Effective solutions for the safe and reliable delivery of large LNG Storage Tanks in the severe conditions of Northern Siberia
Patrick Genoud, Julien Castres Saint Martin, TOKYO, 05 APRIL 2017
![Page 2: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/2.jpg)
1. Context
[Movie]
1. Innovative Design
2. Construction in Arctic conditions
3. Conclusion
OVERVIEW
![Page 3: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/3.jpg)
We reject the idea that workplace
accidents are unavoidable.
Our management has a responsibility
to do its utmost to ensure the physical
integrity and the health of everyone
on our worksites and in the facilities
we operate.
We are committed to zero accident
objectives.
SAFETY : our SHARED VALUE towards zero accident
We strive for Zero accidents
Risk mitigation as early as design stages
Specific site trainings
Risk analysis of any taskSystematic prestart meeting
Management involvement
![Page 4: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/4.jpg)
1- Context
![Page 5: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/5.jpg)
MOVIE
The project best presented by those who build it
![Page 6: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/6.jpg)
Arctic conditions
Lelu Island
(BC)
Melkøya Island
(hammerfest)
Sabetta
(Russia)
Sabetta : 71° 15' 25" North 72° 5' 46" East
Most extreme arctic conditions ever
Kenai(Alaska)
![Page 7: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/7.jpg)
Useful previous experience
Hammerfest, NORWAY
Design, procurement and construction of :
- 2 full containment LNG tanks of 125,000m3capacity each. Post-tensioned Concreteouter containment and 9% Nickel steelinner tank.
- 1 full containment LPG tank of 45,000m3 capacity.
- 1 full containment condensate tank of 75,000m3 capacity.
Client : SNØHVIT Venture (Statoil, TOTAL, ENGIE, etc.)
Execution : 2002-2005
![Page 8: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/8.jpg)
Dec. 2012 Call for tender
May 2013 Letter of intention & contract award 6 months = very short
Summer 2013 Mobilization at Sabetta
Winter 2013-2014 Start foundation works
Summer 2014 Concrete slab and wall slipforming for tanks T1 & T2 crucial summer windows
Summer 2015 Concrete slab and wall slipforming for tanks T3 & T4
Oct. 2016 Erection of modules for externals on tanks T1 & T2 critical works in winter also
Summer 2017 Erection of modules for externals on tanks T3 & T4
Mid 2017 Ready for cool down (RFCD) for tanks T1 & T2
End 2017 Ready for cool down (RFCD) for tanks T3 & T4
On Yamal LNG, an extremely tense timeline for preparation and execution
![Page 9: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/9.jpg)
Scope of works
CLIENT JSC YAMAL LNG
Type of Contract Engineering, Procurement and Construction (EPC)
Type of LNG tank Above Ground, full containment
Number of tanks 4
Operating capacity 160,000m3 each
Inner tank 9% Nickel Steel
Outer tank Post-tensioned Concrete
Base slab type Elevated base slab
Foundation type Thermostabilized piledfoundation
![Page 10: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/10.jpg)
2- Innovative Design
![Page 11: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/11.jpg)
Pile design in Permafrost
948 steel/concrete 530mm dia. piles
948 pin bearings
Elevated slab
24m piles
![Page 12: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/12.jpg)
1- Imposing deformations to a stiff structure results in high stresses
Pile design in PermafrostThe main issues
Concrete slab
Controlled Sand fill
UnstablePermafrost
Thermal deformations
Limited free height in winter
High shear force
High bending moment
“Siberian Sock” filled with flexible material
Longer free height in winter
Reduced shear
Reduced moment
Thermal deformations
2- Thawing may jeopardize permafrost stability
Thermostabilization of the permafrost
![Page 13: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/13.jpg)
Pile design in PermafrostFast track implementation
Testing of flexible filling material under arctic conditions
“Sock” placing
Finished
![Page 14: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/14.jpg)
Steel piles installed & filled with concrete
Number & length of piles reduced vs FEED base case
Simplified bearings (low seismic hazard)
Steel Sock on top of pile heads with special bitumen-based filling material in
annular space
Thermo-stabilization system on each pile (for stabilization of permafrost)
Optimization of foundation design in Permafrost
![Page 15: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/15.jpg)
3- Construction in Arctic conditions
![Page 16: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/16.jpg)
Mobilization
![Page 17: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/17.jpg)
Maximization of external works during favorable weather window
Double shift (2 x 10 hours)
Rebars: cutting and bending in remote workshop / prefabrication on site
Slipforming (concrete wall)
Prefabrication of roof sectors
Assembly of roof sectors directly on top of the walls (full/concrete)
Modularization of external structures and piping
CONSTRUCTION CONSTRAINTS
![Page 18: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/18.jpg)
PILE INSTALLATION
![Page 19: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/19.jpg)
Piled foundations
![Page 20: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/20.jpg)
Piled foundations
![Page 21: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/21.jpg)
Slip-form for Wall concreting
![Page 22: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/22.jpg)
Roof Sectors Fabrication & Transportation
![Page 23: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/23.jpg)
Protection against harsh weather conditions
(for external works which cannot be performed within the favorable weather
window)
Mobile heated sheds (base slab concreting / roof sectors welding / external steel
tank plates welding)
Winterized batching plant / warehouse for concrete materials storage
Early supply of construction materials and equipment
Use of mobile cranes in lieu of tower cranes (severe blizzards)
CONSTRUCTION KEY ISSUES
![Page 24: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/24.jpg)
Roof sectors installationwith central mast
![Page 25: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/25.jpg)
Roof sectors installationwith central mast
![Page 26: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/26.jpg)
Steel Roof in place
![Page 27: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/27.jpg)
Concrete roof construction
![Page 28: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/28.jpg)
Installation of electrical heaters
Two heaters by tank have been installed at temporary doors location;
With this system, temperature inside the tanks has been maintained at 5°C during
winter time and permitted to avoid any welding problems and to have good
working conditions.
CONSTRUCTION KEY ISSUES
![Page 29: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/29.jpg)
Heaters inside the tank
![Page 30: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/30.jpg)
Vapour barrier (steel liner) installation
![Page 31: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/31.jpg)
Protected environment work (external envelope completion)
Hot air blowers
Automatic ultrasonic testing (AUT) for inner tank welds inspection → allows
welding on double shift basis.
Maximized use of automatic welding process (submerged arc welding- SAW and
Flux-cored arc welding - FCAW)
CONSTRUCTION KEY ISSUES
![Page 32: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/32.jpg)
Erection of Thermal corner protection (TCP)
![Page 33: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/33.jpg)
FABRICATION OF MODULES @ KALININGRAD
![Page 34: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/34.jpg)
TRANSPORTATION OF MODULES
![Page 35: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/35.jpg)
Installation of Modules on the Roof
![Page 36: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/36.jpg)
Installation of Modules on the Roof
![Page 37: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/37.jpg)
Installation of Modules (vertical pipe-rack)
![Page 38: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/38.jpg)
Installation of Modules (vertical pipe-rack)
![Page 39: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/39.jpg)
4- Conclusion
![Page 40: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/40.jpg)
Anticipation
Complementarity
Communication
Control
The Fundamentals of Success
![Page 41: Effective solutions for the safe and reliable delivery of ... Genoud... · - 2 full containment LNG tanks of 125,000m3 capacity each. Post-tensioned Concrete outer containment and](https://reader033.vdocuments.mx/reader033/viewer/2022051522/5a70e96d7f8b9ab6538c578e/html5/thumbnails/41.jpg)
Thank you for your attention !