eilpi-091267_ rev b-bts site survey checklist-indoor-shared sites

10
Prepared By : GR/EIL/PP/IEO: Anuj Kataria 1 (6) SHARING SITE CHECKLIST (for adding 1 BTS, 4,4,4) SITE ID: ADDRESS: DATE: SURVEY DONE BY: CUSTOMER: S.No Item Availability Required Qty Remarks Yes/No usable/not usable 1 Site Status Site - GBT/RT Type of Building (If GBT not required) (Private/Commercial) Type of Equipment Room (Shelter/Room) Height of building and No. of Floors (if GBT not required) No of Operators 2 Tower/Pole status Type-GBT/RTT/Pole Angular/Tubular Length of One section of tower Total Number of Sections Height of Tower/Pole Tower foundation height Free Mount/Poles available or not If Yes then free Mounts/Pole for GSM along with the heights(Mark in Sketch also) 1. 2. 3. Others(if any) Free Mounts/Pole for MW Antennas along with the height(Mark in sketch also) 1. 2. Others(if any) No. & Type of Existing GSM/CDMA antennas EIL/PI-09:1267 Rev B Dated 11/02/2009

Upload: vi9nit

Post on 24-Nov-2014

111 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 1 (6)

SHARING SITE CHECKLIST (for adding 1 BTS, 4,4,4)

SITE ID: ADDRESS: DATE: SURVEY DONE BY: CUSTOMER: S.No Item Availability Require

d QtyRemarks

Yes/No usable/not usable

1 Site StatusSite - GBT/RTType of Building (If GBT not required)(Private/Commercial)Type of Equipment Room (Shelter/Room)Height of building and No. of Floors (if GBT not required)No of Operators

2 Tower/Pole status

Type-GBT/RTT/PoleAngular/TubularLength of One section of towerTotal Number of SectionsHeight of Tower/PoleTower foundation heightFree Mount/Poles available or not

If Yes then free Mounts/Pole for GSM along with the heights(Mark in Sketch also)

1.2.3.

Others(if any)Free Mounts/Pole for MW Antennas along with the height(Mark in sketch also) 1.

2. Others(if any)

No. & Type of Existing GSM/CDMA antennas

CELL A

CELL B

CELL C

Other (if any)Existing GSM/CDMA Antenna Ht. & Orientation

CELL A

CELL B

CELL C

EIL/PI-09:1267 Rev B Dated 11/02/2009

Page 2: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 2 (6)

Other (if any)

Existing M/W antenna Ht. & Orientation

Cell A

Cell B

Cell C

Others(if any)Proposed M/W Antenna Ht.& SizeSpace for 0.6m Microwave antenna, min 2 Nos.Proposed GSM antenna height as per RND (Cell A: Cell B: Cell C)Proposed GSM antenna orientation as per RND (Cell A: Cell B: Cell C)Space availability on tower for GSM antennas as per RND (Yes/No)

If No, Maximum height possible for proposed Antenna [See, space on tower without any obstruction (existing \antennas and equipments on tower)]

CELL A

CELL B

CELL C

Other (if any)Availability of free poles/mounts at required Ht.

CELL A CELL BCELL C

Other (if any)Length of Feeder required from Tower to Proposed BTS (Through Outdoor Ladder)

3 Outdoor Cable Ladder (horizontal)Availability & Space on ladder on Tower (for 06 feeders –150mm)Availability & Space on ladder from Tower to shelter/room (for 06 feeders –150mm)If no space than please specify length of required ladder (in mtrs)Approx. Quantity required-Feeder/run

Cell-ACell-BCell-C

Other (if any)

EIL/PI-09:1267 Rev B Dated 11/02/2009

Page 3: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 3 (6)

4 Cable Entry (Roxtec)Space for 06 feeder+04 MW cables in existing entry (look for free holes)If No, then space for new cable entry (Mark on sketch) Indoor/outdoor ladder required as per new entry if yes than please specify length

5 Shelter/Room detailsDimensions (L) x (W) x (H)-Indoor dimensions onlyFlooring type (Antistatic/Non-antistatic)Shelter/Room location and conditionSpace for one RBS(600mmx500mm)Space for Krone Block for PCM termination (Near existing Krone Block)Space for One DF(Wall Mount) (320X50)Space for One DCDB(Wall Mount) (350x150)Space in existing TX rack (6U min)(1U = 44.45mm)If not then space available for New TX Rack (600x400x2100)

6Shift/removal of existing Eqpts. If required than give details

7 Indoor LadderAvailability & space on Indoor Ladder (for 06 feeders)Indoor Ladder length (if required) for cable routing for Ericsson Eqpts.Ht of existing Indoor ladder

8 Air Conditioner working or Not (Y/N)

9 Earthing StatusFree holes in Earth Collector Bar inside Shelter (IGB), min. 1 Nos.Free holes in Earth Collector Bar outside Shelter (EGB), min. 1 Nos.

10 Power Plant DetailsPower Plant Make & rating (module capacity & Nos.)No. of installed rectifiers & ratingNo’s of Slots free for additional RectifiersSpare Distribution MCB’s nos.& rating available in PPAvailability of 1 Nos. 63A MCBs in existing Power Plant for Ericsson BTSAvailability of min.1 No. free space for MCB or free MCB of any rating in existing PP (Y/N)No. of Spare Slots available for MCB’s. Existing load current(Amp) on Power

EIL/PI-09:1267 Rev B Dated 11/02/2009

Page 4: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 4 (6)

Plant11 Battery Bank Details

Existing Battery make & capacity(AH)No of Battery banks

12 Cabling distance (approximate)Between P.P. & proposed RBSBetween P.P. & proposed DCDB Between proposed DCDB & proposed RBS

13 DG at site or not (Y/N)14 Photographs

Tower O/D ladderCable lead-in from outsideShelterCable lead-in from insideI/D cable ladderAll RBSsP.P. photo (door open)TX rack photoLocation of DF

Remarks:

If any doubt, please Contact:

Power BTS Site Engineering1. Vishal - 9717197515 1. Ashwani Garg - 9930805157

2. Sanjay Ghosal- 9958795748 2. Anuj Kataria - 9910995754

EIL/PI-09:1267 Rev B Dated 11/02/2009

Page 5: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 5 (6)

ROOF TOP/GREEN FIELD LAYOUT – (INCL. EXISTING

INFRASTRUCTURE)

EIL/PI-09:1267 Rev B Dated 11/02/2009

Page 6: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 6 (6)

ANTENNA SYSTEM LAYOUT.

EIL/PI-09:1267 Rev B Dated 11/02/2009

Page 7: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 7 (6)

EQUIPMENT ROOM/EXISTING EQUIPMENT ROOM LAYOUT

EIL/PI-09:1267 Rev B Dated 11/02/2009

Page 8: EILPI-091267_ Rev B-BTS Site Survey Checklist-Indoor-Shared Sites

Prepared By : GR/EIL/PP/IEO: Anuj Kataria 8 (6)

EIL/PI-09:1267 Rev B Dated 11/02/2009