ecoop annual meeting | 2008- 02-13 | kcs integration of observing networks (pan - eu baseline...

14
ECOOP Annual meeting | 2008-02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives • Integration of existing EU-wide marine observation systems, • harmonising flow of real time and near real time observational data • co-ordination accessing Earth Observation (EO) products in order to maximise the benefit from existing national and European resources.

Upload: jacob-pierce

Post on 03-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

Objectives• Integration of existing EU-wide marine

observation systems,• harmonising flow of real time and near real

time observational data• co-ordination accessing Earth Observation

(EO) products

in order to maximise the benefit from existing national and European resources.

Page 2: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

T2.1 - Network evaluation and data delivery

T2.2 - Establish a data management system to deliver real time and

near real time data in an optimal and cost-effective mode

T2.3 - Ensure proper and maximum real time delivery of remote

sensing data

T2.4 - Quality assurance

T2.5 - Establish a pan-EU data base for river run-off

T2.6 - Products and services

T2.7 - WP2 coordination (T2.0)

Page 3: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

T2.1 - Network evaluation and data delivery (Giuseppe Manzella)

S2.1.1 - Provide an inventory of the data management systems used for marine regional and coastal observation systems (Aldo Drago)

D2.1.1.1 (July 2007): Central web page for accessing the

inventories (version 0).

http://www.capemalta.net/ECOOP/index.html

Manzella Giuseppe (ENEA) - AZTI-Tecnalia, BSH, CEFAS, CMRC, CNR, DMI, DMU-NERI, DNSC, ENEA, GKSS, HCMR, IEO, IFREMER, IMEDEA-CSIC, IMR, IMS-METU, IO-BAS, IOLR, MHI, MSI, OC-UCY, PdE, RIKZ, SMHI, UNI-MALTA(IOI-MOC), UNIV-GDA

Page 4: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

D2.1.1.3: Report on existing observation programs fitting the ECOOP objectives

Mismatch: DoW (31.1.2008) - Progecta (31.7.2008)

We agreed to combine it with D2.1.1.2 to one report - end of July!

Page 5: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

T2.2 - Establish a data management system to deliver real time and near real time data in an optimal and cost-effective mode (Declan Dunne)

Declan Dunne (CMRC) - BSH, CMRC, CNR, DMI, GKSS, IFREMER, NERC, OC-UCY, PdE, TECHWORKS, UNIV-GDA

S2.2.1 - Design and implement the ECOOP Data Management System appropriate for integrating all existing regional and coastal systems

S2.2.2 - Define the metadata-interface

Page 6: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

Critically review possible ECOOP DMS options against partners’ user requirements, existing systems, INSPIRE recommendations, OGC standards, and other best practices.

D2.2.1.1 Report on existing regional centres documenting role, data types, and services.

D2.2.1.2 Delivery of a static web portal developed for ECOOPD2.2.1.3 Report on the architectural plan for building the ECOOP

DMS based on review of best practices (software patterns and design)

D2.2.2.1 Review of metadata practices at regional centresD2.2.2.2 Report on the architecture of the ECOOP metadata

catalogue system

Page 7: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

ecoop.ucc.ie

Page 8: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

T2.3 - Ensure proper and maximum real time delivery of remote sensing data (Rosalia Santoleri)

D2.3.1.1 Report on the design of the RT and NRT data satellite acquisition and delivery system for the TOP phase

S2.3.1 - Design the in situ and remote sensing acquisition phase

Page 9: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

T2.4 - Quality assurance (Susanne Tamm, kcs)

S2.4.1 - Identify the most suitable quality assurance protocols

AZTI-Tecnalia, BSH, GKSS, IMS-METU, SMHI

D2.4.1.1 Review of the most suitable quality assurance protocols

Soetje Kai (BSH) - AZTI-Tecnalia, BSH, DMI, GKSS, IFREMER, IMS-METU, IOW, PdE, SMHI

Page 10: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

T2.5 - Establish a pan-EU data base for river run-off

(Bruce Hackett)

D2.5.1.1 ECOOP River Data Catalogues (five regional) as digital spreadsheets

S2.5.1 - Assessment of existing river run-off data

Hackett Bruce (MET-NO) - AZTI-Tecnalia, BSH, MET-NO, MHI, RIKZ, SMHI

Page 11: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

D2.5.2.1 ECOOP River Station Lists (five regional) as digital spreadsheets

S2.5.2 - Interfacing to ECOOP Data Management system

Page 12: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

T2.6 - Products and services (Enrique A. Fanjul)

S2.6.1 - Definition and design of added value products

Alvarez Fanjul Enrique (PdE) - BSH, CLS, CMRC, HCMR, IO-BAS, MSI, PdE

D2.6.1.1 Report on designed added value products to be developed for EuroMISS (late - will be finished mid March)

Page 13: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

Report on existing observation programs fitting the ECOOP objectives D2.1.1.3 Drago Aldo LATE 31.01.2008ECOOP River Station Lists (five regional) as digital spreadsheets D2.5.2.1 Hackett Bruce LATE 31.01.2008Report on designed added value products to be developed for EuroMISS D2.6.1.1 Alvarez Fanjul Enrique LATE 31.01.2008

Central web page for accessing the inventories (version 0). D2.1.1.1 Drago Aldo COMPLETED 31.07.2007Report on existing regional centres documenting role, data types, and services.D2.2.1.1 Dunne Declan COMPLETED 30.06.2007.Delivery of a static web portal developed for ECOOP D2.2.1.2 Dunne Declan COMPLETED 31.10.2007Report on the architectural plan for building the ECOOP DMS based on review of best practices (software patterns and design)D2.2.1.3 Dunne Declan COMPLETED 31.10.2007Review of metadata practices at regional centres D2.2.2.1 Dunne Declan COMPLETED 30.06.2007.Report on the architecture of the ECOOP metadata catalogue system D2.2.2.2 Dunne Declan COMPLETED 31.01.2008Report on the design of the RT and NRT data satellite acquisition and delivery system for the TOP phase D2.3.1.1 Rosalia Santoleri COMPLETED 30.11.2007Review of the most suitable quality assurance protocols D2.4.1.1 Soetje Kai COMPLETED 31.01.2008ECOOP River Data Catalogues (five regional) as digital spreadsheets D2.5.1.1 Bruce Hackett COMPLETED 31.01.2008

LATE

COMPLETED

Summary

Page 14: ECOOP Annual meeting | 2008- 02-13 | kcs Integration of observing networks (pan - EU baseline system) WP2 Objectives Integration of existing EU-wide marine

ECOOP Annual meeting | 2008-02-13 | kcs

Integration of observing networks (pan - EU baseline system)

WP2

D2.2.2.3 (Mo15): Delivery of the ECOOP metadata catalogue system, including web-based search interface.D2.2.5.1 (Mo16): Report on the architectures of both the ECOOP DMS and EuroMISS.D2.1.1.2 (Mo18): Report on the inventories.D2.1.2.1 (Mo18): Draft report on common practices/protocols for data transfer and access.D2.1.4.1 (Mo18): Data interface for ECOOP version zero.D2.1.5.1 (Mo18): Acquisition of existing climatologies.D2.4.2.1 (Mo18): Report of the common QA-protocols to be used in the ECOOP DMS.D2.5.3.1 (Mo18): Report on interfacing river runoff data to the ECOOP Data Management System.D2.1.3.2 (Mo20): Report on data handling, transfer and delivery for the ECOOP observation system.D2.2.1.4 (Mo21): Implementation of the ECOOP Data management System - version 1.D2.2.4.1 (Mo21): Review and design of the WP 2.1 system architecture (the climatological compiling system).D2.2.4.2 (Mo21): Implement interface between climatological compiling system and the ECOOP DMS.D2.2.5.2 (Mo21): Implementation of the Interface between the ECOOP DMS and EuroMISS.D2.3.2.1 (Mo21): Near real time satellite data products for ECOOP selected zones.D2.6.2.1 (Mo24): Report of implemented real and near real time added value products for EuroMISS.D2.6.3.1 (Mo24): Report describing the best alternative for archiving large observational data sets.D2.4.3.1 (Mo29): Report of the data quality within the ECOOP Data Management System.D2.1.3.3 (Mo30): Data from ECOOP observing system.D2.2.1.5 (Mo30): Delivery of the ECOOP Data Management System - version 2.