load and Wind Resources – August 26, 2009

Page 10: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200910

0

100

200

300

400

500

600

700

800

0

20,000

40,000

60,000

80,000

100,000

120,000

12:00

AM

2:00 A

M4:0

0 AM

6:00 A

M8:0

0 AM

10:00

AM

12:00

PM

2:00 P

M4:0

0 PM

6:00 P

M8:0

0 PM

10:00

PM

12:00

AM

Wind MW

Load

MW

PJM Load and Wind ContributionAugust 26, 2009

PJM Load, MWPJM Total Wind, MW

PJM Load and Wind Resources – August 26, 2009

Page 11: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200911

0

100

200

300

400

500

600

700

800

0

20,000

40,000

60,000

80,000

100,000

120,000

12:00

AM

2:00 A

M4:0

0 AM

6:00 A

M8:0

0 AM

10:00

AM

12:00

PM

2:00 P

M4:0

0 PM

6:00 P

M8:0

0 PM

10:00

PM

12:00

AM

Wind MW

Load

MW

PJM Load and Wind ContributionAugust 26, 2009

PJM Load, MWPJM Total Wind, MW

-$10.00

$0.00

$10.00

$20.00

$30.00

$40.00

1:00 A

M3:0

0 AM

5:00 A

M7:0

0 AM

9:00 A

M11

:00 A

M1:0

0 PM

3:00 P

M5:0

0 PM

7:00 P

M9:0

0 PM

11:00

PM

Loca

tiona

l mar

gina

l Pric

e-$/M

Wh

Chicago LMPAugust 26,2009

PJM Load and Wind Resources – August 26, 2009

Page 12: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200912

40,888 MW

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Cum

ulat

ive N

amep

late M

W

Cumulative* In planning 1/15/2010

Wind Generation in PJM - Operational and Proposed

www.pjm.com

Page 13: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200913

Load (MW x 1000)

Hour of Day7 9 11 13 15 17 19 21 23

120110

100

90

Vehicle Charging Impact on PJM

1 3 5

8060

2040

Capacity for 25+ million PEVs

Charging Energy180,000 PEV Vehicles * 33 miles // 4 miles/ kWh = ~ 1500 MWh

~ 500 additional MW over 3 valley hours

Page 14: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200914

Load in GW

Hour of Day1 3 5 7 9 11 13 15 17 19 21 23

120110

100

908060

2040

Regulation

Grid Benefits – Frequency Regulation

Page 15: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200915

Fast Regulation: Speed Matters…

A fossil power plant following a regulation command signal

Energy Storage (batteries / flywheels) accurately following a regulation command signal

Energy Storage OutputRegulation Signal

Page 16: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200916

Vehicles with Vehicle-2-Grid Participating in the Regulation Market

Vehicles• ~18% of U. S. Population is within the PJM territory• 180,000 PEV Vehicles in the PJM Territory

V2G Equipped PEVs within PJM• Assume 10% of Vehicles have V2G capability• Bi-Directional Power (with inverter) – 15 kW• 18,000 vehicles * 15 kW = 270 Mw

Availability for Participating in Regulation• Plugged In 12 hours each day (6 pm–6 am)

365 days * 12 hours = 4380 hours/year

Payment for participation in the PJM Regulation Market• PJM average historic price paid for regulation = $35/MWh• PJM Regulation price during valley load periods = $28/MWh• Per Vehicle: 4380 hrs * $28 * .015 MW = $1800 annually• PJM Overall: 4380 hrs * 270 MW * $28 = ~$33,000,000 annually

Page 17: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200917

• Smart Meter allows car to roam

• Mid-Atlantic Grid Interactive Car Consortium (MAGICC)

• Over one year experience

MAGICC – PJM’s PHEV Demonstration Project

www.pjm.com

Page 18: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200918

AES Grid-Scale Energy Storage System

www.pjm.com

Operational Details• Altairnano, Inc – Lithium Ion nano titanate battery

• Energy: 300 kWh• Efficiency: 90% round trip

• Power: 1 MW for 15 minutes • Usable Charge Range: 5% - 99%

Page 20: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200920

The Ohio State UniversitySmart@CAR Current Research Activities

www.pjm.com

• Modeling of PHEVs and interactions with the grid• PHEV Energy Management• PHEV-Grid Connectivity Issues• PHEV Fleet Studies

Page 21: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials

PJM©200921

PHEV- Win, Win, Win, Win

4. Recharge Off Peak/ Higher Use of Power Industry Assets

www.pjm.com

1. Reduce Oil Imports/Energy Independence

2. Reduced Cost of Fuel and Cash Back

3. Reinvent Auto Industry

Page 22: Electric Vehicles and the Power Grid American Association ... · PJM©2009 Electric Vehicles and the Power Grid American Association of State Highway and Transportation Officials