elec2017 3.2 c. yukselen - shift performance boards and leadership development
TRANSCRIPT
Do you have any information about defect rates?
As I said, I have no information
yesterday’s problem, but in general die
temperature can effect the defect rates.Do you have any data about die temperatures?
Do you know who do not have enough
experience about temperature settings?
I don’t have any data about die
temperatures, we don’t measure it.
OK, I will ask 2nd Shift supervisor…
Why are yesterday’s defect rates over our target?
I don’t know anything about yesterday’s
defect rates
Origin of Shift Performance Boards
Production
Supervisor
(1st Shift)
Leader
How long do you have this problem?
I have never seen this problem before,
probably somebody misses some
details about temperature settings.
All of my team are well-experienced. I
guess, somebody on previous shift…
People often create their escape route by using unknowns and grey areas
Do you have any information about defect rates?
I have no idea, but may be machine die
positioning settings…Do you have any data about die positionings?
Do you probably have a mistake or positioning
problem on your shift?
I don’t have any data about positionings.
????? Pofff
Why are yesterday’s defect rates over our target?
I don’t have any information about
yesterday’s defect rates
Origin of Shift Performance Boards
Production
Supervisor
(2nd Shift)
Leader
How long do you have this problem?
I didn’t see this problem before, probably
somebody working on 1st shift had a
mistake about positionings.
All of my team work very well. Do you
imply me my shift is responsible for these
defects? I trust my team!
Organization Chart
Action Plan Implementation and Control
Steering Comittee
Work Group Leaders (WGL)
Production Groups
WGL-1 WGL-2 WGL-3 WGL-4 WGL-5
Prod.
Mgr.
Prd
Eng.
Prd
Eng.
Prd
Eng.
Prd
Eng.
Shift Supervisors
Operational DirectorG
uid
ing
Co
ac
hin
g
Escalation & Evaluation
Imp
rove
me
nt
& L
ea
din
g
Info
rma
tion
& R
ep
ortin
g
Kaiz
en
Activ
ities
Ac
tio
n P
lan
s
Suggestions from
Employee & WGLs
MTC
Mgr.R&D
Mgr.
PD
Mgr.
Quality
Mgr.
Support for
Gemba Activities
Escalation
&
Evaluation
WG Leader WG Member
General Manager (Lean Transformation Leader)
Support for
Gemba Activities
Support for
Gemba ActivitiesSupport for
Gemba Activities
Shift Performance Board System
SPBShift Performance
Board
Supervisor
Notebook
T-Card
Audit
43
SPB Meeeting
P 1 4
Daily
Manager Meeeting
3 1 5
Daily
Director Meeeting
1 5
WeeklyProduction
Outputs
Work Group Leader
Shift Supervisor
Engineers (P, Q, PD, PC, MTC)
Manager (P, Q, PD, PC, MTC)
Operational Director
Production Group Leader
P
DC
A
P
DC
A
P
DC
A
Improved
Metrics
Shift Performance Board System
SPBShift Performance
Board
Supervisor’s
Notebook
T-Card
Audit
43
SPB Meeeting
P 1 4
Manager Meeeting
1 1 5
Director Meeeting
1 5
Daily
Daily
Weekly
Work Group Leader (WGL)
Shift Supervisor
Engineers (P, Q, PD, PC, MTC)
Manager (P, Q, PD, PC, MTC)
Operational Director
Production Group Leader
P
DC
A
P
DC
A
P
DC
A
Production
OutputsImproved
Metrics
Shift Performance Board System
SPBShift Performance
Board
Supervisor
Notebook
T-Card
Audit
43
SPB Meeeting
P 1 4
Manager Meeeting
5 1 1
Director Meeeting
1 5
Daily
Daily
WeeklyProduction
Outputs
Work Group Leader
Shift Supervisor
Engineers (P, Q, PD, PC, MTC)
Manager (P, Q, PD, PC, MTC)
Operational Director
Production Group Leader
P
DC
A
P
DC
A
P
DC
A
Improved
Metrics
Absenteeism
Safety
Tasks
before
Production
Machine
and Product
Check
Production
Plan
Accuracy
Shift
Discipline
5S
Shift Quality
Problems
Material
Shortage
Standardized
Shift
Management
Notebook
Company Name
Page-1
Quality Problems
Notifications
Machine Losses
Notifications
Defect Notifications
Notes
Page-2
Notification
Page
PLANNED WORK ORDER LIST
(PILLAR BASED)
*Machine Code
*Employee Name
*Product Name
*Product Code
*Die Code
*Effectiveness Rate
*Planned Production
*Completed Numbers
*Capacity Forecast
INNACURACY ON PLAN
(PILLAR BASED)
*Machine Code
*Employee Name
*Product Name
*Product Code
*Die Code
*Effectiveness Rate
*Planned Production
*Completed Numbers
*Capacity Forecast
Work Orders’
Accuracy
Company Name
T-Card
T-KART DENETİM SORULARI1
Operasyon talimatları sahada bulunuyor mu? Talimata uygun çalışılıyor mu?
2 Çalışma koşullarına uygun çalışılıyor mu? (SÇK)
3Ürün Kontrol planı var mı?Uygun çalışılıyor mu?
4Proses kontrol raporları dolduruluyor mu? İlk ürün onayı veriliyor mu?
5Makine ve hatlarda bulunan Otonom Bakım geçici standartla-rına (Kontrol listesi) uygun kontrol yapılıyor mu? Günlük makine kontrol ve bakım kartları güncel mi?
6 Ölçüm aletleri, mastar ve şablonların kalibrasyon tarihleri uygun mu?
7 Elektrik panolarının önünde yalıtkan paspas var mı?
8 Dolap iç-dış tanımları var mı? Düzenli mi?
9 Hava, yağ ve su kaçakları var mı?
10 Makinaların bakım etiketleri var mı? Tarihler uygun mu?
11 Çevre etki envanteri sahada var mı? Güncel mi?
12Makine ve Ekipman butonları (düğme-tuş) sağlam ve etiketler ile tanımlı mı?
13Makine ve Ekipmanların göstergelerdeki çalışma aralıkları belirlenmiş mi? Gösterge aralıklarına uygun çalışılıyor mu?
14 Yer/Malzeme/Ekipman vs. tanımları var mı?
15 Talimatlara uygun iş güvenliği ekipmanları kullanılıyor mu?
16TPM panosu güncel mi?(5S, İş kazası, T kart ve OB aksiyon takibi, OEE )
17 Varsa kanal (Rögar) içleri temiz mi?
18 Temizlik malzemelerinin yerleri tanımlanmış mı?
19 Polivalans tablosu güncel mi?
20Acil durum ekip listesi güncel mi? Sorumlular görevlerini biliyor mu?
21 Karantina / 5S sarı ve kırmızı alanlarının listeleri güncel mi?
Question T-Cards
Action T-Cards
T-Card Audit and Audit Area
16
PRES BL.
KONF. BÖLÜM Ü
KOLİ ZI M BALAM A
ALANIFİTİL
BÖLÜM Ü
ÜRETİÜRET İM
ODASI
KONTR
OL
PANELİ
ÜRETİÜRETİM M ÜDÜRLÜĞÜ
FİTİL BL. TPM SORUM LULUK BÖLGELERİ
FİTİL BANT.
ODASI
FİTİLBL.KARANTİNA
ALANI
M D-01 ÜRET İM HATTI
KO
NV
EY
ÖR
BA
NT
ÜRETİÜRET İM M ALZEM ELERİ STOK ALANI
SOĞ.
TANK.
M D-03 ÜRET İM HATTI
TB-02 ÜRETİM HATTI
HAM UR STOK ALANI
ÜRETİÜRETİM
EKİPM ANLARI BÖLÜM Ü
SİLİKON
ALANI
İİ DA
Rİ K
ISIM
M D-04 ÜRETİM HATTI
STO
K
BLE
NDE
M D-05 ÜRETİM HATTI
M D-08 ÜRETİM HATTI
SOĞ.
TANK.TUZLAR
KONF BL.
YARI M AM ÜL STOK
ALANI
TB-03 ÜRETİM HATTI
YAZI
M AK.
ODASI
TUZ
KAR.
ODASI
TB-04 ÜRETİM HATTI
M D-09 ÜRETİM HATTI
PRES BL.KONFEKSİYON BL.
PRES BL.
GYT. BANT
OTOMOTİVÜRÜNLERİ
ARASTOK
ALANI
KONFEKSİYONBL.KESİM
APARATLARI
ALANI
D.GAZ.
TERAZİ
TERAZİ
TERAZİ
4
PRES BL.
Cross Check T-Card Audits
17
Work Group Leaders (WGL) Calendar Weeks
Work
Gro
up
Responsib
ility
ADI SOYADI
TAKVİM HAFTALARI
OCAK ŞUBAT MART NİSAN MAYIS HAZİRAN TEMMUZ AĞUSTOS EYLÜL EKİM KASIM ARALIK
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
OSMAN SELVİ (F1) F2 F3 F4 F2 F3 F4 F2 F3 F4 F2 F3 F4 F2 F3 F4 F2 F3 F4
AHMET KAÇAR (F2) F3 F4 F1 F3 F4 F1 F3 F4 F1 F3 F4 F1 F3 F4 F1 F3 F4 F1
KERİM BOBUŞOĞLU (F3) F4 F1 F2 F4 F1 F2 F4 F1 F2 F4 F1 F2 F4 F1 F2 F4 F1 F2
SÜLEYMAN AKMER (F4) F1 F2 F3 F1 F2 F3 F1 F2 F3 F1 F2 F3 F1 F2 F3 F1 F2 F3
Shift Performance Board System
SPBShift Performance
Board
Supervisor
Notebook
T-Card
Audit
43
SPB Meeeting
P 1 4
Manager Meeeting
5 1 1
Director Meeeting
1 5
Daily
Daily
WeeklyProduction
Outputs
Work Group Leader
Shift Supervisor
Engineers (P, Q, PD, PC, MTC)
Manager (P, Q, PD, PC, MTC)
Operational Director
Production Group Leader
P
DC
A
P
DC
A
P
DC
A
Improved
Metrics
1 2 3 4 5
9876 10
11 12 13 14 15
16-17-18-19 20
(1-10)
Shift Performance Metrics
(P,C,D,S,M,E)
(11,12)
Autonomous Maintenance Metrics
(13)
T-Card Audit Plans
(14, 15)
OEE and F-Tag
(16-19)
Action Plans
(20)
Safety Cards
General Information (1)
(2-12)
Shift Performance Metrics
(P,C,D,S,M,E)
(13,14)
5S Area Audits and Audit Calendar
(15, 19-20)
OEE and F-Tag
(16-18)
Action Plans
MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN MİN. MAX. PUAN
0 64,99 0 0,70 100,00 0 6,00 100,00 0 4 100 0 11,10 100,00 0 0 49 0 0 39 0 0 10 0 25 100 0 0,0 65,0 0
65 74,99 4 0,50 0,69 2 4,40 5,99 4 3 3,99 4 10,10 11,00 2 50 65 4 40 54 2 11 15 2 20 24 2 65,1 75,0 2
75 84,99 8 0,30 0,49 3 3,40 4,39 8 2 2,99 8 9,10 10,00 3 66 75 8 55 70 5 16 20 5 15 19 3 75,1 85,0 3
85 94,99 12 0,10 0,29 4 2,40 3,39 12 1 1,99 12 8,10 9,00 4 76 85 12 71 85 7 21 25 7 10 14 4 85,1 95,0 4
95 100,00 15 0,00 0,09 5 0,00 2,39 15 0 0,99 15 0,00 8,00 5 86 100 15 86 100 10 26 100 10 0 9 5 95,1 100,0 5
AYLIK 5S (PUAN) AYLIK İSİG (PUAN)ASILAN HATA KARTI
SAYISI (Adet)
ERP BİLDİRİM HATASI
(Adet)PLANA UYUM (%)
FİTİL BL. AYLIK USTA PERFORMANS KRITERLERİ
AYLIK PERF.
(OEE Çarpanı)2. İŞÇİLİK ORANI (%)
AYLIK TOPLAM FİRE
ORANI (%)
DIŞ MÜŞTERİ
ŞİKAYETİ + SON
KONTROL (ADET)
AYLIK DEVAMSIZLIK
(%)
Shift
Points
Weekly
Points
Performance% Rework % Scrap %Customer
Complaints %Absenteeism 5S Audit% Safety Audit%
F-Tag
Notification
ERP Notf.
MistakePlan Accuracy
VALUE POINT
15 83,25 8
5 0,45 3
15 2,94 12
15 1 12
5 2,52 5
15 69 8
10 79 7
10 17 5
5 5 5
5 92 4
100 69
PERFORMANCE CRITERIA
PERFORMANCE %
REWORK %
DEFECT %
EXTERNAL CUSTOMER COMPLAINTS
ABSENTEEISM
5S AUDIT POINT
SAFETY AUDIT POINT
NUMBER OF F-TAGs
ERP NOTIFICATION FAILURE
PRODUCTION PLAN ACCURACY
TOTAL:
% JUNE
2017
Monthly
Points
MONTHLY PERFORMANCE POINTS
VALUE POINT
15 83,25 8
5 0,45 3
15 2,94 12
15 1 12
5 2,52 5
15 69 8
10 79 7
10 17 5
5 5 5
5 92 4
100 69
PERFORMANCE CRITERIA
PERFORMANCE %
REWORK %
DEFECT %
EXTERNAL CUSTOMER COMPLAINTS
ABSENTEEISM
5S AUDIT POINT
SAFETY AUDIT POINT
NUMBER OF F-TAGs
ERP NOTIFICATION FAILURE
PRODUCTION PLAN ACCURACY
TOTAL:
% JUNE
2017
BSC (Balanced Score Card) Integration
TARGET ORIENTED PERFORMANCE POINT
-Division Manager
-Production Eng.
-Group Leader
-Supervisor
POLIVALANCE AND TARGET ORIENTED PERFORMANCE POINT
Frontline EmployeesÇALIŞAN PERSONEL 1 2 3 4 5 6 7 8 9 10
DIVISION
MANAGER
PRODUCTION
ENGINEER
PRODUCTION
GROUP LEADER
SHIFT
SUPERVISOR
PERFORMANCE METRICS
Shift Performance Board System
SPBShift Performance
Board
Supervisor
Notebook
T-Card
Audit
43
SPB Meeeting
P 1 4
Manager Meeeting
5 1 1
Director Meeeting
1 5
Daily
Daily
WeeklyProduction
Outputs
Work Group Leader
Shift Supervisor
Engineers (P, Q, PD, PC, MTC)
Manager (P, Q, PD, PC, MTC)
Operational Director
Production Group Leader
P
DC
A
P
DC
A
P
DC
A
Improved
Metrics
Visual Management Example
30
General Situation of Shift
(Total Shift Point)
Detail Metrics of Shift (i.e: OEE)
effecting 15% total shift point
1st Shift: 2nd Shift: Question: What are the reasons of yellow mark of
2nd Shift?
• Determine True & KEY Metrics
• Involve Frontline Workers
• Establish an Escalation System
• Create a Daily Meeting Habit
• Coach People for Change Management
• Make connection between countermeasures and metrics
• Show leverage effect of coaching
• Remove Uncertainty
32
• Transform Shift Management Boards into Daily Meeting Boards
• Improve T-Card Audit topics and questions
• Create Value Stream WGL and Managers
And Near Future…
Can Yü[email protected]
yalindanisman.com
@yalindanisman
facebook/yalinenstitu
@yalinenstitu
Yalın Enstitü Türkiye
Lean Institute Turkey
And Questions???
Faaliyetler sonrası puanlar ve hediyeler puan
tablosu esas alınarak verilir.
FAALİYET PUAN KİMBireysel Öneri Verme 10 TÜM MAVİ YAKA PERSONEL
Önce-Sonra Kaizen Hazırlamak 30 EKİPTEKİ KİŞİ SAYISINA GÖRE PAYLAŞTIRILIR.
10 Adım Kaizen Ekibinde Yer Almak 20 EKİP ÜYELERİ
10 Adım Kaizen Ekibinde Lider Olmak 80 (20+60) EKİP LİDERİ
Üst Yönetime 10 Adım Kaizen Sunumu Yapmak 70 KAİZEN EKİP ÜYELERİ
Dönem Kaizen’i Seçilmesi* 300 EKİPTEKİ KİŞİ SAYISINA GÖRE PAYLAŞTIRILIR.
Yılın Kaizen’i Seçilmesi 500 EKİPTEKİ KİŞİ SAYISINA GÖRE PAYLAŞTIRILIR.
Dış Sunuma Seçilen Kaizen 200 EKİPTEKİ KİŞİ SAYISINA GÖRE PAYLAŞTIRILIR.
Hata Kartı Asma (Beyaz) 7 KART ASAN
Hata Kartı Asma (Kırmızı) 3 KART ASAN
Hata Kartı Kaldırma (Beyaz) 7 KART ASAN
Hata Kartı Kaldırma (Kırmızı) 3 KART ASAN
Tek Nokta Dersi Vermek 50 EĞİTİM VEREN
5S Altın Bayrak (Hedef ve Üzeri) 30 İLGİLİ OB/5S BÖLGESİNDE ÇALIŞANLAR
5S Gümüş Bayrak (Hedefin 1-3 puan altındaki bölgeler)
20 İLGİLİ OB/5S BÖLGESİNDE ÇALIŞANLAR.
5S Bronz Bayrak (Hedefin 4-10 puan altındaki bölgeler)
10 İLGİLİ OB/5S BÖLGESİNDE ÇALIŞANLAR.
Otonom Bakım Adım Atlama (Makinada) 200 İLGİLİ MAKİNADA ÇALIŞANLAR
Ramak Kala Kartı Asmak / İSG Risk Bildirimi 5 KART ASAN
Ramak Kala Kartı Onaylanması / İSG Risk Bildirimi 25 KART ASAN
* ÖDK Puan ve Faaliyet kriterlerinde değişiklik yapma hakkını gizli tutar,Kampanyalar düzenleyerek istediği dönemlerde puan skalası ve ödül kriterleri ile ilgili değişiklik yapma hakkına sahiptir.