edld 5352 power point blog

20
E- RATE Schools and Libraries Program of the Universal Service Fund and technology in GISD

Upload: tlboyds

Post on 22-Apr-2015

284 views

Category:

Education


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Edld 5352 power point blog

E- RATESchools and Libraries Program of the Universal Service Fund and technology in GISD

Page 2: Edld 5352 power point blog

AGENDA

What is E-Rate? Eligible Services List (ESL) District Technology Improvement Plan How are we doing? (STaR Chart) Conclusion

Page 3: Edld 5352 power point blog

Universal Service Fund Discount for acquiring

telecommunication services for schools and libraries

Based on need using data from free and reduced lunch program

District requirements: internet access and internal connections for technology use in the classrooms

E-RATE

Page 4: Edld 5352 power point blog

Eligible Services List

Categories1. Basic Maintenance of Internal

Connections (BM)2. Internet Access (IA)3. Internal Connections (IC)4. Telecommunication Services (TS)

Page 5: Edld 5352 power point blog

Basic Maintenance of Internal Connections

Present to ensure that internal connection operations components are working.

Not a one time fee- occurs repeatedly.

Page 6: Edld 5352 power point blog

Internal Connections

Basic installations and maintenance of network

Page 7: Edld 5352 power point blog

Internal connections

Equipment and wiring needed to receive internet in the classroom.

Routers, hubs, network file servers, wireless Local Area Networks (LAN), software for operating file servers

Personal computer used for fileservers or switches (not for students or teachers)

Page 8: Edld 5352 power point blog

Telecommunications Services Basic Phone service (does not require

technology plan) Non-basic telecom services (requires

technology plan) Examples: pagers for security officials,

high bandwidth telecommunication services, satellite delivery for distance learning, coaxial cable

Page 9: Edld 5352 power point blog

Eligible

Installation Activation Initial configuration Training Shipping Taxes and lease fees

Page 10: Edld 5352 power point blog

Not Eligible

Interest or finance charges Initial planning fees Late payments Termination charges Training of person using technology

Page 11: Edld 5352 power point blog

GISD Technology Plan

4 campuses Total student enrollment: 1875 % Economically Disadvantaged: 51.37% 100% classroom internet access Computer to student ratio: 3 to 1

Page 12: Edld 5352 power point blog

Goals of Technology Plan

Goal 1: Increase student academic performance through the integration of technology in teaching and learning.

Goal 2: Provide professional staff development focusing on curricular integration of technology.

Goal 3: Maintain a technology infrastructure which meets current and projected needs

Page 13: Edld 5352 power point blog

Goals of Technology Plan

Goal 4: Administrative Services will maintain support of curriculum and assessment.

Goal 5: The district will collaborate and communicate with the community and parents.

Page 14: Edld 5352 power point blog

Technology Budget

Technolology Budget

Telecom $166,660Materials $230,400Equipment $177,450Maintenance $113,708Staff Development $ 60,775Miscellaneous $66,825

Page 15: Edld 5352 power point blog

Asessment of Needs :

STaR chart data Technology Application Standards Focus group input Staff development need surveys and

interviews Inventories of equipment and software

Page 16: Edld 5352 power point blog

Needs Assessment

1. The district shall maintain a reliable infrastructure to support the current and projected technical and instructional needs of teachers and students.

2. The district shall continue to provide increased access to multimedia computers for each teacher and student.

Page 17: Edld 5352 power point blog

Needs Assessment

3. The district shall ensure the implementation of Technology Application TEKS in grades K-8 as required by the state.

4. The district shall provide professional development opportunities for teachers and staff at varied levels of technology use and for the integration of technology into instruction.

Page 18: Edld 5352 power point blog

STaR Chart Data

Completed annually by schools receiving federal funding

Assesses the following areas:1. Teaching and learning2. Educator preparation and development3. Leadership, Administration, &

Instructional Support4. Infrastructure for Technology

Page 19: Edld 5352 power point blog

Elementary School STaR Rating 2010

Technology and Learning: Developing Technology - 11 Educator Preparation & Development: Developing Technology - 10 Leadership, Administration, & Instructional

Support: Developing Technology - 13 Infrastructure for Technology: Developing Technology - 12

Page 20: Edld 5352 power point blog

In Conclusion….

E-Rate is being used to help find funding for technology in our district

The district has a plan in place with goals for improvement

The STaR Chart data shows room for growth

Giddings ISD technology planSTaR ChartUniversal Services Company