McKenney’s replaced chilled water risers in high-rise towers without compromising cooling
system performance.
THE CHALLENGENew chilled water risers were required for large high-rise condominium towers. McKenney’s needed to install new piping without interrupt-ing existing building cooling system opera-tions. In addition, the team had to spread the
cost of the project over three years to match the budget of the building’s owner.
THE SOLUTIONThe McKenney’s team chose an alternate location to install the new chilled water risers in order to simplify the transition to the new cooling system in a cost-efficient, convenient manner for the homeowners. Two or three units were connected to the new risers at a time to accommodate the project’s unique
scheduling needs. Riser sections were pre-fabricated at McKenney’s campus facility to streamline installation. Once all units were connected, the old risers were capped, drained and abandoned.
THE RESULTSUsing a phased approach, the building owner’s unique budgetary and schedule requirements were met with minimal impact to homeowners during installation.
Efficiently Rising to the OccasionPROJECT NAME
� Plaza Towers Risers
PROJECT LOCATION
� Atlanta, Georgia
PROJECT TEAM
� Owner: Plaza Towers Condominium Association
� General Contractor: McKenney’s, Inc.
� Engineer: McKenney’s, Inc.
SPECIALIZATIONS
Design/Build
Plumbing Shop Prefab
MARKETS
� Mixed-use & Multifamily
The content of this document is not intended as an endorsement.
www.mckenneys.com© 2014 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316
704-357-1200 [email protected]
3601 Performance Road Charlotte, North Carolina 28214