GET MORE WITH SCORE PROJECT OVERVIEW * Metrolink, as the California Environmental Quality Act (CEQA) lead agency for the project has determined that the project satisfies the criteria for a statutory exemption (SE) under Public Resources Code (PRC) § 21080(b)(10) for “Specified Mass Transit Projects”. The El Monte Project is exempt because it would increase commuter and passenger service on an existing rail line. EL MONTE SIDING EXTENSION Segment 1: removes existing pedestrian at-grade crossing and moves the platform access closer to Tyler Avenue and includes: Adding safety-related improvements (new Metrolink standard pedestrian crossing with delineators, active warning devices, pedestrian gates, emergency swing gates, and channelizing railing) Safety-related improvements at Tyler Avenue at-grade crossing Extending the siding track east up to the Peck Road bridge Widening the Ramona Boulevard bridge undercrossing Segment 2: widens the Peck Road bridge undercrossing and extends the siding track east up to the I-10 freeway overcrossing

Upload: others

Post on 21-Jul-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EL MONTE SIDING EXTENSION - metrolinktrains.com

GET MORE WITH SCORE

PROJECT OVERVIEW

* Metrolink, as the California Environmental Quality Act (CEQA) lead agency for the project has determined that the project satisfies the criteria for a statutory exemption (SE) under Public Resources Code (PRC) § 21080(b)(10) for “Specified Mass Transit Projects”. The El Monte Project is exempt because it would increase commuter and passenger service on an existing rail line.

EL MONTE SIDING EXTENSION

• Segment 1: removes existing pedestrian at-grade crossing and moves the platform access closer to Tyler Avenue and includes:

Adding safety-related improvements (new Metrolink standard pedestrian crossing with delineators, active warning devices, pedestrian gates, emergency swing gates, and channelizing railing)

Safety-related improvements at Tyler Avenue at-grade crossing

Extending the siding track east up to the Peck Road bridge

Widening the Ramona Boulevard bridge undercrossing

• Segment 2: widens the Peck Road bridge undercrossing and extends the siding track east up to the I-10 freeway overcrossing

Page 2: EL MONTE SIDING EXTENSION - metrolinktrains.com

GET MORE WITH SCORE

EL MONTE SIDING EXTENSION

PROJECT TIMELINE

Environmental

Public Involvement

Construction

20242023

20222021

2020

SPRING

SUMM

ER

FALL

WIN

TER

SPRING

SUMM

ER

FALL

WIN

TER

SPRING

SUMM

ER

FALL

WIN

TER

SPRING

SUMM

ER

FALL

WIN

TER

SPRING

SUMM

ER

FALL

WIN

TER

SPRING

SUMM

ER

FALL

WIN

TER

2025

Regulatory Permits

Design

Page 3: EL MONTE SIDING EXTENSION - metrolinktrains.com

GET MORE WITH SCORE

PROJECT MAP

EL MONTE SIDING EXTENSION

Page 4: EL MONTE SIDING EXTENSION - metrolinktrains.com

GET MORE WITH SCORE

PROJECT BENEFITS

More service: when combined with other SCORE projects, this Project will enable more frequent service. In the future, passengers can expect train service every 30 minutes in each direction.

Improved service reliability: trains will no longer have to wait for one another to pass, improving on-time performance.

The new platform access with an upgraded, protected crossing willcreate a more convenient and safer walkway for pedestrians.

EL MONTE SIDING EXTENSION

Enhanced safety: improved at-grade crossings will facilitate Quiet Zone ready corridors that will also minimize train horn blowing.