educational session sponsors: alert management systemsaztec tentsseitz, the fresher companytoptec...
TRANSCRIPT
Know If You Made a Profit:Job Costing Essentials
Educational Session Sponsors: Alert Management
SystemsAztec Tents Seitz, The Fresher
CompanyTopTec Products
Panelists:
Jonas Hutchison, CERP, Party Reflections, Charlotte, North CarolinaLacey Wright, CERP, Celebrations! Event Rentals & Tents, Roseville, California
William Pretsch, Mahaffey Tent Rentals, Memphis, Tennessee
Please remember to thank these
educational session sponsors
Booth #2346
Booth #3720
Booth #3740
Booth #2725
Know If You Made a Profit:Job Costing Essentials
Educational Session Sponsors: Alert Management
SystemsAztec Tents Seitz, The Fresher
CompanyTopTec Products
Panelists:
Jonas Hutchison, CERP, Party Reflections, Charlotte, North CarolinaLacey Wright, CERP, Celebrations! Event Rentals & Tents, Roseville, California
William Pretsch, Mahaffey Tent Rentals, Memphis, Tennessee
What is Job Costing?
presented by
Jonas Hutchison, CERP
What is job costing?
A job-specific costing technique, used in situations where each job is different and is performed to the customer’s expectations.
Helps to determine if your pricing model works effectively.
Can be used as a training tool for both sales and operations.
Where to start? Labor – Consider those positions that touch your inventory. Those associates are considered your direct labor which is needed to compute your job profitability.
Supplies – Any supply that is used on your inventory as it goes in and out of your building is considered a direct cost. For example, hangers in the laundry, plastic wrap for your tents or chairs and chemicals in your laundry and kitchen. Also consider items needed while on a job site. Everyone of us has guys that are keeping hardware stores in business. These expenses need to be included if they are job related.
Where to start? - Continued
Transportation – We consider Maintenance, Repairs and Fuel a direct cost. Some may consider insurance, property tax and registration fee’s also, but we do not.
Inventory Wear & Tear – We define a rental life for every piece of inventory. Our rental life is defined by the number of rentals the item will typically get before it’s either broken (not repairable) or not up to quality standards.
Travel – Lodging, Meals, Airline, etc.
LaborWarehouseWe assign a cost to staging, cleaning, loading and unloading in our POSFormula: Qty Rented X Cost per Activity (Staging, Cleaning, Loading, Unloading)
FieldFormula: Number of Guys X Number of Hours X Average Fully Loaded Field Rate
ORIn your payroll system you may be able to assign a job name to each associate andthe hours worked on a particular job.
Calculating the Numbers
Calculating the Numbers Supplies (Use one of these methods for each department)
Two different ways to calculate:
First, get two numbers for each of your departments. The gross revenue for 2013 and the amount you spent on supplies for that department. Use the two numbers to get the amount of expense in every $ of revenue.
Formula: Cost of Linen Supplies / Linen Revenue
For example: $25,000/$250,000 = $0.10 which means for every $1 in revenue the department spends $0.10 in supplies.
Second method is specifically finding out what it costs to clean and restock each piece of linen. How much is the hanger, the bag, the tag, the chemicals, the water, etc.
Transportation
Add together your maintenance, repairs and fuel costs for 2013 and find out how many miles your trucks hauled during 2013.
Formula: Transportation Costs / Truck Miles
For example: $150,000/300,000 = $0.50 which means for every mile in truck usage the company spends $0.50 on the truck.
Calculating the Numbers
Inventory Wear & Tear
Formula: Purchase Price / Rental Life
For example: an item has a rental life of 50 rentals and has a purchase price of $100.
$100 / 50 = $2 cost per rental
Calculating the Numbers
Type Formula Total
Revenue Small table & linen order $700
Labor – WH Task Cost X Qty - $45
Labor – Field Hours X Guys X Ave Wage4 X 1.5 X 15
- $90
Supplies – Linen Supply Cost per $1 in Revenue X Revenue by Dept on $0.10 X $400
- $40
Supplies - Tables $.05 X $275 -$13.75
Transportation Trans. Cost per Mile X Miles60 X $0.50
- $30
Inventory Wear & Tear Purchase Price / Rental Life X Qty Rented$100 / 50 X 20 (Tables) $40 / 10 X 20
-$120$361.25 Gross Profit
Time for Questions for Jonas
$5,000 to $25,000 jobs
presented by
Lacey Wright, CERP
Case Study #1
New Year’s Eve Party:Contract #32792
Job Location: about 1 hour away
Qty
1
1
1
1
8
4
6
6
9
4
4
1
1
12
42
1
CONTRACT TOTAL $14,915.29
DELIVERY - J ACKSON Sold
DANCE FLOOR - ALL WHITE - 3'X4' Returned
*Size: 21x24Dance Floor MUST be installed on LEVEL surfaces. Celebrations will NOT shim or level ground surface on installation. Special installation arrangements must be made in advance for install on gravel, sand, decomposed granite, etc. MUST BE COVERED WHEN NOT IN USE (ie tarp, under tent, etc.)
114" X 180" - WHITE Returned
PILLOW - VARIOUS COLORS Returned
STUDIO - SQUARE OTTOMAN 22" Returned
114" X 156" - WHITE Returned
STUDIO - ROUND OTTOMAN 22" Returned
STUDIO - CORNER SECTION 30" Returned
STUDIO - MIDDLE SECTION 30" Returned
STUDIO - OTTOMAN SECTION 30" Returned
TABLE - LEG EXTENDERS 42" Returned
BAR - LIGHTED 66"x20" Returned
TABLE - BANQUET - 8' Returned
TABLE - BANQUET - 6' Returned
lighting package option three
Items Status
CUSTOM SWAGS (NOT IN OUR TENTS) Returned
Purple
CUSTOM LIGHTING PACKAGE Returned
Pickup Date: Tue 1/ 1/2013 Phone: Complete lighting package includes:
*ballroom perimeter uplighting (blue)*main bar highlighting (red or purple)*gobos (beaded pattern)
Delivery and PickupDelivery : Sat 12/29/2012 Contact:
Invoice #: 32792
Event End: Tue 1/ 1/2013 5:00PM
Invoice Date: Wed 1/ 2/2013Event Beg: Sat 12/29/2012 9:00AM
Type Date Num Source Name Memo Amount
Cost of Goods Sold
5001 · Equipment Re-Rent (Sub-rentals)
Bill 12/31/2012 123112J Lighting Company Lighting Package 3,380.00
Total 5001 · Equipment Re-Rent (Sub-rentals) 3,380.00
5011 · Travel - Direct COS
Credit Card 12/29/2012 AH Safeway lunch for install crew 25.96
Total 5011 · Travel - Direct COS 25.96
5012 · Misc. Expenses - Direct COGS
Credit Card 01/01/2013 TM Lowes bolts for the Jackson light 24.67
Total 5012 · Misc. Expenses - Direct COGS 24.67
Total COGS 3,430.63
Expense
6598 · Wages
6600 · Gross Wages
Total 6600 · Gross Wages 1,390.28
6645 · Payroll Taxes
Total 6645.1 · ETT 1.37
Total 6645.2 · SUTA 61.14
Total 6645.3 · Social Security 84.24
Total 6645.4 · Medicare Tax 19.69
Total 6645.5 · FUTA 8.16
Total 6645 · Payroll Taxes 174.60
Total Labor 1,564.88
Net Ordinary Income -4,995.51
Job Cost Report – Contract #32792
Qty
1
1
12
26
1
2
16
10
9
8
1
8
2
1
8
5
2
1
2
20
2
3
3
10
1
Qty
1
1
CONTRACT TOTAL $20,672.62
Event End: Sun 5/19/2013 6:00PM
Invoice Date: Mon 5/20/2013Event Beg: Wed 5/15/2013 9:00AM
Delivery and PickupDelivery : Wed 5/15/2013 8:00AM
Pickup Date: Sun 5/19/2013 8:00AM
Invoice #: 34999
TENT - 25 METER INTERIOR GABLE Returned
WALL CLEAR 3.4 M x 5 M (16') Returned
Items Status
PER DIEM Sold
Greenroom/ volunteers
WALL - SOLID J T 8' x 20' Returned
2- 20'X 30'
7- for exits, 5 for walls
WALL SOLID 3.4 M x 5 M (16') Returned
J UMBO TRAC - 20' X 30' Returned
LIGHTED EXIT SIGNS Returned
NO SMOKING SIGNS Returned
WALL - SOLID J T 8' x 10' Returned
6- 20'X 30' tent, 10- 2 on each 10'X 10' on 5 of the 10'X 10'
FIRE EXTINGUISHER Returned
FESTIVAL - 15' X 15' Returned
entry tent
TENT - LEGS - 10' Returned
STRUCTURE - 82' X 148' (25mX45m) Returned
TENT - BEAM CLAMP - MID BEAM Returned
4- 15'X 15', 4- 10'X 10'
WALL - SOLID J T 10' x 15' Returned
2- 2 of the 15' sides
FESTIVAL - 10' X 10' Returned
1 on 10' legs, 5- on 8' legs
WALL - SOLID J T 10' X 10' Returned
STAGE SECTION - 3'X6' - 24" HT Returned
*Size: 15x24 *Skirt (y/n): yes *Step (y/n): yesStage MUST be installed on LEVEL surfaces. Celebrations will NOT shim or level ground surface on installation.
2 on one of the 10'X 10'
21' SKIRT - BLACK Returned
17' SKIRT - BLACK Returned
HEATER - FORCED AIR - 80 Returned
EXTENSION CORDS - 100' Returned
WOODEN STEP WITHOUT RAILS Returned
HEATER - FORCED AIR - 170 Returned
TENT - EQUIPMENT Sold
FIRE PERMITS Sold
for lighted exit signs
DELIVERY - LIVERMORE Sold
Items Status
Case Study #2
Non-Profit Fundraiser:Contract #34999
Job Location: about 2 hours away
Type Date Num Source Name Memo Amount
Cost of Goods Sold
5001 · Equipment Re-Rent (Sub-rentals)
Bill 05/24/2013 77739 RentalCompany subrent skirting 127.88
Total 5001 · Equipment Re-Rent (Sub-rentals) 127.88
5010 · Equipment Rental - Direct COGS
Bill 05/31/2013 7 Equipment Company Bobcat Rental 750.00
Total 5010 · Equipment Rental - Direct COGS 750.00
5011 · Travel - Direct COS
Credit Card 05/01/2013 MW Orbitz.com Hotel Rooms 283.98
Credit Card 05/15/2013 CM Popeye's Chicken food 60.96
Credit Card 05/16/2013 CM Round Table Pizza food 80.03
Credit Card 05/19/2013 CM The Donut Shop food 24.26
Credit Card 05/19/2013 CM Rotten Robbie fuel & snacks 127.71
Check 05/22/2013 44635 Employee reimbursement - meals 82.31
Total 5011 · Travel - Direct COS 659.25
5012 · Misc. Expenses - Direct COGS
Check 04/18/2013 10338 Fire Department Fire Permits 300.00
Credit Card 05/15/2013 CM Lowes supplies 69.72
Credit Card 05/16/2013 MW Fed Ex printing occupany signs 20.39
Credit Card 05/17/2013 MW Fed Ex printing occupany signs 4.08
Total 5012 · Misc. Expenses - Direct COGS 394.19
Total COGS 1,931.32
Expense
6598 · Wages
6600 · Gross Wages
Total 6600 · Gross Wages 6,284.72
6645 · Payroll Taxes
Total 6645.1 · ETT 0.45
Total 6645.2 · SUTA 20.00
Total 6645.3 · Social Security 388.59
Total 6645.4 · Medicare Tax 90.88
Total 6645.5 · FUTA 2.66
Total 6645 · Payroll Taxes 502.58
Total Labor 6,787.30
Net Ordinary Income -8,718.62
Job Cost Report – Contract #34999
• Bidding Events
• Salesman Reviews
• Inventory Price Adjustments
• Inventory Utilization
• Adding New Product
• Education
How do we use job costing to benefit our business?
Time for Questions for Lacey
> $25,000 job
presented by
William Pretsch
Subcontracted Eq/Service 8,200 Est Generator Fuel 300
Total 8,500
15% Profit 1,500 10,000
Rental Revenue 26,278
Subcontracted RevenueTransportationHotel/Per Diem
Total Revenue
9,990
300 0
36,568
Rental Revenue 26,278 10% Discount (2,628)
Rental Revenue 23,650 Subcontracted Revenue 9,990
Transportation 300 Hotel/Per Diem Total Revenue 33,940
Mahaffey Tent Rentals
Job Costing Recap
Client Name & Contract #: LeRue Wedding Job Location Southwind TPC
Event Dates: 4/28/2014 Sales Person: Joshua
Installation Dates: 4/20-26/2014 Take Down Dates: 4/29-30/2014
Installation Supervisor: Walker/TJ Take Down Supervisor: Walker/TJ
Profit (15%Rev+SCmarkup) 5,128
Commission (2.5%/5%) 676
Admin O/H 5,269 22%
BudgetAdjusted Revenue 22,868
Description Budget
Load / Unload / Washing 1,900
Equipment Expense 1,300
(additional funds) -
Subcontracted Eq/Service 8,200 Est Generator Fuel 300
Labor (Installation) 5,500 (additional funds) 1,100
Labor (Dismantle) 3,800 (additional funds) 400
Travel/Per Diem - (additional funds) -
Supplies/Misc. - Home Depot -
Transportation (Install) 150
Transportation (Dismantle) 150
Contingency -
Total Expense 22,800
Operations Summary
Client Name & Contract #: LeRue Wedding Job Location Southwind TPC
Event Dates: 4/28/2014 Sales Person: Joshua
Installation Dates: 4/20-26/2014 Take Down Dates: 4/29-30/2014
Installation Supervisor: Walker/TJ Take Down Supervisor: Walker/TJ
Rental Revenue 26,27810% Discount (2,628)
Rental Revenue 23,650Subcontracted Revenue 9,990
Transportation 300Hotel/Per DiemTotal Revenue 33,940
Profit (15%Rev+SCmarkup) 5,128Commission (2.5%/5%) 676
Admin O/H 5,269
BudgetAdjusted Revenue 22,868
Operations Expense 22,800 Add'l Profit/Exp 68
Total Profit/Loss 5,196 % 15%
Description Budget Actual Variance % of Rev
Load / Unload / Washing 1,900 3,019 (1,119)
Equipment Expense 1,300 2,216 (916)
(additional funds) - -
Subcontracted Eq/Service 8,200 8,455 45 Est Generator Fuel 300
Labor (Installation) 5,500 9,464 (2,864) 40%(additional funds) 1,100 -
Labor (Dismantle) 3,800 4,138 62 17%(additional funds) 400 -
Travel/Per Diem - - - (additional funds) - -
Supplies/Misc. - Home Depot - 373 (373)
Transportation (Install) 150 685 (535)
Transportation (Dismantle) 150 225 (75)
Contingency -
Total Expense 22,800 28,575 (5,775)
Operations Summary
Client Name & Contract #: LeRue Wedding Job Location Southwind TPC
Event Dates: 4/28/2014 Sales Person: Joshua
Installation Dates: 4/20-26/2014 Take Down Dates: 4/29-30/2014
Installation Supervisor: Walker/TJ Take Down Supervisor: Walker/TJ
Rental Revenue 26,27810% Discount (2,628)
Rental Revenue 23,650Subcontracted Revenue 9,990
Transportation 300Hotel/Per DiemTotal Revenue 33,940
Profit (15%Rev+SCmarkup) 5,128Commission (2.5%/5%) 676
Admin O/H 5,269 22%
Budget ActualAdjusted Revenue 22,868 22,868
Operations Expense 22,800 28,575Add'l Profit/Exp 68 (5,707)
Total Profit/Loss 5,196 (580)% 15% -2%
Successful Job:Profitable ______
Referral/Testimonial ______Rebook ______
Lessons Learned: --never give 10% discount for "large volume order" --failed to account for overtime wage rates on set up --rented forklift to access backyard - didn't budget delivery costs --rental went +2days waiting for muddy site to dry before down --hectic week, rented truck since ours was here every day --should have added 3-5% contingency for unforseen expenses --muddy site required extra time to wash fabric after job
• BIG jobs aren’t always good jobs• Qualify the client• Know the opportunity costs• Beware of EGO• Sub-rent for profitable growth• What could possibly go wrong?• Control your destiny
Lessons Learned:
Time for Questions for William
Time for Overall Questions
Next Session
6 p.m. – 8 p.m.Café Tu Tu Tango
Shuttle service from all Show hotels except those within walking distance.
Advance registration and ticket required.
Reception
Room S320 Keynote Address Susan Southerland