![Page 1: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/1.jpg)
E i t l ClEnvironmental CleanupLower Hackensack RiverP bli M ti M 22 2012Public Meeting: May 22, 2012
![Page 2: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/2.jpg)
Honeywell.com
AgendaAgenda
• Introductions• Chromium in the Hackensack River • Sediment Remediation Plan• Dredging & Cappingg g pp g• Performance Verification• Permits• Truck Transportation Route• Truck Transportation Route• Project Schedule
Honeywell Proprietary2
![Page 3: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/3.jpg)
Honeywell.com
Mutual Chemical Company 1905 to 1954Mutual Chemical Company 1905 to 1954
• Honeywell acquired Mutual Chemical in late 1954Chemical in late 1954
• Jersey City location was closed in mid 1954
• Honeywell never t d i J Cit
Honeywell Proprietary3
operated in Jersey City
![Page 4: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/4.jpg)
Honeywell.com
Source of Chromium in the Lower Hackensack RiverSource of Chromium in the Lower Hackensack River
S il ClMutual Chemical Operated 1905 1954
Cleanup ProgressSoil Cleanup• All of SA-7 excavated
and transported to licensed landfillPipeline Discharge
• Operated 1905 – 1954• Hexavalent Chromium
• Job completed in 2009
Groundwater CleanupG d t t d
Study Area 7
Former Roosevelt Drive-In (SA-7)
• Ore Residue Pumped• Created New Land
• Groundwater prevented from discharging to the Hackensack River
• Captured groundwater
• 34 Acres• Land Sold in 1954• Drive-In Theater
is pumped to treatment plant
• Only treated water discharged, under
• Department Store
Honeywell Proprietary4
1947
g ,NJDEP permit, to the River
![Page 5: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/5.jpg)
Honeywell.com
Sediment Remedy in Lower Hackensack River
N i ifi tP j t d l d
Sediment Remedy in Lower Hackensack River
• No significant environmental impact
N h d
• Project developed in coordination with Riverkeeper
W k d d
Sediment Remedy Area
• Non-hazardous materials
• Odor controls
• Work done under supervision of U.S. District Court
O b • No impact on air quality
• Noise abatement
• Overseen by a Special Master
• Permits issued by US A C f Noise abatement
measuresUS Army Corps of Engineers & NJDEP
Honeywell Proprietary5
![Page 6: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/6.jpg)
Honeywell.com
Sediment Remediation PlanSediment Remediation Plan
Honeywell Proprietary6
![Page 7: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/7.jpg)
Honeywell.com
DredgingDredging
Dredge Components• Bulkhead improvements have been completed to enable dredging
• Dredge volume approximately 2,700 yards
• Dredge material non-hazardous – to be taken by barge to local processing facility
• Dredge area back-filled with cap to within six inches of original bottom
Honeywell Proprietary7
![Page 8: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/8.jpg)
Honeywell.com
Dredging OperationsDredging Operations
Debris Removal Mechanical Dredging
Honeywell Proprietary8
![Page 9: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/9.jpg)
Honeywell.com
Sediment ProcessingSediment Processing
• Barges transported to Clean Earth facility in Jersey City, NJ
• Dredged material stabilized using cement or another similar material
• Stabilized sediment transported to licensed landfill
Honeywell Proprietary9
![Page 10: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/10.jpg)
Honeywell.com
Hackensack River Capping ProcessHackensack River Capping Process
HackensackHackensack River
Kellogg Street
Sand & Stone Storage
Former Roosevelt
Truck Route
PumpHopper
SpreaderBarge
Former Roosevelt Drive-In (SA-7)
Honeywell Proprietary10
![Page 11: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/11.jpg)
Honeywell.com
Capping Operation
Typical Capping Sand Feed System
Capping Operation
Loading Sand Into Hopper Pumping Sand to Sand spreader
Spreading Sand Over Sediments
Honeywell Proprietary11
![Page 12: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/12.jpg)
Honeywell.com
Capping System Spreader BargeCapping System Spreader Barge
Honeywell Proprietary12
![Page 13: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/13.jpg)
Honeywell.com
Cap PlacementCap Placement
• Long–reach excavator to placeexcavator to place cap material in obstructed areas
Excavator on a float• Excavator on a float system
• Capping in near shore areas whereshore areas where sand spreader cannot reach even at high tideg
Honeywell Proprietary13
![Page 14: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/14.jpg)
Honeywell.com
Performance Verification ProcessPerformance Verification Process
Quality Control/Assurance• Real time monitoring• Real-time monitoring• Frequency higher during initial phase• Long term monitoring & repair if needed
Honeywell Proprietary14
Pan Sampling Core Sample
![Page 15: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/15.jpg)
Honeywell.com
Permits
• NJDEP Waterfront Development Permit
Permits
• State of New Jersey Tidelands Conveyance
• U.S. Army Corps Permit
• Soil Erosion and Sediment Control Plan
• Jersey City Construction Approval
Honeywell Proprietary15
![Page 16: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/16.jpg)
Sediment Remedy Truck Transportation RouteSediment Remedy Truck Transportation Route
SA-7
16
![Page 17: Ei tlClEnvironmental Cleanup Lower Hackensack River...P bli M ti M 22 2012Public Meeting: May 22, 2012 ... ÆHoneywell.com Mutual Chemical Company 1905 to 1954Mutual Chemical Company](https://reader033.vdocuments.mx/reader033/viewer/2022050314/5f7620cdaed6cb70d6188ccf/html5/thumbnails/17.jpg)
Honeywell.com
Project ScheduleProject Schedule
2010 2011 20121Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q
50% Design
Contractor Selection
Implementation Plan
100% Design
Permit Applications
A R iAgency Reviews
Mobilization
DredgingRiver Work Hours
Dredging
Capping
Verification CQA
Demobilization
• For most of River: 24 hours / day, six days a week
• For Droyers Point: 7:00 a.m. – 7:30 p.m., five days a week
Honeywell Proprietary17
Demobilization