ECSS / CCSDS meeting09 October 2007 - Darmstadt
Slide 1
ECSS presentation to CCSDS
![Page 2: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/2.jpg)
09 October 2007ECSS / CCSDS meeting Slide 2
Content
The European Collaboration for Space standardization ECSS Objectives/ Facts Users’s Feedback From development to application & maintenance phase New ECSS Organization ECSS types of documents ECSS Tree of standards ECSS E-50 (Communications) & E-70 (Ground System
and operations) standards
![Page 3: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/3.jpg)
09 October 2007ECSS / CCSDS meeting Slide 3
The European Collaboration for Space standardization
ECSS is an intiative established to develop a single set of consistent space standards for use by the entire European Space Community.
ECSS standards have evolved from the previous 30 years’experience in the management and implementation of European Space Projects.
ECSS has developed through a partership between the European Space Agency. National Space Agencies and European Industry
![Page 4: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/4.jpg)
09 October 2007ECSS / CCSDS meeting Slide 4
ECCS Members
Present members of ECSS are ESA (European Space Agency), the National Space Agencies of Canada, France, Germany, Italy, Norway, the Netherlands, the United Kingdom and European space industry represented by Eurospace.
some organization have an Observer role on ECSS e.g. EUMETSAT, CEN
![Page 5: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/5.jpg)
09 October 2007ECSS / CCSDS meeting Slide 5
How it works
Is written in consensus by Industry and Agency Experts Define the requirements rather than the means Makes maximum use of existing and commonly used
international standards Illustrates best practice techniques Has flexibility through tailoring
About 150 standards published
![Page 6: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/6.jpg)
09 October 2007ECSS / CCSDS meeting Slide 6
ECSS Objectives / FactsECSS Objectives / Facts
Established to:– increase the effectiveness of all space programmes in Europe through
the application of a single set of Standards and Requirements recognised by all potential European Customers and equally accepted by Industry.
– Support the space manufacturing industry in Europe
Primary strength is to facilitate standardization of contract requirements in customer/provider relations throughout all levels of space activities
Recognised and appreciated by all European space entities, non-European space entities and various European and International Organizations for Standards. Several Space Agencies have expressed their interest for using ECSS Documents (Ukraine, Russia, Japan, China, Australia and Brazil).
Catch-up production of standards during past two years (mainly in the engineering branch) has led to an almost coherent and complete set of ECSS standards
Call-up of ECSS as applicable standard in contracts has become a recognised practice in European space business
![Page 7: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/7.jpg)
09 October 2007ECSS / CCSDS meeting Slide 7
Users’s Feedback
Users’s feedbacks: Confirmation of approaching the maintenance phase
(less development needed). Identification of points to be improved :
– Standards need to be more focused for direct application to business i.e.
– Avoid mixing requirements, recommendations & informative material
– requirements uniquely identified and verifiable – Resolve incoherencies and inconsistencies in and
across documents.
ECSS to go from development phase to application and maintenance phase
![Page 8: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/8.jpg)
09 October 2007ECSS / CCSDS meeting Slide 8
ECSS Steering Board set-up dual task force end 2005 to propose way forward into new phase of ECSS
– Scope TF1: ECSS organizational aspects
– Scope TF2: Contents of ECSS standards
Results and SB deliberations (June 2006): New ECSS Organization:
More user oriented For transitional & maintenance phases With simplified processes and decisional levels With increase ECSS members ownership of product
ECSS Types and Content: 3 Categories of ECSS documens (Standards, Handbook,
Technical Memorandum) Enforcement application of drafting rules Benchmarking phase to complete and review the set of
standards
From development toapplication & maintenance phase
![Page 9: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/9.jpg)
09 October 2007ECSS / CCSDS meeting Slide 9
New ECSS Organization
Steering Board (SB)
Working Group
Executive Secretariat (ES)
Technical Authority (TA)
Network of experts
Working GroupWorking
GroupWorking Group
Steering Board (SB):
Delegates from member organisations. Responsible for policy and strategy issues and for overall supervision.
Does not approve individual Standards.
Technical Authority (TA):
Delegates from members organizations.
Set up and implement Work-plan.
Authorize Public Review and approval of documents.
Executive Secretariat (ES):
Performed by ESA/ESTEC.
Provide support to SB & TA. Support WGs in drafting documents in accordance with ECSS rules / procedures.
Custodians of ECSS docs.
Collect and analyze of Change Requests, New Work Items Proposals, feedback …
Overall Monitoring of schedule and budget
![Page 10: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/10.jpg)
09 October 2007ECSS / CCSDS meeting Slide 10
ECSS types of documents
ECSS set of documents reorganized according to 3 types of documents Standard
– Normative document written specifically for direct use in invitation to tender and business agreements for implementing space related activities. Its content strictly limited to the statement of verifiable customer requirements, supported by the minimum descriptive text necessary for understanding their context.
Handbook– Non-normative document providing background information, e.g.
orientation, guidelines, technical data, advice or recommendations, which contains information about how to implement space related activities.
– Two types of handbook are considered: 1) Guidelines and good practices 2) Collecion of data
– Note: Handbook contains data recognized as valid for use by the ECSS community.
Technical Memorandum– Non-normative document providing useful information to the space
community on a specific subject, prepared to record and present non-normative data, which are not relevant for a Standard or for a handbook, or not yet mature to be published as handbook or standard.
![Page 11: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/11.jpg)
09 October 2007ECSS / CCSDS meeting Slide 11
ECSS Tree of standards
![Page 12: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/12.jpg)
09 October 2007ECSS / CCSDS meeting Slide 12
TITLE PUBLISHED IN PREP PUB. DATE
Comms general req. E-50A (Parts 1&2) E-50B 4Q07
Telem. Sync. & channel coding NO E-50-01A 4Q07
Ranging & doppler tracking E-50-02A NO 24 Nov 2005
Telemetry transfer frame protocol NO E-50-03A 4Q07
Telecommand NO E-50-04A 4Q07
RF & Modulation E-50-05A E-50-05B 1Q08
SpaceWire: links, nodes, routers & networks E-50-12A NO 24 Jan 2003
MIL1553B protocol extension NO E-50-13A 2Q08
Spacecraft discrete interfaces NO E-50-14A 4Q07
E-50 standards (Communications)
![Page 13: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/13.jpg)
09 October 2007ECSS / CCSDS meeting Slide 13
TITLE PUBLISHED IN PREP PUB. DATE
Ground systems & Operations E-70A (Parts 1&2) E-70B 1Q08
On-Board Control Procedures NO E-70-01A 4Q08
Space segment Operability E-70-11A NO 5 Aug 2005
Monitoring & control datadefinition NO E-70-31A 4Q07
Procedure definition language(including PLUTO) E-70-32A NO 24 Apr 2006
Telemetry and telecommandpacket utilization (PUS) E-70-41A NO 30 Jan 2003
E-70 standards (Ground Systems and Operations)
![Page 14: ECSS / CCSDS meeting 09 October 2007 - Darmstadt Slide 1 ECSS presentation to CCSDS](https://reader036.vdocuments.mx/reader036/viewer/2022082710/56649e585503460f94b51927/html5/thumbnails/14.jpg)
09 October 2007ECSS / CCSDS meeting Slide 14
New ECSS E-50 activities under consideration:
• E-50-10: On-board data handling (NEW)
• E-50-11: RMAP SpaceWire protocol (NEW)
• E-50-15: CAN Bus protocol (NEW)
New ECSS E-70 activity under consideration:
• E-70-41B (PUS updating, phase 1)
• E-70 Level 2 Consolidation with European Technology Harmonization
• Mapping of E-70-31 into XTCE HB