Kværner AS www.kvaerner.com 1/1 Edvard Grieg Topsides Client Ordered Delivered Yard Lundin Norway AS May 2012 April 2015 Kvaerner Stord PRINCIPAL DATA Design: Aker Engineering Technology Complete topsides with main decks frame, utility module combined with living quarter, process module and flare tower. Total topsides weight : 22 000 t SCOPE OF WORK Design, engineering, procurement, construction, load-out, sea-fastening and hook-up. MAJOR SUBCONTRACTORS Engineering : Aker Solutions Process module : Aker Solutions Egersund Living quarter : Apply Leirvik Steel structures: : MPG, EPG, Crist Offshore and Vistal, Poland Piping : Energop, Poland Insulation/fireproofing : Norisol HVAC : GMC HVAC Load-out Stord : ALE

Upload: phungthuan

Post on 19-Apr-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Edvard Grieg Topsides - Kvaerner Grieg fact sheet.pdf · Kværner AS  1/1 . Edvard Grieg Topsides. Client Ordered . Delivered

Kværner AS www.kvaerner.com 1/1

Edvard Grieg Topsides Client Ordered Delivered Yard

Lundin Norway AS May 2012 April 2015 Kvaerner Stord

PRINCIPAL DATA Design: Aker Engineering Technology Complete topsides with main decks frame, utility module combined with living quarter, process module and flare tower. Total topsides weight : 22 000 t

SCOPE OF WORK Design, engineering, procurement, construction, load-out, sea-fastening and hook-up.

MAJOR SUBCONTRACTORS Engineering : Aker Solutions Process module : Aker Solutions Egersund Living quarter : Apply Leirvik Steel structures: : MPG, EPG, Crist Offshore and Vistal, Poland Piping : Energop, Poland Insulation/fireproofing : Norisol HVAC : GMC HVAC Load-out Stord : ALE