EIA in Pakistan EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation of Pakistan It started with the promulgation of Pakistan Environmental Protection Ordinance (PEPO) of 1983 Environmental Protection Ordinance (PEPO) of 1983 (repealed in 1997). (repealed in 1997). EIA became mandatory for all new projects, since 1st EIA became mandatory for all new projects, since 1st July 1994 Documentation July 1994 Documentation Documentation of sectoral guidelines as EIA Package is Documentation of sectoral guidelines as EIA Package is effective from 1997. effective from 1997. Enactment of Pakistan Environmental Protection Act, 1997 Enactment of Pakistan Environmental Protection Act, 1997 (Appendix-I) followed by IEE/EIA Regulations of 2000 (Appendix-I) followed by IEE/EIA Regulations of 2000 Finally, the National Environmental Policy in 2005, Finally, the National Environmental Policy in 2005, which describes integration of environment into which describes integration of environment into development planning through implementation of EIA at development planning through implementation of EIA at project level and promotion of strategic environmental project level and promotion of strategic environmental assessment (SEA) as a tool for integrating environment assessment (SEA) as a tool for integrating environment into decision-making process. into decision-making process. The Planning and Development Division at the federal The Planning and Development Division at the federal level and its corresponding provincial departments have level and its corresponding provincial departments have established Environment Sections or Cells for established Environment Sections or Cells for environmental screening of the proposals. environmental screening of the proposals.

Upload: mariah-fletcher

Post on 03-Jan-2016

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

EIA in Pakistan EIA in Pakistan Brief background and History of the National EIA system.Brief background and History of the National EIA system.

• It started with the promulgation of Pakistan Environmental It started with the promulgation of Pakistan Environmental Protection Ordinance (PEPO) of 1983 (repealed in 1997).Protection Ordinance (PEPO) of 1983 (repealed in 1997).

• EIA became mandatory for all new projects, since 1st July EIA became mandatory for all new projects, since 1st July 1994 Documentation1994 Documentation

• Documentation of sectoral guidelines as EIA Package is Documentation of sectoral guidelines as EIA Package is effective from 1997.effective from 1997.

• Enactment of Pakistan Environmental Protection Act, 1997 Enactment of Pakistan Environmental Protection Act, 1997 (Appendix-I) followed by IEE/EIA Regulations of 2000(Appendix-I) followed by IEE/EIA Regulations of 2000

• Finally, the National Environmental Policy in 2005, which Finally, the National Environmental Policy in 2005, which describes integration of environment into development describes integration of environment into development planning through implementation of EIA at project level and planning through implementation of EIA at project level and promotion of strategic environmental assessment (SEA) as a promotion of strategic environmental assessment (SEA) as a tool for integrating environment into decision-making tool for integrating environment into decision-making process.process.

• The Planning and Development Division at the federal level The Planning and Development Division at the federal level and its corresponding provincial departments have and its corresponding provincial departments have established Environment Sections or Cells for environmental established Environment Sections or Cells for environmental screening of the proposals.screening of the proposals.

Page 2: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation
Page 3: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

EIA Process EIA Process The Executive Committee The Executive Committee

of National Economic of National Economic Commission (ECNEC) has Commission (ECNEC) has decided that in case of decided that in case of development projects development projects having environmental having environmental implication, an implication, an environmental impact environmental impact assessment (EIA) report assessment (EIA) report should be submitted along should be submitted along with the project document with the project document at the time of getting at the time of getting approval.(EPA, Pakistan approval.(EPA, Pakistan 2005)2005)

Page 4: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

EIA PACKAGE: EIA PACKAGE: The Pakistan Environment Protection Agency in The Pakistan Environment Protection Agency in collaboration with other key stakeholders prepared an “EIA collaboration with other key stakeholders prepared an “EIA Package” Which includes: General Guidelines & Sectoral Package” Which includes: General Guidelines & Sectoral Guidelines.Guidelines.• GENERAL GUIDELINESGENERAL GUIDELINES• Policy and procedures for making EIA’s, review and approval of environmental Policy and procedures for making EIA’s, review and approval of environmental

assessments.assessments.• Guidelines for the preparation and review of environmental ReportsGuidelines for the preparation and review of environmental Reports• Guidelines for public consultationGuidelines for public consultation

• • Guidelines for sensitive and critical areasGuidelines for sensitive and critical areas • • Pakistan environmental legislation and NEQS.Pakistan environmental legislation and NEQS. SECTORIAL GUIDELINESSECTORIAL GUIDELINES • • Major thermal power stations Major thermal power stations • • Major chemical and manufacturing plantsMajor chemical and manufacturing plants • • Municipal waste disposalMunicipal waste disposal • • New township developmentNew township development • • Oil and gas exploration and productionOil and gas exploration and production • • Major roadsMajor roads • • Water supply projectsWater supply projects • • Sewerage schemesSewerage schemes • • Industrial estatesIndustrial estates • • Format of the IEE/EIA as Prescribed in EIA Package is called EPA Regulations 2000Format of the IEE/EIA as Prescribed in EIA Package is called EPA Regulations 2000

Page 5: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Presentation of Report Presentation of Report Executive summary Executive summary Provide an executive summary where the Provide an executive summary where the

IEE is more than 30 pages long.IEE is more than 30 pages long.

Introduction: Introduction: This section should include the following:This section should include the following:

• • Purpose of the report, including identification of the project Purpose of the report, including identification of the project and the Exponents. and the Exponents.

• • A brief description of the nature, size, and location of the A brief description of the nature, size, and location of the project, and other pertinent background information.project, and other pertinent background information.

• • Extent of the IEE study, scope of the study, magnitude of Extent of the IEE study, scope of the study, magnitude of effort, persons performing the study.effort, persons performing the study.

Description of projectDescription of project

Provision of sufficient details to give a brief but clear picture of Provision of sufficient details to give a brief but clear picture of the following (include only applicable items):the following (include only applicable items):

• • Type and category of project.Type and category of project.

• • Objectives of project.Objectives of project.

• • Alternatives considered, and reasons for their rejection.Alternatives considered, and reasons for their rejection.

••

Page 6: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Location (use maps and photographs showing general Location (use maps and photographs showing general location, specific location, and project site layout. Include land location, specific location, and project site layout. Include land uses on the site and surroundings, details of population uses on the site and surroundings, details of population centers and nearby dwellings, road access, topographic andcenters and nearby dwellings, road access, topographic and

vegetation features of the site, and other sensitive land uses vegetation features of the site, and other sensitive land uses such as national parks, wild life reserves or archaeological such as national parks, wild life reserves or archaeological sites.)sites.)

• • Size or magnitude of the operation, including capital cost, and Size or magnitude of the operation, including capital cost, and associated activities.associated activities.

• • Proposed schedule for implementation.Proposed schedule for implementation.

• • Description of the project, including drawings showing project Description of the project, including drawings showing project layout, components of the project, etc. This information layout, components of the project, etc. This information should be of the same extent as is included in feasibility should be of the same extent as is included in feasibility reports, in order to give a clear picture of the project, its reports, in order to give a clear picture of the project, its context and its operations. context and its operations.

• • Government approvals and leases required by the project.Government approvals and leases required by the project.

Page 7: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Description of environment (in area affected by project)Description of environment (in area affected by project) Physical resources: Physical resources: topography, soils, climate, surface water, topography, soils, climate, surface water,

groundwater, geology /seismology.groundwater, geology /seismology. Ecological resources: Ecological resources: fisheries, aquatic biology, wildlife, forests, fisheries, aquatic biology, wildlife, forests,

rare or endangered species.rare or endangered species. Human and economic development:Human and economic development: Population and communities—numbers, locations (summarize information in map Population and communities—numbers, locations (summarize information in map

form), composition, employment.form), composition, employment. • • Industries, including known major development proposalsIndustries, including known major development proposals • • Infrastructure—including water supply, sewerage, flood control/drainage, etc.Infrastructure—including water supply, sewerage, flood control/drainage, etc. • • InstitutionsInstitutions • • Transportation—roads, rail, harbors, airports, navigable riversTransportation—roads, rail, harbors, airports, navigable rivers • • Land use planning—including dedicated use areasLand use planning—including dedicated use areas • • Power sources and transmission;Power sources and transmission; • • Agricultural and mineral developmentAgricultural and mineral development Quality of life values.Quality of life values.

Socioeconomic valuesSocioeconomic values • • Public healthPublic health • • Recreational resources and developmentRecreational resources and development • • Aesthetic valuesAesthetic values • • Archaeological or historic treasuresArchaeological or historic treasures • • Cultural valuesCultural values

Page 8: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Screening of potential environmental impactsScreening of potential environmental impactsand mitigation measuresand mitigation measures

Mitigation measures, where appropriate, should also be Mitigation measures, where appropriate, should also be recommended:recommended:

• • Environmental problems due to project location;Environmental problems due to project location;

• • Environmental problems related to design;Environmental problems related to design;

• • Environmental problems associated with the construction Environmental problems associated with the construction stage;stage;

• • Environmental problems resulting from project operations;Environmental problems resulting from project operations;

• • Potential environmental enhancement measures; andPotential environmental enhancement measures; and

• • Additional considerations.Additional considerations.

Page 9: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Environmental monitoring program andEnvironmental monitoring program andinstitutional requirementinstitutional requirement

This section of the report must describe the management This section of the report must describe the management plan and monitoring surveillance programs, including plan and monitoring surveillance programs, including periodic progress reports to be established and continued periodic progress reports to be established and continued by the proponent following granting of Environmental by the proponent following granting of Environmental Approval.Approval.

The Responsible Authority must be assured that all The Responsible Authority must be assured that all necessary environmental protection measures are carried necessary environmental protection measures are carried out in future as planned. The program must be out in future as planned. The program must be accompanied by the details of the institutional capacity of accompanied by the details of the institutional capacity of the proponent, including staff training and equipment, the proponent, including staff training and equipment, which will be provided to ensure implementation and which will be provided to ensure implementation and operations.operations.

Page 10: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Scoping Scoping Scoping is a vital early step, which identifies the issues that Scoping is a vital early step, which identifies the issues that

are likely to be important during the environmental are likely to be important during the environmental assessment, and eliminates those that are not. assessment, and eliminates those that are not.

Scoping can be used to:Scoping can be used to:• • Consider reasonable and practical alternatives.Consider reasonable and practical alternatives.

• • Inform potentially affected people of the proposal and alternatives.Inform potentially affected people of the proposal and alternatives.

• • Identify the possible effects on the environment of the proposal and alternatives.Identify the possible effects on the environment of the proposal and alternatives.

• • Understand the values held by individuals and groups about the quality of the Understand the values held by individuals and groups about the quality of the environment that might be affected by the proposal and the alternatives.environment that might be affected by the proposal and the alternatives.

• • Evaluate the possible environmental effects and concerns expressed to determine Evaluate the possible environmental effects and concerns expressed to determine whether, and how, to investigate them further.whether, and how, to investigate them further.

• • Define the boundaries of any required further assessment in time, space and subject Define the boundaries of any required further assessment in time, space and subject matter.matter.

• • Determine the analytical methods and consultation procedures needed in any furtherDetermine the analytical methods and consultation procedures needed in any further

assessment.assessment.

• • Organize, focus and communicate the potential impacts and concerns, to assist further Organize, focus and communicate the potential impacts and concerns, to assist further analysis and decision-making.analysis and decision-making.

• • Establish the Terms of Reference to be used as the basis of the ongoing assessmentEstablish the Terms of Reference to be used as the basis of the ongoing assessment..

Page 11: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

A typical list of steps for scoping is:A typical list of steps for scoping is:• • Prepare an outline of the scope, with headings such as:Prepare an outline of the scope, with headings such as:

• • Objectives and description of the proposal Objectives and description of the proposal

• • The context and setting of the proposalThe context and setting of the proposal

• • ConstraintsConstraints

• • AlternativesAlternatives

• • IssuesIssues

• • Public involvement (in scope), andPublic involvement (in scope), and

• • TimetableTimetable Further develop the outline of the scope through discussion with key Further develop the outline of the scope through discussion with key

stakeholders, assembling available information, and identifying information stakeholders, assembling available information, and identifying information gaps.gaps.

Make the outline and supporting information available to those whose views are Make the outline and supporting information available to those whose views are to be obtained.to be obtained.

Identify the issues of concern (cross-reference with checklists in Sectoral Identify the issues of concern (cross-reference with checklists in Sectoral Guidelines).Guidelines).

Evaluate the concerns from both a technical and subjective perspective, Evaluate the concerns from both a technical and subjective perspective, seeking to assign a priority to important issues.seeking to assign a priority to important issues.

Amend the outline to incorporate the agreed suggestions.Amend the outline to incorporate the agreed suggestions. Develop a strategy for addressing and resolving each key issue, including Develop a strategy for addressing and resolving each key issue, including

information requirements and terms of reference for further studies.information requirements and terms of reference for further studies. Provide feedback on the way the comments have been incorporated.Provide feedback on the way the comments have been incorporated.

Page 12: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Major Environmental ChallengesMajor Environmental Challenges Protecting human and environmental health from Protecting human and environmental health from

contamination of environmentcontamination of environment Conservation of biodiversity,Conservation of biodiversity, Safeguarding the productivity of natural resourcesSafeguarding the productivity of natural resources Level of awareness and understanding.Level of awareness and understanding. Quality of EIA Review.Quality of EIA Review. Public consultation: Public consultation: One of the major drawbacks in the EIA One of the major drawbacks in the EIA

package is that it does not have guidelines for public package is that it does not have guidelines for public consultationsconsultations

Jurisdiction of responsibilityJurisdiction of responsibility Implementation problems: Implementation problems:

• Baseline dataBaseline data• ProceduresProcedures• Capacity to implementCapacity to implement• Institutional MechanismsInstitutional Mechanisms• Consultancy ServicesConsultancy Services• Post Monitoring & Analysis of EIA.Post Monitoring & Analysis of EIA.

Page 13: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation

Recommendations Recommendations Planned new legal EIA developments.Planned new legal EIA developments. Development of baseline dataDevelopment of baseline data Capacity to implementCapacity to implement Effective ImplementationEffective Implementation ComplianceCompliance Institutional MechanismsInstitutional Mechanisms Consultancy ServicesConsultancy Services Human Resource and CapacityHuman Resource and Capacity EIA Training and Capacity Building ProgramsEIA Training and Capacity Building Programs Public AwarenessPublic Awareness Effective Monitoring and ManagementEffective Monitoring and Management Environmental Monitoring CommitteesEnvironmental Monitoring Committees Environmental auditingEnvironmental auditing

Page 14: EIA in Pakistan Brief background and History of the National EIA system. Brief background and History of the National EIA system. It started with the promulgation