Introduction
• The 1973 oil crisis lead to a global change of the European energy politics in an attempt to reduce external dependence.
Some priorities were defined:
• Diversify the oil supply;• Promote the saving and the rational use of
energy;• Develop the internal sources of energy.
3BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Renewable Energy Sources
• Renewable energy sources achieved greater importance, as a main contribution to the global security in terms of energy supply
Some priorities were defined:
• Research;• Development of new technologies;• Legal context.
4BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Legal Context
• Technical definition of the plants connection to the grid;
• Remuneration process assured;
• Obligation of purchasing the energy emitted to the grid;
• Support to the investment.
5BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Legal Context
• Decree-Law nº 168 / 99 - Renewable Energies
• Use of “green tariff” concept;• Remuneration process that internalises:
– environmental benefits;
– reduction of costs in the Public Electric System;
• Inflation correction by means of the monthly index of consumers price.
6BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Legal Context• Decree-Law nº 538/99 - Cogeneration
• Internalisation of environmental benefits;• Remuneration of the reduction of costs and losses in the grid;• Remuneration related to the dollar and the oil price;• Introduction of the equivalent electric efficiency concept.
– environmental benefits;
– reduction of costs in the Public Electric System;
• Inflaction correction by means of the monthly index of consumers price.
7BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Percentile distribution of production under a special regime in 2002 (Portugal)
Wind
12,09%
Small Hydro
25,11%
Cogeneration
41,29%
Biomass
1,35%
Others
4,22%
Biogas
0,00%
Urban waste
15,94%
8BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Weight of production under a special regime (PSR) in terms of the total energy flow in the
grid - 2002 (Portugal)
RNT
87,08%
PNV
3,39%PSR
7,04%SENV
2,49%
9BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
7,5
9,1
35,5
15,7
14,4
14,01
4,8
1,34
0,48
7,02
12,23
10,04
0,608
0,072
0,65
5,95
1,852
0,627
2,7
0,731
2,4
0,25
4,4
9,24
10,6
2,46
3,66
15,5
66,9
55,8
14,2
0,3
21,3
5,9
2,1
0,7
0,69,3
10,4
62,2
74,4
0,07
11.8
10,3
13
1,6
26,09
10BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
279,8
1,2
0,018
57,486,8
10,7
15,6
33,5
10,2
12,4
0,8
39,7
26
2,577,242
11,2
5,4
6,09
38,3
0,34
62
16,24
0,006
22,66
10,6
18,2
3,2
16,4
0,278
29,8
74,4
44,8
5,4
18,678
24,44
20,3
24,6
5,7
16,5
19
35,91,6
4,44
51,4
4,44
26.9
22,6
11BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
29,6
11
13,365
53
0,9
3
45
72
2,6
1,61
52,8
5,96
9,1
17,96
18,8
12BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
53
5,925
13BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
0,011
0,006
0,0227
14BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Remuneration process for renewable energies
• The remuneration is based on the avoided costs:
• Fixed Remuneration (PF) - represents the avoided investment costs;
• Variable Remuneration (PV) - represents the avoided operation costs;
• Environment Remuneration (PA) - valorises the avoided CO2 emissions.
15BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Remuneration process for renewable energies
• In the remuneration process the following parameters are still considered:
• LEV - represents the losses prevented in the nets;
• KMHO - depends on the diagram of energy production;
• Correction according to the inflation.
16BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Wind PlantsRemuneration Distribution (%)
43,20%
38,90%
11,20%
1,40%5,20%
KMHO LEV PF PV PA
Environment Remuneration
17BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
KMHO - Modulation of Production DiagramHidro
0,00
0,20
0,40
0,60
0,80
1,00
1,20
1,40
0 10 20 30 40 50 60 70 80 90 100
Percentage of energy during low load hours
KM
HO
18BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Increase of Remuneration due to the Z parameter
without Z with Z
Wind Hydro
+ 27 %
+ 8%
19BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Remuneration process for cogeneration
• Fixed Remuneration (PF) - which is proportional to the power emitted to the net;
• Variable Remuneration (PV) - which is proportional to the energy emitted; represents the avoided operation costs;
• Environment Remuneration (PA) - which is also proportional to the energy emitted; valorises the avoided CO2 emissions.
20BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Remuneration process for cogeneration
• In the remuneration process the following parameters are still considered:
• LEV - represents the losses prevented in the nets;
• KMHO - depends on the diagram of energy production;
• Correction according to the inflation, the relation between Euro/Dollar and the price of oil.
21BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Cogeneration
Environment Remuneration
Remuneration Distribution (%)
17,00%
2,40%1,10%
13,00%
66,50%
KMHO LEV PF PV PA
EnvironmentRemuneration
22BRITO Portugal Session 4 – Block 1
Barcelona 12-15 May 2003
Future Perspectives
• Reduction of the obstacles that can prevent the increase of electricity by means of renewable sources of energy;
• Simplification of administrative procedures;• Establishment of objective rules;• Easy access to the grid, maintaining the
reliability and safety of the electric system.• Introduction of the “green certificates”
mechanism.