electical infrastructure of rpvv(maths project)

29
RAJKIYA PRATIBHA VIKAS VIDYALAY A Guide Teacher MS. Sushma Singh

Upload: rajpal-singh

Post on 23-Jun-2015

66 views

Category:

Business


2 download

TRANSCRIPT

Page 1: Electical infrastructure of rpvv(maths project)

RAJKIYA PRATIBHA VIKAS VIDYALAYA

Guide Teacher MS. Sushma Singh

Page 2: Electical infrastructure of rpvv(maths project)

MATHS GROUP PROJECT

IX-B2012-2013

ELECTRICAL INFRASTRUCTURE

Submitted by: Harshit Ajay

Page 3: Electical infrastructure of rpvv(maths project)

GROUP MEMBERSAJAY ANISH ANUPAMBIR SINGHHARSHIT HEMANTKUNALLALITMAYANKPARVEENSAURABHUTTKARSH

Page 4: Electical infrastructure of rpvv(maths project)

WORK REPORTFIELD WORK WRITING

ANISHBIR SINGH HARSHIT HEMANT KUNAL LALITMAYANKPARVEEN SAURABHUTTKARSH

AJAYANUPAMUTTKARSHMAYANKHARSHIT

Page 5: Electical infrastructure of rpvv(maths project)

SUMMARYIn the project we collect the

information of all electric equipment like tube lights, fans, bulbs, switches ,board etc. that all are available in school .then we find the cost of each equipment and we total the balance . By this we can find out expenditure on the equipment . Through is that we can find out the expenditure .these types are used in the big school and equation for the electric equipment .

Page 6: Electical infrastructure of rpvv(maths project)

WORK REPORTPRESENTATION DECORATIONAJAY ANUPAMMAYANKHEMANTHARSHITUTTKARRSH

AJAY ANUPAM UTTKARSHANISHHEMANT

Page 7: Electical infrastructure of rpvv(maths project)

ADVANTAGES OF PROJECTIn this project we told about the electrical

infrastructure of our school. This is a group project and have a unity and coordination in our group members. All members do hard work and have trust on each other. The objective of such report is to explore students mathematical knowledge with accurate information which helps in correlation of data. We share our knowledge with team members and increase our mathematical skills and experience during this project.

Page 8: Electical infrastructure of rpvv(maths project)

IMPORTANCE OF GROUP PROJECT

Analysis

Develop mental ability

Increasing knowledge

Develop coordina

tion

Increasing

efficiency

Page 9: Electical infrastructure of rpvv(maths project)

GROUND FLOOR

Page 10: Electical infrastructure of rpvv(maths project)

HALL

TOILET

CONFERENCE ROOM

EXAMINATION ROOM

KITCHEN

MATHS LAB

OFFICE

PRINCIPLE ROM

VICE PRINCIPLE ROOM

LANGUAGE ROOM

CAL LABSOCIAL SCIENCE LAB

GAMES ROOM

EXIT POIN

TCHEMISTRY LAB

TOILET GYM

ELECTRICI

TYROO

M

STAIR

WATER POINT

MEDICAL ROOM

STAIR

EXITBASKET BALL CORT

Page 11: Electical infrastructure of rpvv(maths project)

FANS

93COST69750 Rupee

s

SWITCHES

222COST3300

Rupees

TUBE• 16• COS

T 1440 Rupees

CUPBOARD

• 8• CO

ST 1200

• Rupees

EXHAUST• 6• COS

T 2100

• Rupees

T.V• 4• COS

T 40000Rupees

WIRING• 150

m• COS

T450

• Rupees

Page 12: Electical infrastructure of rpvv(maths project)

SOCKETS• 22• COST

880• Rupees

SPEAKERS• 23• COST

6900

• Rupees

BULBS• 12• COS

T 120

• Rupees

CAMERAS• 4• COST

4000• Rupees

SINGLE MCB• 80• COST

4800• Rupees

DOUBLE MCB• 20• COST

3200• Rupees

Page 13: Electical infrastructure of rpvv(maths project)
Page 14: Electical infrastructure of rpvv(maths project)

1 FLOOR

Page 15: Electical infrastructure of rpvv(maths project)

JUNIOR SCIENCE LAB101

XII C103

XII A102

GIRLS TOILET

A.V ROOM

115STAIRS

LIBRARY104

BALL BHAWAN

105

EXAMINATION ROOM

106

XII D 107

XI D108

PHYSICS LAB109

XII B110BIO LAB

111

BOYS TOILET

XI B112

STAIRS

CAREER ROOM

114STAIR

Page 16: Electical infrastructure of rpvv(maths project)

SOCKET•23•COST 920Rupees

SPEAKERS•16•COST 4800Rupees

BULBS 7COST 70Rupees

FANS•68•COST 51000Rupees

TUBELIGHT•103•COST 5790Rupees

SWITCH•2715•COST 181Rupees

Page 17: Electical infrastructure of rpvv(maths project)

BELLS•Frequency 1•Cost 1500 Rupees

TUBES•Frequency 16•Cost 1440Rupees

CUPBOARD•Frequency 5•Cost 50Rupees

CAMERA•Frequency 4•Cost 4000Rupees

SINGLE MCB•Frequency 40•Cost 2400Rupees

DOUBLE MCB•Frequency 6•Cost 960Rupees

EXHAUXT•Frequency 6•Cost 2100RupeesT.V•Frequency 2•Cost 20000RupeesWIRE•Frequency 170 m•Cost 310Rupees

SOCKET•Frequency 23•Cost 920Rupees

SPEAKERS•Frequency 16•Cost 4800Rupees

BULBSFrequency 7Cost 70Rupees

Page 18: Electical infrastructure of rpvv(maths project)

Cost of first floor TOTAL ELECTRICAL

APPILIANCES

97,115 Rupees

Page 19: Electical infrastructure of rpvv(maths project)

Second floor

Page 20: Electical infrastructure of rpvv(maths project)

MUSIC ROOM201

MATHS LAB202

XI A 203

XI C 204

STAFF

ROOM

205

X A206

X B207

X C208

IX A209

IX B210

BOYS TOILET

STAIRS

VIII A212

IX C211

GIRLS TTOILET

S. ROOM213

ECO CLUB ROOM 214

STAIRSCORRIDOR

MATHS ROOM

STAIRS

Page 21: Electical infrastructure of rpvv(maths project)

CUPBOARD• 5• COST• 50• Rupee

s

FANS• 52• COST

39000• Rupee

s

TUBELIGHT• 34• COST

1700• Rupee

s

SOCKET• 5• COST

200• Rupee

s

SPEAKERS• 15• COST

4500• Rupee

s

BULBS• 7• COST

70• Rupee

s

Page 22: Electical infrastructure of rpvv(maths project)

CAMERA• 4• 4000Ru

pees

SINGLE MCB• 40• 2400Ru

pees

DOUBLE MCB• 6• 960Rup

ees

BELLS• 1• 1500Ru

pees

TUBES• 16• 1440Ru

pees

CUPBOARDS• 5• 50Rupe

es

Page 23: Electical infrastructure of rpvv(maths project)

Cost of second floor TOTAL ELECTRICAL

APPILIANCES

63,790 Rupees

Page 24: Electical infrastructure of rpvv(maths project)

THIRD FLOOR

Page 25: Electical infrastructure of rpvv(maths project)

FANS• 41• 750

Rupees

TUBELIGHTS• 33• 1650

Rupees

SWITCH• 26• 390

Rupees

SOCKET• 11• 440

Rupees

SPEAKER• 16• 4800

Rupees

BULBS• 8• 80

Rupees

CAMERA• 3• 3000

Rupees

Page 26: Electical infrastructure of rpvv(maths project)

BELLS• 2• 3000

Rupees

CUBOARD• 10• 100

Rupees

MICROWAVE• 1• 6000

Rupees

ELECTRIC KETTLE• 2• 3000

Rupees

SINGLE MCB• 40• 2400

Rupees

DOUBLE MCB• 16• 2560

Rupees

Page 27: Electical infrastructure of rpvv(maths project)

Cost of second floor

TOTAL ELECTRICAL APPILIANCES

57,250 Rupees

Page 28: Electical infrastructure of rpvv(maths project)

TOTAL COST 1 .LAMPS 37,0002. GROUND FLOOR 1,55,790 3. FIRST FLOOR 97,115

4. SECOND FLOOR 63,7905 .THIRD FLOOR 57,250

TOTAL 4,10,945

Page 29: Electical infrastructure of rpvv(maths project)

END