eight deadly defects in systems engineering and how to fix them
DESCRIPTION
Any organization desirous to adopt or improve systems engineering needs to be aware that research into the nature of systems engineering has identified a number of defects in the current systems engineering paradigm. This paper discusses eight of these defects and ways to fix or compensate for them.TRANSCRIPT
![Page 1: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/1.jpg)
Eight deadly defects insystems engineering and
how to fix themDr Joseph Kasser
Leverhulme Visiting ProfessorCranfield University
![Page 2: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/2.jpg)
Agenda1. Selection of independent alternative solutions2. The V Model3. Lack of a standard process for planning a project4. The Waterfall model5. Unanswered and unasked questions6. Lack of a metric for the goodness of Requirements7. Focus on technological solutions not solving
customer’s problems8. The need to focus on people as well as process• Summary• Questions and discussion
![Page 3: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/3.jpg)
3
The selection ofindependent alternative
solutions• The systems engineering process has
identified three alternative candidatesolutions (A, B and C)
• “C” gets the highest score• Which one is the optimal?• Possibly none of them• Possibly a combination of the best parts of
all of them
![Page 4: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/4.jpg)
The “V” Model
![Page 5: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/5.jpg)
5
Defects in the VModel
• Lacks ‘prevention of defects’• Definition of successful test?• Design works from requirements• T&E work from the need• T&E identify defects and plan to find them
after they have been built into the system• Why not prevent the defects?
* Kasser 1995
![Page 6: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/6.jpg)
6
The Project Cycle
DesignRequirement
Test
Acceptancecriteria
(property of a requirement)
![Page 7: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/7.jpg)
7
Prevention of defectiverequirements
• Requirements Workshopat UMUC and UniSA
• FRED and Tiger Pro• Figure of Merit for
document• Produced attitude
change in student’sperceptions
• Produced betterrequirements
![Page 8: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/8.jpg)
8
Lack of a standard processfor planning a project
Determination of objectives Determination of Resources
Generate preliminary work plan (risks)
Draft work plan version 1
![Page 9: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/9.jpg)
9
Lack of a standard processfor planning a project
Determination of objectives Determination of Resources
Identify and study lessons learned from previous projects
Negotiate objectives and resources
Generate preliminary work plan (risks)
Draft work plan version 1
![Page 10: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/10.jpg)
10
The Waterfall model• Waterfall approach does not cope well with
changing requirements.• Change the production process from the
waterfall approach to some type of rapid, spiral,or other methodology– Iterative waterfalls– Spiral focuses on Risk Management
• Result– Some improvement
• comparing Chaos 1995 with Chaos 2004
![Page 11: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/11.jpg)
11
Contract award
Vision of product
Intermediate milestones(product reviews)
Waterfall
Desired
Assumption behindWaterfall model
![Page 12: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/12.jpg)
12
Contract award
Vision of product
Intermediate milestones(product reviews)
Waterfall
Desired(moving target)
Real world ofchanges
![Page 13: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/13.jpg)
13
Contract award
Visions of product (converge)
Intermediate milestones(product reviews)Configuration Control(Stage Gates)
Cataracts
Desired (keep youreye on the balls)
Assumptions behindCataract model
![Page 14: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/14.jpg)
14
Unanswered andunasked questions
• Unanswered questions– Can you tell if the project is in trouble?– What percentage of the project is complete?
• Unasked questions at SRR– Are requirements with the following properties
really needed?• High cost, high risk• Low priority, high cost• Low priority, high risk
– Is this projected risk profile industry standard?
![Page 15: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/15.jpg)
15
Project Priority profiles(object-orientedrequirements)
Why are weinvesting inthis system?
![Page 16: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/16.jpg)
16
Project Risk profiles(object-orientedrequirements)
Risk: Is thisreasonable?
![Page 17: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/17.jpg)
17
Most successful IS ofthe 20th century?
• RAF Battle of BritainCommand, Control, &Communications System– No computers– Germany had better
Radar Technology– RAF evolved and used
an integrated system– Adequate technology
• System?• System of Systems?• Complex System?• Network enabled system?
![Page 18: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/18.jpg)
18
Not solvingcustomer's problems
• “the systems engineer is primarily interested in making equipmentchanges” [Goode and Machol, 1959] page 130).
• The problem the executive had was to secure at alltimes, live and accurate data concerning the exactconditions of the business. [Farnham, 1920] page 20)
• [Beer, 1972] page 244) describes a conceptual system.– British War Room in the Battle of Britain– NASA’s control room at the Manned Space Flight Center in Houston,
Texas.– bits and pieces of it existed at that time.
• Beer proposed a control centre• Today’s technology allows for personal desktop portals accessing
information via software agents in an integrated digital or networkcentric environment.
![Page 19: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/19.jpg)
19
Complex orcomplicated?
![Page 20: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/20.jpg)
20
The need to focus onpeople as well as process
• Literature– Is full of advice as to
how to make projectssucceed
– Has little if anything tosay about theproliferating processstandards
![Page 21: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/21.jpg)
21
The need to focus onpeople as well as process
• Systems engineering is a way of life– (Hitchins 1998)– Integration of
• Schedules• Design, Testing and Integration• Systems of Systems divide?
• Are we focusing on the right things?– The Standards do not provide metrics that can
predict the failure of a project.• (K&W, 1998)
![Page 22: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/22.jpg)
Summary Selection of independent alternative solutions The V Model Lack of a standard process for planning a
project The Waterfall model Unanswered and unasked questions Lack of a metric for the goodness of
Requirements Focus on technological solutions not solving
customer’s problems The need to focus on people as well as
process
![Page 23: Eight deadly defects in systems engineering and how to fix them](https://reader034.vdocuments.mx/reader034/viewer/2022052523/555a8b8ad8b42a991b8b456d/html5/thumbnails/23.jpg)