economic cost of piracy 2012

80

Upload: peterakiss

Post on 16-Oct-2015

47 views

Category:

Documents


1 download

DESCRIPTION

An analysis of Piracy off the Somali coast.

TRANSCRIPT

  • 5/26/2018 Economic Cost of Piracy 2012

    1/80

  • 5/26/2018 Economic Cost of Piracy 2012

    2/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundao2013

    i

    This reports calculations were audited by:

    Cover photo provided by: NATOs Operation Ocean Shield

    Forward

    BIMCO has carried out a review of the methodologies and the calculaons of the ECoP 2012 report. We have

    found that the report fully lives up to the high standards necessary to earn respect and credibility among all an-

    piracy stakeholders in Government and Shipping Industry alike, and for the report to constute an informed and

    construcve contribuon to the an-piracy debate.

    The ndings of the report underscore the importance of the connued focus of Government and Shipping

    Industry stakeholders on combang piracy, and illustrates also well that problems like the Somali piracy problem

    can grow extremely costly over me. The implied lesson learned is that there is every reason to tackle similar

    upcoming problems swily and with early determinaon to avoid the problem becoming instuonalized and to

    minimize the cost of restoring law and order aerwards.

    It is BIMCOs hope that this lesson learned is not forgoen but is taken forward by the internaonal community

    when dealing with piracy problems elsewhere, currently most notably in the Gulf of Guinea region, where

    seafarers are regularly confronted with extremely cynical and oen deadly aacks by local pirates and robbers.

    -- Michael Lund, Deputy Secretary General, BIMCO

  • 5/26/2018 Economic Cost of Piracy 2012

    3/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    ii

    Lead Author:Jonathan Bellish

    ECoP Research Team:Thaddeus Cummins, Anjuli Manrique, Timothy Schommer

    OBP Team:Jim Gray, Liza Kane-Hartne, Jon Huggins, Kaija Hurlburt, Jens Vestergaard Madsen,

    Maisie Pigeon, Urmila Venugopalan

    Jon Huggins

    Director

    [email protected]

    Ph: +1 303 533 1710

    Jon Bellish

    Project Ocer

    [email protected]

    Ph: +1 720 274 8229

    More informaon about Oceans Beyond Piracy:For comments on the report:

    Jens Vestergaard Madsen

    Associate Director

    [email protected]

    Ph: +1 303 533 1708

    ofSomali Piracy 2012

  • 5/26/2018 Economic Cost of Piracy 2012

    4/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundao2013

    iii

    Table of Contents

    Founders Letter..................................................... ivExecutive Summary................................................ 1Acknowledgements................................................. 5Acronyms............................................................... 6Introduction........................................................... 7Scope of Costs Studied............................................ 8Methodology.......................................................... 9

    First Order Costs of Somali Piracy 1.The Cost ofRansoms & Associated Costs.......... 10 2.The Cost ofMilitary Operations....................... 13 3.The Cost ofSecurity Equipment & Guards........ 18 4.The Cost ofRe-routing..................................... 20 5.The Cost ofIncreased Speeds.......................... 22 6.The Cost ofLabor............................................ 25 7.The Cost ofProsecutions & Imprisonment........ 27 8.The Cost of

    Piracy-Related Insurance............... 31 9.The Cost ofCounter-Piracy Organizations........ 34

    Piracy Trends & Takeaways......................... 39Concluding Remarks................................... 40

    Appendix.................................................... 41

    Endnotes.................................................... 59

  • 5/26/2018 Economic Cost of Piracy 2012

    5/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    iv

    Founders Letter

    On behalf of the One Earth Future foundaon, I am proud to deliver the aached report on the Economic

    Cost of Somali Piracy 2012. We hope that it can provide useful insights for policy-makers addressing the

    challenging issue of how to reduce piracy on the global commons that are the worlds internaonal waters. As a

    businessman, I value objecve, stascal informaon as a primary tool to guide my own decision-making, and

    I believe that others who have found success in business do as well. I hope that both groups, industry leaders

    and policy-makers alike, will nd that the informaon in the report adds value to their own work at this crical

    juncture.

    In recent reports, we have noted some gaps in our reporng, which come from the inability to isolate second

    order costs of piracy to regional economies, the lack of detail regarding individual ship behavior, and the lack of

    consistent data on piracy incidents in the Indian Ocean. However, we felt that it was an absolute necessity that

    our best esmate of economic costs were available during the height of the crisis, providing some trend analysis

    for piracy experts to consider. Future reports will hopefully start tracking the terrible costs borne by Somalia and

    other naons along the Horn of Africa.

    One Earth Future also reports on the human cost of this crime at sea. Piracy has aected the seafarers caughtup in this violent crime, as well as ordinary Somalis who have suered the negave eects that pirates have

    brought to their communies. Some Somali youth, jobless and drawn to the nancial rewards of crime, have

    been recruited to piracy by pirate leaders and nanciers. Many Somali teenage lives were lost at sea rather than

    earning a living on shore. I believe that reporng on the various costs of piracy has been a crical contribuon to

    the publics understanding of this deplorable crime. Hopefully, these reports will call us to collecve acon.

    In this years report, it has been important for us to recognize that the internaonal community has developed

    and implemented an eecve response to solve the immediate crisis associated with piracy. On one hand

    I applaud the unprecedented cooperaon among naons, internaonal organizaons and industry in this

    endeavor. Nonetheless, the resulng decrease in pirate aacks has created an opportunity to refocus some

    of the piracy migaon eorts at sea. Now we must all turn our aenon to longer-term investment to build

    economic opportunity and governance capacity ashore. However, despite the dramac drop in pirate aacks,

    we found that over 99% of the cost of piracy is sll incurred at sea pursuing short-term migaon strategies. At a

    cost of around $6 billion a year, it is evident to me that we are not yet invesng in a lasng soluon ashore.

    As the report also shows, industry is paying dearly to suppress the cost of piracy, contribung almost $5 billion of

    the $6 billion spent in 2012. At a fracon of the cost, industry could be much beer served solving the problem

    on shore in Somalia. Indeed, members of the shipping industry have already begun considering how their funds

    could be put towards sustainable soluons in Somalia. In early 2013, K Line, Maersk Line, Stena, NYK Line,

    Mitsui OSK Line, Shell and BP have donated $1 million in support of job creaon and capacity building projects

    in Somalia. The group has pledged a further $1.5 million to fund those same eorts. I sincerely hope that other

    members of industry follow this example.

    To my mind, 2012 marked the end of Phase 1, where piracy was fought through suppression at sea. We hope

    that other stakeholders will join us in considering the best way to move into Phase 2, where the internaonal

    community partners with the Somali people to achieve success on shore.

  • 5/26/2018 Economic Cost of Piracy 2012

    6/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundao2013

    v

    My team and I have developed the following quesons to frame our thinking as we move into Phase 2. I invite

    the consideraon of and feedback from the community of stakeholders regarding each of these important issues:

    1. What is required to nally and conclusively break the back of the piracy business model?

    2. Is there polical support to shi crisis response assets that support piracy suppression at

    sea to eorts in support of longer term development and governance ashore?

    3. How can we reconcile the apparent mismatch between Somalias goal of marime

    security (focused on protecon of natural resources and crime at sea) and western goals

    of countering piracy?

    4. Is there a way to incenvize even greater cooperaon between marime industry,

    internaonal organizaons and regional governments?

    5. How can the internaonal community best support the Somali desire to control the

    Somali peoples marime resources?

    6. What role will marime stakeholders such as ag states, industry, import/exporng

    naons, and regional countries and organizaons play in the transion from Phase 1

    (Suppression) to Phase 2 (Long Term Investment)?

    7. How do we convince the internaonal community to remain invested in Somalia?

    8. How can we convince philanthropists, industry, and the Somali diaspora that the me is

    right to invest in Somalias future?

    For our part, I have personally commied to help develop some economic opportunies ashore through the

    creaon of Shuraako. This new iniave brings together prospecve investors with promising entrepreneurial

    projects in Somalia. I am also supporng eorts to create favorable condions for investment and to encourage

    the eecve governance of nancial instuons involved with Somali remiances. I invite other governments,philanthropists, business leaders, and members of the Somali diaspora to join us in invesng for a permanent

    soluon for the benet of the Somali people.

    Lets not kid ourselves: suppressing piracy and solving piracy are very dierent things. In the end, piracy can only

    eecvely be solved on shore. It is me for our eorts to move on ground in Somalia, providing hope in Somalia

    by providing opportunity. Only when Somali teenagers have greater access to jobs than to guns will they turn to

    work rather than piracy.

    It is not just piracy which hangs in the balance, but Somalia and part of humanity along with it. I am convinced

    that we will all be back at square one if we refuse to help, if we weaken our resolve, or if we fail in this mission.

    Sincerely,

    Marcel Arsenault

  • 5/26/2018 Economic Cost of Piracy 2012

    7/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    vi

  • 5/26/2018 Economic Cost of Piracy 2012

    8/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    1

    Executive Summary

    Ocan Bn Pac (OBP), a pjc f h On Eah Fuu funan (OEF) pa pn h

    annua an f h Ecnc C f Sa Pac 2012 (ECP 2012). Th a an, k h n

    f , cn nn paa, c ca an fun ha a pac c h a

    cn n $5.7 an $6.1 n n 2012. Ou a h u f xnv ach, uppn

    cnun f an an xnv au npnn pac xp. A n$5.7 an $6.1 n,

    h c f pac h a cun f aun $850 n, 12.6% f 2011.

    Total Cost of Somali Piracy in 2012$5.7-6.1billion

    Security Equipment& Guards29%

    Re-routing5%

    Insurance10%

    Ransoms & Recovery1%

    Prosecutions& ImprisonmentLess than 1%

    Military Operations19%

    Increased Speeds27%

    Labor8%

    Counter-piracyOrganizationsLess than 1%

    Wh 2011 a chaacz a hap p n Saa-a pac aack an hjackn a -a,

    2012 a ak h cnnuan f cnn pc uccfu p pac a a. Th pc

    ncu a a a nava pnc, upp h cnnuan f xn pca ana f h

    can fc. Wh a av pu a ap h can nav, ncun h k

    n an, h c aca h h nava pnc a a h ncu a a.Th a nu ccv pn pac a ak a cnnuan f cn pacc

    n n h h 4thRvn f h B Manan Pacc (BMP4), hch ap n Auu 2011.

    Th Hh Rk Aa aca h h a vn f BMP a an cnn huhu h a,

    hch c h an ha h an f Saa-a pa aack ha na ach h znh.

    A na fac an h p n Sa pac n 2012 a h nca pnc f a ua. In 2011,

    OBP a ha aun 30% f hp p pva a cu. In 2012 ha pcna a v

    upa 50%. Fna, h ana f Auac Infan S (AIS) aa ha cau u v u

    a f a-ca cca hppn ac n h Inan Ocan f 42,450 v an 66,612

    an p a.

    A nn av, h c f pac pp au 12.6% nc 2011. Hv, h a u,

    cn h h ncan p f p pac aack n h 2012, an ha h p ncn c

    h nnana cun ha n aaca.

    Th va ncan c van f 2012, a cpa h ncu un 2011:

    Increased per incident costs: Bn 2011 an 2012, h nu f ap an hjackn f

    uch aca han h c f can pac. Th a uana nca n h p

    ncn c f pac. In 2011, $28.6 n a pn p pa aack, an n 2012, ha nu

    189.0% $82.7 n.

  • 5/26/2018 Economic Cost of Piracy 2012

    9/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    2

    Increased cost of armed guards: Th

    pronounced increase in the cost of piracy

    ca a a u f h nca nu

    f a ua u pc chan

    v ann h HRA. Bn $1.15

    an $1.53 n a pn n a

    ua n 2012. In 2011, ha u a

    $530.6 n. Th v ncac a h u f an nca

    ppn f hp pn a

    ua (30% n 2011 an a a 50% n

    2012) a a a v a f h

    nu f cca an huh h

    HRA ach a. Cnn f ha a

    hca fac, h c f a

    ua nca 79.7% n 2012.

    Decreased cost of increased speeds: Th

    ac c ucn n n 2012

    ca f a ca n h c f fa

    an huh h HRA. In 2011, an

    a $2.7 n a pn n av

    pa p, u ha u a n

    $1.53 n n 2012. Th v

    $1.17 n a ca c

    f a cn n h ppn f hp

    an a av pa p a

    a a ucn n h aun hch h

    ava pn hp a av

    h cnca pa v. Th

    a a un Sa AISaa, hch a anaz cacua h

    a c an a a a u.

    Consistent rao of Recurring Costs vs.

    Investment: In 2011, a a

    ha appxa 99.5% f h a c

    f pac a pn n h cun c

    f v pcn. Th u n

    ak cna h n nv n

    pcun an un na an

    Sa capac uc pac. In p

    f h ucc achv a a n ucnpac aack an hjackn, h a

    an cnn h a a u.

    In 2012, 99.4% f a fun pn

    n cun uppn c, h h

    ann 0.6% nv n n-

    pvnn un.

    Impactson theSomali Economy

    Th a ECP n ncu cn -

    na pac f a pac uch a c n

    u an a. Hv, OBP u

    n ncu h pac f Sa pac n h S-

    a pp. I hu n fn ha h a

    f h vc f h an ccu-

    n f Saa h.

    Ma pac ha va nav c-

    nc pac n h Sa cn. Th

    nca f n cnan an h hpn

    Sa p, hch can c a uch a $1000

    p cnan. Th nca c a p

    vnu u -un f hpn nh-

    n p uch a h n Dju. Th, h

    ccnc pac a h accnc

    c f pc nan, hch nav ac h

    Sa pp a .

    In an h a-a pac, pac ha

    a nav pac n Sa hn, h fa -

    n u a h pac an a ha. Fna,

    Saa u f u vnu u apcv cu ha. Ma pac can

    cnu ha pcpn.

    A h cnc c f Sa pac fa h -

    pc h nnana cun, hu x-

    pc h cnc c h Sa pp

    fa a .

    An xap f h unuzan

    f Sa a uc

  • 5/26/2018 Economic Cost of Piracy 2012

    10/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    3

    Wha f a f ua f h nn f ach f h nn c ca cn:

    Ransoms and Recovery: In 2012, OBP a ha $31.75 n a n an pa

    Sa pa. Th pn an 80.1% cn n an pa f 2011, hn $159.62 n

    a pa. Th ucn n an u h nu f v capu an a n

    2012, a a a ava an han h pvu a.In an h an pan

    f, h ca c aca h pan an an cvn h v ncun h

    c f vn h an, aa cau h v h h, an h c f na,cnuan an an f a a 100% f h vau f h an hv,

    nn h a c aua h pan f an an cv f v $63.5 n

    n 2012.

    Military Operaons: Th ncna c f v pn (ncun cnnaanc aca

    an Unann Aa Vhc), v pcn achn, h anav u f nava

    pan, an SHADE (Sha Aan an Dcncn) n aun $1.09 n n

    2012. Th u pn a 14% ca f h $1.27 n p n 2011. Hv, f

    h ca c a a u f a cnvav h u cacua h c f UAV

    pn. Opana, h aj chan ha k pac n 2011 an 2012 a ca

    n nava a p h h nava n EUNAVFOR Opan Aaana, NATO

    Opan Ocan Sh, an h Cn Tak Fc CTF-151 an a cpnn nca n

    h a pv npnn p ncun Chna, Ina, Japan, Rua, an Suh Ka.

    Security equipment and guards: Th a c f cu qupn an ua n 2012 a a

    fa hn h an f $1.65 an $2.06 n. Th c f cu qupn f a a 11%,

    f aun $578.7 n n 2011 $514.6 n n 2012. Bcau f a a accpanc f a

    ua h Fa Sa an hp n an pa, h c f a ua uch

    aaca, up 79.7% f 2011 2012 hn kpn h nu f annua an huh h

    Inan Ocan cnan. Hv, u v a f annua an u n a aac

    nca, h n $1.15 an $1.53 n pn n a ua an n 2012.

    Re-roung: Shppn cpan pn $290.5 n -un an h Aaan Pnnua an Inanca a pp akn a c u huh h HRA. Wh B Manan Pacc

    cn ha v -u, appa a huh f hp n an pa a acua

    n . Th u pn n -un n 47.9% f h aun a n 2011. Hv, h

    ppn f hp ann aun h Hn f Afca ha ch -u n pp 10%. Th

    f h ucn h u f a chan n h, h f ank an uk ca

    cn cana f -un.

    Increased speed: In 2012, OBP a ha hppn cpan pn an xa $1.53 n n fu

    c aca h an a fa han pa p n pvn pa aack. Wh

    h a n chan n h nu cnan f nca p huh h HRA, h

    a c f h pacc pp 43.3% f 2011, h h a ana c a $2.7

    n. Th $1.17 n ca h a n au f a nn c cn cn,an h u f a ucn n h ppn f hp n huh h Hh Rk Aa a nca

    p an a p n h ava p f h hp an a fa han pa p. T

    cacua h c f nca p f 2012, an cn h p n cpanc, OBP uz

    a Auac Infan S (AIS) aa pv ExacEah an cn OBP f u n

    h p.

    Labor: Th a-a c aua a pac ncu h c f haza pa a

    a h c f pan afa h a v n h ha. Haza pa aca h h

  • 5/26/2018 Economic Cost of Piracy 2012

    11/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    4

    Innana Baann Fu an, hch a c n pacpan v h h

    u pa h ann h Hh Rk Aa. Th c a $471.6 n, up ncan

    f h $195.1 n a n 2011. Th nca h u f a v a ha

    70% f afa ann h HRA a n haza pa, a n IBF hp a

    aann, a pp h 30% au n 2011. Th v aupn ca a h u f

    cnvan h h An-Ean Gup, a an hp anan cpan. Haza pa a

    ac h v a f annua an n h Inan Ocan. Thu a f h v a

    c nca c a a u f v h a pp chan n a pacc.

    Prosecuons and imprisonment: In 2012, h c f pcun an pnn a $14.89 n,

    n 9.2% f h u p n 2011. Bkn n fuh, h c f pcun a $8.84

    n, n 24% f 2011, h h c f pnn nca 26.67% f 2011 $6.04

    n n 2012. Th ucn n pcun c appa a n u a ca n

    h nu f upc pcu, h h nca n h c f pnn c h n

    an aca h pnn a pa. M n pa pn n 2012 han

    a.

    Insurance: Th c f nuanc f 13.3%, f $634.9 n pn n 2011 $550.7 n

    pn n 2012. Th fa aua h nca pnc f pva a ua aa

    chan v an h un pu cun. Mv, u a hh nu f xpnvv ann h Suz Cana n 2012, h c aca h Wa Rk pu h.

    Cnn f ha chan n h cpn f h nu pp, h c f pac-a

    nuanc f 14.9%.

    Counter-piracy organizaons: Th c f vau cun-pac anzan, ann f Un

    Nan anc npnn NGO, a $24.08 n n 2012. Th u pn a 13%

    nca f h $21.3 n p n ECP 2011. Th anzan ncu n h cn a

    h Tu Fun Supp Inav f Sa Cun Pac h Ca f Saa, h Un

    Nan Oc f Du an C (UNODC), h Cnac Gup n Pac h Ca f Saa

    (CGCPS), h Dju C f Cnuc, h Un Nan Dvpn Pa Saa, EUCAP

    NESTOR, Rna An-Pac Pcun & Innc Cnan Cn (RAPPICC), h PaT

    Pjc, an OBP.

  • 5/26/2018 Economic Cost of Piracy 2012

    12/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    5

    Acknowledgements

    OBP ha an xp an akh hank f h uanc an up h pucan f h p.

    W u k hank Chan Sh f ExacEah, n n f h hp n cnn h AIS aa, u a f

    h nvaua aanc n nn h aa n ua f an han h xp n nu pacc

    an AIS ua. W u a k hank Rapha Kahn f Scu-Man f h nh n h ak

    f v f-pcn haa, a a Anuj Chpa a An-Ean Gup f pvn uch vaua

    nfan n h afan a ak. Onc aan, OBP u k hank Mcha F f C-Lv

    Ma Rk f cnnun pv u h h a n pac-a n.

    Fna, pca hank a u h Bac an Innana Ma Cunc

    (BIMCO), an pca Chf Shppn Ana P San, f cnucn

    uch a huh au f ECP 2012 nn. P n v ach f

    ECP 2012 nn c cn, qunn u aupn h aan an

    pvn upn u h hn h xpnc cun n fav f n

    . H k v h nh f h a f ECP 2012 a a a a

    h na puc.

  • 5/26/2018 Economic Cost of Piracy 2012

    13/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    6

    Acronyms

    AIS Auac Infan S

    AMISOM Afcan Unn Mn Saa

    ASIS PSC.4 Acan Sc f Infan Scnc Pva Scu Cpan Opan

    BIMCO Bac an Innana Ma Cunc

    BMPv4 B Manan Pacc (vn 4)CGPCS Cnac Gup n Pac h C f Saa

    DWT Da Wh Tnna

    EUNAVFOR Eupan Unn Nava Fc

    GCC Guf Cpan Cunc

    HRA Hh Rk Aa

    IAMSP Innana Acan f Ma Scu Pfna

    IMB Innana Ma Buau

    IMO Innana Ma Oanzan

    INTERPOL Innana Pc Oanzan

    ISO 28007 Innana Oanzan f Sanazan: 28007 Gun f PMSC

    TF Innana Tanp Wk Fan

    K&R Knap an Ran Inuanc

    LMA L Mak Acan

    MOU Manu f Unann

    MMSI Ma M Svc In

    MSC HOA Ma Scu Cn, Hn f Afca

    NATO Nh Aanc Ta Oanzan

    OBP Oceans Beyond Piracy

    OEF On Eah Fuu Funan

    PAG Pac Acn Gup

    PaT Pjc Pac an Ma T a a Chan f Ma Ta ScuPMSC Pva Ma Scu Cpan

    PCASP Pva Cnac A Scu Pnn

    RAPPICC Rna An-Pac Pcun & Innc Cnan Cn

    SAMI Scu Acan f h Ma Inu

    SHADE Sha Aan an Dcncn

    TFG Tanna Fa Gvnn

    UAV Unann Aa Vhc

    UN Un Nan

    UAE Un Aa Ea

    EUCAP NESTOR Eupan Unn Capac N

    UNCTAD Un Nan Cnfnc n Ta an Dvpn

    UNDP Un Nan Dvpn Pa

    UNODC Un Nan Oc f Du an C

    UNPOS Th Un Nan Pca Oc f Saa

    UNSCR Un Nan Scu Cunc Run

    VLCC V La Cu Ca

    VPD V Pcn Dachn

    WFP W F Pa

  • 5/26/2018 Economic Cost of Piracy 2012

    14/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    7

    Introduction

    Aun 2005, Sa pa an hjackn cca v ann na h Hn f Afca a an aan

    a. A cnan f aph an a ack f cnc ppun n h huan f Sa,

    f h un n, u a na n h nnana c. In kpn h a

    pac nnana chaac, a u nnana an v cun f akh ncun

    nvua vnn, na anzan, nvnna anzan, h hppn nu, an

    f cv c uh h c.

    Ov h nx va a, h akh p au ann f nava pa v f-

    pcn pcun pa capu a a n hp f uppn pa acv. F h va

    a f h nnana , h ua uk an unca. In fac, pa aack an hjackn

    a nca f 2005-2011, h h nu f hjackn pakn n 2010 an h nu f va

    aack pakn n 2011.

    I a n h pnnac a f pa hjackn 2010 ha OBP a Ecnc C f Pac p.

    In ha a, OBP u a f nf a an puc avaa nfan cncu ha

    a pac c h a cun n $7 an $12 n. In 2011, OBP hn h an

    an nca acc nu an vnn n, hch u n a na an u

    a f $6.6 - $6.9 n.

    Th a 2012, hv, a a a chan n h a pn aan a pac. Bn nava

    pan, pv nnana cnan, cnnu vanc f nu pacc, an nca

    u f pva a ua, h nu f hjackn pp 50% f 2011, an ap aack f

    ju v 70%. Thu h cnc, cpav n h pa f h cun f akh appa

    hav v h a h aan a pac u f h c anan pha an n an a f

    uc a Afcan pac nu.

    Th a Ecnc C f Pac p cnnu u upn h h vp nc h 2010

    p nc aan cacua h c f a pac h nnana cun, cncun ha pac

    c h a cn n $5.7 an $6.1 n n 2012.

    Thuh h nu f aack an hjackn n an h h c f pac va, h uk n

    n pv. Th cau h ncnc f pac f uch fa han h c f can h p.

    In fac, h c-p-hjackn an h c-p-ap 68.6% an 199.5%, pcv, n 2011 an

    2012. In 2011, $250.0 n a pn p uccfu hjackn. In 2012, ha nu $421.4 n.

  • 5/26/2018 Economic Cost of Piracy 2012

    15/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    8

    A n juna pu , h cpanc u ha h pa p f h px h

    hppn hu ncn.1

    Th van n u ha cnnun h cun appach cun-pac

    cnca unuana n ha a a n pha f uc pa aack an hjackn. I

    v aa f h-, c anan appach pac an a a n-, uana

    un. Bf unakn h c cacuan f 2012, an vv f h cp f h c u an h

    h u an h na u hu cn.

    Scope of Costs Studied

    ECP 2012 c f pac u ncu h c c f a pac f h ppcv

    f h nnana cun a a. Wh p, cn ppun c pv ha h a

    ncan an a aua a pac. Th u n cn nvn a h

    h nanc pa acn up. In cnn hch c ncu, ECP k av u cunn an

    n h f cnvav c a. Th cp f ECP un n a :

    First order: c a nuha f cn c cau h a pnpcca n pac ah han an nc a a u f pac. An xap f a c

    a an pan, h cn c ncu ucn n a u.

    Direct costs: c c a c ha u n x u f a pac. Th c f an,

    pac-a nuanc, cu qupn an ua, -un, nca p, xa a f,

    an pcun an pnn a a c c.

    Opportunity costs: a ncu n h cnc c f pac a ppun c, pv ha

    h a ncan an a aua a pac. Th c a h ha u x

    a f h pnc f pac, u u pu h pucv u. Th c f a

    pan an cun-pac anzan a h ppun c ncu n ECP na

    cacuan.

    No double counng: an f h c f pac a pa na f h pa ha ncu

    h c c ha pa cnu. ECP cnzan f ha fac an av u cunn

    huhu h p.

    From the perspecve of the internaonal community: a ac cnc uh ha n nvua

    c anh nc. ECP k a h c f a pac f h ppcv f h n

    nnana cun, xcun h an pa an h h p f pac. Th av

    c a ncu n h ua cacuan vn huh h cu a chaacz a nc

    f anh ppcv.

    Exclusion of pirates costs: pa acn up (PAG) n fu, f, fh a, an khat, anh pvn, cnuc h pan. Th c a n ncu.

    Conservave esmates: vn ncp nfan, hn n u, ECP n h f a

    cnvav c a.

    ECP ana cnuc h a f va an. F, ECP k pv nfan van

    akh an h puc a a an h cnc c f h a pn pac. A uch,

    a pn nfan n a a p h cn u f uc h an a a uana

  • 5/26/2018 Economic Cost of Piracy 2012

    16/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    9

    an qua un. Scn c an c n h pa a n qu f h pup.

    Scn, an h pn f cn c ha u f pac a pp h fc

    na p hu a a a f pcuan. Rah han accn accuac, h cn c

    a u n. Th, cn c, h n ncu n h a c cacuan, a c n

    h vau ca u huhu h pap phaz h panc h cun f akh.

    Fna, ECP n n na h c f pac n h n f h nnana cun. I an

    a cn upn c ncu h van akh, an cnvav c a c

    ha a.

    Th cn ncu n c an ppun c an xcu c ncu h pa

    hu nu vanc, accuac, an pacca u h cun f akh.

    Methodology

    Snc h a f ECP 2011, h hav n va u kn quanf h cnc c f pac

    h a cn. Each ha c f a n anzan h n aa f xp, an ach

    ha akn a n appach cacuan h c f pac.

    On pap, Th B, Th Fz an Hann Mu, a h c f pac anazn

    hppn cnac n h uk ak an cncu ha h fa u Sa pac n

    $0.9 n an $3.3 n.2Anh, Sa Bna an Inacua Manz-Zaz, u h av

    f a a h a-a c f pac a aun $24.5 n.3Fna, P.J. Mk k

    2010 aa an app a pa vau chan appach cncu ha pac c n $4.9 an $8.3 n

    n ha a.4OBP c a f h c f pac u, a ach k a h p n ach

    n, huh n ncpa, cncun.

    A a n h cn cncnn h cp f c u, OBP n cn c c an,

    h avaa, ppun c f a pac. Evn hn h c, h hca

    cu nhn n cacuan h c f Sa pac an chann. Th va aj f h aa hacu u cacua h c f Sa pac c h vnn an h hppn nu.

    Oca ac a pac a f an fa n, an kn aun ha an k v f

    u h.

    F h pa, u an c f anazn hun f p, n ac, an h pn

    uc, akn akh f nu, vnn, an cv c, an un px n h ap.

    Each cn f h pap c h h u an n an hca nc n

    a a pap an h a. Wh h xcpn f cn, h 2012 h v a

    ha u n 2011. Th n n cau h h u n 2011 a a na un n, u a

    a f app app cpan f c chan n 2011 an 2012.

    Th pa chan n h a funana n appach akn cacuan h c f -

    un an nca p. Th chan hav pv h accuac f u h an pv

    u nv nh n akh. Th uc f h pvn v 1 n AIS a

    cc ExacEah a an pv OBP f u n u ach. Th aa ha pvn

    xcpna ufu n vn ECP a a nv ana. Th a f h h u

    cacua h c f -un an nca p un n a n h cn.

    Anh aj chan n h 2011 an 2012 vn f ECP h a nu f cca

  • 5/26/2018 Economic Cost of Piracy 2012

    17/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    10

    an n h Hh Rk Aa ach a. La a, OBP u 42,450 a h a a. Thuh h u

    cu fun n va n uc, va pac xp ha u ha an a f 42,450

    h . Th a, h nucn f AIS aa ca h xp. A a u, hav v

    u a f h annua nu f cca an n h HRA 66,612. Y h u n u

    n v p nanc. F xap, cnnu u 42,450 cca an n h c f nuanc

    cn, a ha h apppa a f hp ha ak u Wa Rk an Knap an Ran

    Inuanc. Mv, u h vn a a f 6,575 cca an ujc -un. Th

    u pn n uk ca an ank ha pa huh h Suz Cana. Th chan a cvaanc n a nu f cn ha n c a chan n hav, u a u n accua

    c cacuan va.

    A aa, nv npu f a c a cnnu hn u h n hp f pucn

    ncan pc a n h fuu.

    First Order Costs of Somali Piracy

    1. The Cost ofRansoms and Associated Payments

    Ava ha uan uan: 316 a

    Ava an pa: $3,968,750.00

    Ta an pa: $31,750,000.00

    Th a f a h aca ppn a paachu capu h n

    f a n h Inan Ocan h v n h pac c

    a an cnc c. Th u p h fac ha, a a a, h

    pan f an u a n facn f h a cnc c f pac.

    In 2010 an 2011, h c f an cp ju v 2% f h a

    c f pac; n 2012, an a up han 1% f h a c.5

    Bh h nu an h ava vau f an hav pp n ach

    f u p. In 2010, 44 an pa an $238 n, h an

    ava f uh $5.4 n p an.6 In 2011, h nu f an

    pa a uc 31 an a $159.62 n, h h ava an

    pan fan $4.97 n.7 An n 2012, h nu f an pa

    pp aan n 8, avan $3.97 n an an $31.75

    n.8Th chan n a an c v n 2012 pn a

    pcpu 80% ucn f 2011 a.

    Th a va fac ha hav cnu h hap ucn n an pa, ncun nca nava

    pa, nhanc nnana cpan, ahnc nu pacc f v f-pcn,

    an h u f a ua aa chan hp. N n pc ha achv h ucn n a Afcan

    pac an. On a cnc, cpav, nnana up h ak f can a pac,

    h n h hh a an hn h EEZ f h a a f h Inan Ocan. T ha n, h Pac

    Ran Tak Fc a up f 14 nan upp 17 nu up a p h h

    a a f ach[n] a pn h pa a n n a p f an pan an hu

    aann h pacc f knappn f an.9

    Total Cost ofRansoms Paid

    2012

    $63.5Million

  • 5/26/2018 Economic Cost of Piracy 2012

    18/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    11

    Hv, p nan an

    pan n a a a h un.

    Onc a hjackn ak pac, h hppn

    cpan h afa a n

    h ha a n an x cu

    pn. On n han, hp n an

    pa n h ppua

    a cc f hjackn an paan pan. On h h, hppn

    cpan u a h can uc

    h huan c f pac nun h

    af a f h afa. Sp

    fun pa a an nc afa

    hav n akn n a huanaan

    pn. In u, huh h Pac Ran

    Tak Fc n a ha n

    n ach, h 80% ucn n

    an vau f 2011 2012 h

    ha h nnana cun

    vn a ha a.

    Ran n x n a vacuu; h a ua a funcn f h nu f uccfu hjackn. I

    hf unupn ha h nu f hjackn f 20 n 2012, a 28.5% ucn f h 28 hjackn

    v n 201110. Th ucn n ap aack a vn a h n 62 uch ap, n f

    189 n 2011. Dvpn n h ucc a hav n x. In 2012, h pa ucc a a

    24%, up ncan f h 13% p n 2011 u n f h 27% p n 201011.

    Y h ac cncnn pa ucc a a cpca u f pn. Mup pn

    cn, h cu f nuhn pa f na hn,12an an a nnc

    unp pa acv13a v uc h

    nu f p ap. Th, f cu, haa c c n h p vu acua pa

    ucc a. Du h pn cpcan, h

    ha can a ha n f phnna

    ccun. Eh h nnc unp pa

    aack nca fa aaca f 2011 2012,

    h pa h a acv pan n h

    HRA huh a n nu a aapn h

    pv nnana pn n nc 2010.14

    On aanc, h vnc u ha nca

    unpn n 2011 an 2012 h an

    v f h vaanc n ucc a n 2010 an

    2012.

    Y pac n a pu cnc phnnn, an

    huan c aun. In u 2011 p n ha

    h aun f pn nan an a n

    h , a n ha k cnnun. In 2011, k an ava f 178 a,15 aun x nh,

    f a an na an a hp a. Wh h nu f an pa ha ca

    aaca n h a a, h ava f an nan nca 312 a.16 S, h

    Ransoms Paid2010 - 2012

    2010 2011

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    $159.62Million

    $176Million

    2012

    $31.75Million

    Somali PiracyHijackings, Boardings, and Attempts

    2008 - 2012

    2008 2009 2010 2011 2012

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    220

    Hijackings Boardings Attempts

  • 5/26/2018 Economic Cost of Piracy 2012

    19/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    12

    nan ak uch n. In h ca f h Panaa-a Buk Ca,

    M/V Orna, h c an v h f 674 a. Whn a $600,000 an

    a na na n Oc 19, 2012, n 13 f h 19 c

    a; h h 6 an n capv.17

    Th M/V Ornaa n h n an uan ha u n a paa a

    f h c. ThAlbedo, a Maaa-a cnan hp, a hjack n

    Nv 25, 2010. A 20 nh n capv an a $1.2 n anpan, n 7 c a. 15 c an

    h.18Gna pakn, h n uan ha uan a n h

    ca f a - hp n, p ackn aqua nuanc cva.

    Un cn, h n nn hjackn an an ncn a h n

    nfau Iceberg I. Th Panaa-a RO/RO v an 24

    c hjack n Mach f 2010.19 Ov h cu f h na 3 a

    n capv, h c a p hav u v pchca an

    phca au. On c a a a hav c uc jupn va n Oc

    f 2010.20 Th ann c an h v f n a Dc, 2012 fn a cu

    pan aunch Punan Ma Pc Fc. Accn avaa uc, n an a pa.

    OBP cnnu ak a u appach an an an ha ack an accun f ach nvua

    an pa n 2012, h uch aa a avaa. Hv, hu n ha h an a n

    ca p. Rah, h u nvaa c f h pa hv h a a a au

    h an h na. Shp n an nuanc cpan, n h h han, n pf n

    a h vau puc cau uch cc cnacua qu an a a

    u f a a h h u ak f an cu h u- pa. B a

    f an pa n 2012:

    RANSOMS PAID IN 2012

    Ship Name Date Hijacked Date Released Days Held Ship Type Ransom Amount (millions)12

    Free Goddess February 7, 2012 October 11, 2012 247 Bulk Carrier $5.7

    M/T Liquid Velvet October 31, 2011 June 5, 2012 218 Chemical Tanker $4

    MV Olib G September 8, 2010 January 8, 2012 487 Chemical Tanker $3

    MT Fairchem Bogey September 20, 2011 January 12, 2012 114 Oil/Chemical Tanker $8

    MT Enrico levoli December 27, 2011 April 23, 2012 118 Oil/Chemical Tanker $9

    Leila February 15, 2012 April 11, 2012 56 Roll on, Roll off (RO/RO) $.25

    Albedo November 25, 2010 July 31, 2012 614 Container Ship $1.2

    Orna December 15, 2010 October 19, 2012 674 Bulk Carrier $.6

    TOTAL $31.75

    A n n u pvu p, h cah vau f h an n h n c c f a uccfu

    hjackn. Oh fac ncu h c f vn h an, aa cau h v h h,

    an h c f na, cnuan an an f.22Ana, accn h Cpu Shppn

    Cha, hp n an pa ncu n $10,000 an $50,000 n aa hu an ca p

    aack.23Fna, h a hh c aca h havn hp h u f vc. F xap, a a cha

    h a f $17,500 p a, a uk ca h ha f x nh cu c a uch a $3.15 n n

    unaz a an.24 In, accn Sphn Akn f Inc & C., h xc c f havn hp h

    178Days

    2011AverageHostageNegotiationTime

    312Days

    AverageHostageNeg

    otiationTime2012

  • 5/26/2018 Economic Cost of Piracy 2012

    20/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    13

    ha f nh n n pna a a a $20 n f a $4 n an. Each hp n an

    nuanc cpan hf u cnuc a ca c-n ana hn nan f a hp a.

    Th ncnv v n h an pc an a u a ana nan u cna h

    h hh c f havn hp u f vc, an h cna pac n h c.25

    A hjackn cu hf c a hppn cpan up v h vau f h an pa n aca

    c. Mv, cau h an f n pa an nuanc cpan, h aca c

    h huan an cnc a ha hp n an pa v an av h an panf. Wh ha a; hppn cpan hav a n ncnv kp an pan a a p.

    Th ak f an a, an pa a a kn aa f h n a. Cnn h ajc

    f an vau n a a h nanca ncnv unn h pa np, a a v

    h a . Fuh cpcan a h fac ha Sa pa a n unn n

    h pp n f h . Bn cuua nc, pan pa nanc, an na ack

    f un acun, Sa pa hav avn a nn n an an. On f h pa

    f ha h au nhn ha can an h cncu a an nan. Th

    pchca apc a anh a f cpcan h pc f nan a an.

    In u, h h c f h an f an h anca c aca h an pan a fac

    n h c f an n 2012. Bcau h an na fa an nuanc cpan, h $31.75

    n n acua pan uc f h a nuanc c. Rah han un h p

    a ha f v a pn n h an, v a pn n aca c, u a uch

    cnvav n--n a. Un h cacuan, h c f an n 2012 a $63.5 n, p vn

    n an c an anca c.

    Costs not included:As menoned above, industry analysts have cauoned that OBP has not represented the full

    value of costs associated with ransom payments. Some industry esmates place this number as high as ve mes

    the cost of the ransom payments themselves. However, OBP could not nd compelling and publically available

    evidence to support this higher rao. Therefore, OBP considered the true rao of ransom costs to associated

    costs to be too speculave, and including a higher rao than one-to-one would run counter to the conservave

    methodology used in this study.

    2. The Cost ofMilitary Operaons

    Ahuh h aj f p pac c a n nu,

    vnn ak a uana cnun h h

    aan a pac. Th a v f vnn

    c fa ha aca h a a

    pan h Inan Ocan. On an vn a

    un 2012, h n 21 an 30

    v pacpan n a Afcan cun-pac

    .26Th v pan an aa

    ha au 2 n qua aun n an haf

    h z f cnnna Eup.27Th pa funcn

    f h nava pn ncu: pana pa n h

    Guf f An an Sa an, annanc f h Innana

    Rcnz Tan C, cn huanaan a v, an pnn p aack.28

    Th hav n va nn vpn n h a fn n 2012. Th a a ucn n

    h a p h EU Opan Aaana (f 5-10 v n 2011 4-7 n 2012),29an NATO

    Opan Ocan Sh (f 4 n 2011 n 2 h n f 2012).30Th ucn ca an an

    nca n a p npnn nav f Chna, Ina, Japan, Rua, an Suh Ka, hch

    Total Cost ofMilitary Operations

    2012

    $1.09Billion

  • 5/26/2018 Economic Cost of Piracy 2012

    21/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    14

    han cpna f h ca Aaana an Ocan Sh

    p fc. Scn, Opan Ocan Sh an Opan

    Aaana ha h ana xn a, un h

    n f 2014.31Th, EUNAVFOR n a xn ncu

    Sa a an nna a, hch a h Eupan

    fc cnuc n h c a f n an. Th f

    h n ccu n Ma 15 an a a a a pa

    c a.32Th aack a upp h Sa TFGa a a UN Scu cunc un. EU NAVFOR n

    f n Sa , an n Sa nju.33

    Accn a L L uv, 64% f hppn

    pfna fav h an a pan.34

    F h pup f h u, pac-a a

    c ncu h anav u f h

    h nava n, h pan c f ufac

    v, h uvanc achn, an UAV,

    pnn c aca h v pcn achn,

    an h c f Sha Aan an Dcncn (SHADE) n. A hn , h a a

    c n 2012 a aun $1.09 n.

    A. Administrave Budgets of Naval Operaons

    Th a c u h anav u f h h nava pan EUNAVFOR

    Opan Aaana, NATO Opan Ocan Sh, an CTF-151. Each f h n ch

    cp f nana nava a, u ann h jn pan ha n anav c.

    F xap, Opan Aaana fun huh h Eupan Unn Exna Cn ATHENA

    nancn chan.35Th chan cv cn c uch a h pana haqua, h fc

    haqua na h ahp, canu vc, an anp.36Th a uaz ach

    f h h n, h a anav c, an h pa fun n 2012:

    Mission Description Costs and Contributing Nations

    European UnionOperation Atalanta

    EU NAVFOR-Operation Atalanta was launched on December 2008, in accordancewith an EU Council Joint Action. The mandate of the mission is to:

    Deter, prevent and repress piracy and armed robbery off the coast of Somalia Protect World Food Programme (WFP) vessels delivering aid to Somalia Protect the vessels contributing to the African Union Mission on Somalia

    (AMISOM) Protect vulnerable shipping off the Somali coast Contribute to the monitoring of shing activities around the Horn of Africa

    In 2012, Operation Atalantas mission was extended through December, 2014.

    Administrative Costs 2012: $11.4million,12contributing nations include:

    Belgium Croatia France Germany

    Greece Italy MontenegroNetherlands Norway SerbiaSpain Sweden Ukraine United

    Kingdom

    NATO OperationOcean Shield

    NATOs Operation Ocean Shield has been patrolling the waters off the Horn ofAfrica since August 2009. The mission is to contribute to international effor ts tocounter maritime piracy while participating in capacity building efforts in theregion.

    NATO Allies agreed on March 19, 2012 to extend Operation Ocean Shield foranother two years until the end of 2014.

    Administrative Costs 2012:~5.7million,13contributing nations include:

    Canada Denmark Greece ItalyNetherlands Norway PortugalSpain Turkey United Kingdom

    United States

    Total Cost ofMilitary Operations

    2011 & 2012

    2011

    .5Billion

    1Billion

    1.25Billion

    1.5Billion

    .25Billion

    2012

    $1.27Billion

    $1.09Billion

  • 5/26/2018 Economic Cost of Piracy 2012

    22/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    15

    Combined TaskForce

    CTF 151 is a multi-naval task force established in January 2009. It conductsoperations under a mission-based mandate of the Combined Maritime Forces(CMF). Its goal is geared toward deterrence, disruption and suppression of piracyoff of the coast of Somalia and the Gulf of Aden. The CTF headquarters is locatedin Bahrain.

    Administrative Costs 2012: ~5.7million,14contributing nations include:

    Australia Bahrain PakistanRepublic of Korea Singapore

    Turkey United Kingdom United States

    A , h a anav c f h h nava n a aun $22.8 n n 2012. Y h

    anav c f h n pa n cpan h va c. F xap, accn a n

    a pnav h h an annu, h EU NAVFOR pan c a

    c $1.96 n a a,40f hch $11.4 n cn anav c.41Th an f h

    cpanc ha h pana c f h n a aca un h pncp ha c h

    h fa. F xap, h fu an pnn c f a Danh ahp pan a pa f NATO Opan

    Ocan Sh u n h vnn f Dnak an, p h fac ha h Danh a n

    qun n u a pa f an nnana pan. Thu n h anav c c av

    a ha c. F ha an, h va aj f c ncu a a u h pn an

    pan f ufac an upp v.

    B. Cost of Naval Vessel Deployment

    In an h anav c c av, pn f ufac v an ann uvanc

    aca c h ncan c. T n h c f nava v pn, cn v

    fu c an a pan c. W ap a h c f puc avaa nfan

    uzn h cnvav nu. F xap, cun h p nu f v

    p n a a a, vn huh x k ha h acua ava a cna hh.

    Ana, n cn ana c aca h h an f h Inan Ocan h

    a cun f n an vc-va.

    T a h c aca h fu cnupn, cnv fu u n cn un f

    aun an p up a fu cnupn fu pc. W una cacua ach

    v fu cnupn pcca cau xac nfan a n avaa. Rah, u puc

    avaa nfan n can ca f vhc an u h ac a px f a vhc n a vn

    ca.42

    Vessel TypeAverage Number

    DeployedAverage Pre-Tax Fuel Price

    (per gallon)Adjusted* Daily Fuel

    Consumption (gallons/day)Total Annual Fuel

    Cost

    Frigate 8 $3.97 21,641* $206,191,189

    Destroyer 7 $3.97 49,091* $409,271,667

    Auxilary 2 $3.97 12,360* $29,441,520

    Patrol/Reconnaissance Aircraft 6 $3.97 6,335** $45,269,910

    Helicopter 4 $3.97 190*** $905,160

    TOTAL 27 89,617 $691,079,446

    *24 hours/day, 300 days/year **5 hours/day, 300 days/year ***4 hours/day, 300 days/year

    T cacua a pan c, an h an a nf cun h nvua h

    na kn f nava pan ha h nh pan c f a fa $1,564,400 h an

    ava f 230 a n a. F ha cacuan, au ha h pan c f a v a

    uh ppna h nu f afa aa an cncu ha h a pan c f a nava

    a n 2012 a $335,865,600.43

  • 5/26/2018 Economic Cost of Piracy 2012

    23/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    16

    Vessel TypeAverage Number

    DeployedSailors Aboard

    Frigate MonthlyCost

    Cost Adjustment Annual Operating Cost

    Frigate 8 230 $1,564,000 1.0000 $150,144,000

    Destroyer 7 280 $1,564,000 1.2174 $159,936,000

    Auxilary 2 121 $1,564,000 0.5261 $119,747,200

    Aircraft 6 11 $1,564,000 0.0478 $5,385,600

    Helicopter 4 2 $1,564,000 0.0087 $652,800

    TOTAL 27 $335,865,600

    C. Cost of UAV Deployment

    Anh c aca h a pn ha a unann aa vhc (UAV). Thuh

    a aa ha va nan p UAV n h cun-pac , cu kn h an

    UAV a n p f pac, a pp -a pup. I a cu kn h

    ppn f ach UAV n h ha ca cun-pac pan ah han anh

    pup.

    T kp u cacuan cnvav, au ha n n f ach knn UAV pn n h n

    u f pac an ha 50% f ha UAV h hu ca nn paca acv.

    Country Model Number of Units Hourly Cost Duration of Mission per day Total Operational Cost

    US Reaper 1 $1,456 12 $6,377,280

    US Robotic Helicopter 1 $1,804 4 $2,633,840

    US Global Hawk 1 $1,458 12 $6,386,040

    South Korea Hermes 450 1 $1,351 12 $5,917,380

    TOTAL $21,314,540

    Th a u f h a ncan cnvav han h u a a,44an hav

    u n a a UAV-a c f $21.31 n n 2012.

    D. Cost of Vessel Protecon Detachments

    In an pfn cun-pac pan f aa h n a, a a pn

    h pnn ua WFP an AMISOM hp pc h huanaan n f pa aack.

    Cun ha hav pv VPD ncu, u a n : Nhan, Ena, Gan an Fanc.45

    Ana, Fanc an Ukan pv v pcn ann 12 p f Uana v a VPD

    f AMISOM.46Th VPD pc an ava f 40 WFP an 32 AMISOM hp ann h HRA ach a.47

    Program Ships per year Cost per VPD team(of 10)

    Cost per VPD team(of 18)

    Total Cost VPD team(of 10)

    Total Cost VPD team(of 18)

    WFP 40 $151,667 $273,000 $6,066,680 $10,920,000

    AMISOM 32 $151,667 $273,000 $4,853,344 $8,736,000

    TOTAL $19,656,000 $19,656,000

    T cacua h c f a VPD, u h p c u f $273,000 f an 18-pn VPD f h

    Nhan an au ha h axu z f a VPD, h h nu a z n 10.48

  • 5/26/2018 Economic Cost of Piracy 2012

    24/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    17

    Ahuh h $273,000 u a appa hh hn cpa h $34,500-$46,000 p-an c f

    PCASP, h p-ua c a qu a. B a f xap, f an 11.5 a an h fu ua aa,

    h c p ua p a aun $1,000. B u cacuan, ha a an u p a VPD a a

    a f $1,318.84 p ua p a. Thu h an nc n c n PCASP an VPD c f h

    nu f ua p, n a nc n p-ua c.

    E. Cost of SHADE Meengs

    T cna h vau nava n n h Inan Ocan an Aaan Sa, nnana nav n h

    Sha Aan an Dcncn (SHADE) chan. Eah n 2008, SHADE a

    chan a a pvn cpan an cnan an h a fc pan n h n

    h cnn n nav n up an pvn fuu pa aack. Th n a

    h h Cn Ma Fc (CMF) an a h n Bahan v h nh.

    SHADE Meeting Meeting Date Meeting Location Attendees Total

    23rd Meeting March 16, 2012 Bahrain 145 $171,290

    24th Meeting June 17, 2012 Bahrain 145 $171,290

    25th Meeting September 18, 2012 Bahrain 110 $136,940

    TOTAL $479,520

    F h pup f h u a n apn cacua h c f h n hv. W

    n cn h c aca h ann, anan, haqua, pnn. In h ,

    n cn h av an accan c aca h qua p Bahan. Dun 2012,

    h 26thn chu f Dc a ppn un Janua f 2013. Thf, h n 3

    n h 110-145 an n 2012, cn a a f $479,520.

    F. Total Cost of Military Operaons

    Total Cost of Counter-Piracy Military EffortsTotal Administrative Budgets $22,800,000

    Total Cost Military Vessel $1,026,945,046

    Total Cost of UAVs $21,314,540

    Total VDP Costs $19,656,000

    Total Cost for SHADE Meetings $479,520

    TOTAL $1,091,195,106

    Takn h, h anav u f h h cun-pac n, h c f ufac v,

    cnnaanc aca, an UAV pn, h c f VPD, an xpn a h h SHADE

    n n 2012 aun $1.09 n. Appxa 94.5% f h a c a pn n ufac v

    an cnnaanc aca pn.

    A $1.09 n, h aun pn n a appa hav ca aun 14% f 2011.

    Hv, h p ca h u f an x cnvav appach UAV u a a u

    cn h h ava nu f v pan h Inan Ocan cnan f 2011, p p

    ha h nu a hav nca.49

  • 5/26/2018 Economic Cost of Piracy 2012

    25/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    18

    Costs not included:There are many costs associated with the deployment of surface naval vessels that could not

    be suciently isolated for this report. These costs include the cost of food, addional manning and supplemental

    training for the crew, port rights, logiscs for supplies, intel support and addional maintenance and ship

    availability costs. Michael Frodl of C-Level Marime Risks esmates that all of these costs together result in a cost

    of $200,000,000 per U.S. frigate per year. Thus if all incremental costs of a vessel deployment could be isolated

    and included in this calculaon, the total military cost could be as much as $3 billion.

    3. The Cost ofSecurity Equipment and Guards

    Th h van f h HRA av hp n a h n

    vc n pcn hv f pa. Such f-pcn

    c a a c. In 2012, hp n pn h n cu

    qupn han h n 2011 an ncan n a

    ua.

    A. Security Equipment

    B Manan Pacc f Pcn aan Saa BaPac, Vn 4 (BMP4) an h nu ana f v f-

    pcn.50Wh a cpanc a a a 80%,51h au

    hav pa a za n h ucn f uccfu pa aack.

    BMP4 cn h fn f-pcn au ha a

    h ac ha a k cv.52Exap f h f-

    pcn au ncu:

    Wachkpn an Enhanc Vanc

    Cn f Acc B, Accan

    an Machn Spac

    Wa Spa an Fa Mn

    Manuvn Pacc Upp Dck Lhn

    Saf Mu Pn an Ca

    Enhanc B Pcn

    Phca a (uch a az an c a

    Aa

    C Ccu Tvn

    Pcn f T an Equpn

    Pva Ma Scu Pnn

    SECURITY EQUIPMENTType ofEquipment

    Unit Cost perShip

    Units perYear

    Rate of Use(Low)

    Rate of Use(High)

    Total Cost (Low) Total Cost (High)

    Razor Wire $7,998.00 2.00 80% 80% $447,888,000.00 $447,888,000.00

    Water Cannons $118,755.00 .20 .25% .83% $2,078,212.50 $6,927,375.00

    Electried Barriers $39,585.00 .33 .75% 2.5% $3,463,687.50 $11,545,625.00

    Warning Signs $4.50 1.00 80% 80% $126,000.00 $126,000.00

    Acoustic Devices $21,000.00 .20 5% 15% $7,350,000.00 $22,050,000.00

    Sandbags $1,424.16 1.00 80% 80% $39,876,480.00 $39,876,480.00

    TOTAL $500,782,380.00 $528,413,480.00

    Total Cost ofSecurity Equipment & Guards

    2012

    $1.65to$2.06Billion

  • 5/26/2018 Economic Cost of Piracy 2012

    26/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    19

    Th h u cacua cu qupn

    c n 2012 uana a ha u n

    2011. W cn h ava p hp c f

    ach hp hann au, h a a hch ach

    un u hav pac, an h a

    pcna f hp pn ach au.

    Hv, h chan ha u nan va nca n h aun pn n cu

    qupn. S f h chan a, uch

    a an nca un pc f az 53and an

    ajun n h c f acuc vc. Oh

    chan a. F, a cnvan h a

    anufacu f c a n ha h

    c f h a ncan hh han

    a n 2011 ($39,585 a pp $1,529) an

    ha h a f u a ncan (0.75%-

    2.5% a pp 5%-15%). A, h c f a

    cannn a a h c ax. Th un,

    huh xpnv, a u a a ppn f hp ann h HRA an can ha an hp.

    Fna, a a fa ncan na ajun n h nu f hp ann h HRA ach a,

    a n Can Gup a ha h a aun 35,000 nua hp n h Inan Ocan ach a.54

    In a, h a an f $500.7 n $528.4 n pn a a 11% ca f 2011

    a f $530.8 n $626.5 n.

    B. Armed Guards

    An h ncan chan n 2012 a h nca u f a ua aa chan v.

    Th n accun f a a ppn f h ucn n p pa aack, a n hp pn

    a ua ha n uccfu aack a. Y h nca n un f a uac a an nca c.

    La a, a ha 25% f h hp ann h HRA p a a f a ua a a

    a f $50,000 p an.55Th u n a a c f $530.6 n pn n a cu n 2011.

    Dvpn n 2012 hav cau u aju u aupn.

    Ran h a f a ua u, a an f 38% 60%.56W f ha an a a f

    PCASP u f 50% h apppa f 2012. I pn h an f a uv an a

    pcca c a vnn uv an an nu pnav.57Rp f h c f a cu a

    a va, h a ann f $772.95 $2,569.73 p ua p a.58Excun h

    nu an axu a an avan h a a p-ua c f $1,115.94.59Th h

    a u n u .

    Anh cnan ha ca n pa a h nu f ua acua p hp n p

    an. BIMCO GUARDCON u ha a cu a hu cn f a a fu ua.60Y cncn

    hav n a ha hp n hav n pn a a n hp f achvn c avn.61

    Bcau h hch uch ucn a akn pac unca, pv a an f ava a

    z n h an fu ua p hp p an.

    Total Cost ofSecurity Equipment & Guards

    2011 & 2012

    2011

    1B

    illion

    1.5B

    illion

    2B

    illion

    .5B

    illion

    2012

    Estimated Cost Range

  • 5/26/2018 Economic Cost of Piracy 2012

    27/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    20

    Total Transits Rate ofPCASP

    Ships w/PCASP

    Cost per Transit(3 guard average)

    Cost per Transit(4 guard average)

    TOTAL(low)

    TOTAL(high)

    66,612 50% 33306 $34,500.00 $46,000.00 $1,149,057,000.00 $1,532,076,000.00

    Fuh an h c f pva cu h v a f h nu f an huh h Inan

    Ocan ach a, hch u n an a ha n $1.15 an $1.53 n a pn n a ua

    n 2012. Cnn f ha hca chan, h c f PCASP aa nca 79.7% f 2011.

    C. Armed Guard Accreditaon

    Th na apc f cu qupn a c ha aca h a ua accan. Ou

    h an vua unchan f a a. W cacua h ava c f hp n h

    Scu Acan f h Ma Inu (SAMI), h a f uch anzan, an up ha h

    nu f .62

    SAMI Members Cost/Member TOTAL COST

    186 $3,947.40 $734,216.40

    Th a c f $734,216.40 pn a 152.6% nca f 2011, u ha nca a n

    xpan h 144.7% nca n SAMI hp.

    Hv, h c f cu ua accan n ncu n h na c a. Th c f

    accan, k h c aca h unnn a PMSC, a pa n h cn an a hf

    capu n h $38,500-$51,333 p-an f ncu av. Rah, SAMI hp ncu a an

    xap f h a nu ha hav n pn h ha f a pac.

    In u, h a c f cu qupn an ua n 2012 a n $1.65 an $2.06 n.

    Costs not included:Costs associated with controlling access to the bridge, upper deck lighng, safe muster pointsand citadels, alarms, closed circuit television, and the protecon of tools and equipment were not included in

    this secon. This is because much, if not all, of the hardware necessary to engage in these types of vessel self-

    protecon was likely present aboard most merchant vessels irrespecve of marime piracy.

    4. The Cost ofRe-Roung

    In an hp hann au, anh acc hp n an

    pa u av pa aack h -un f hp

    huh h HRA. BMP4 a ha h hppn cpan

    pn pv uanc h v Ma n

    h cn un huh h Hh Rk Aa an

    a f h pac ha.63Th cn cn h

    c aca h v -un av pa

    aack n h HRA.

    In u 2010 p, c ha

    a hn h av cn pacc

    f avn h HRA ah ann aun h Cap f G

    Total Cost ofRe-Routing

    2012

    $290.5 Million

  • 5/26/2018 Economic Cost of Piracy 2012

    28/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    21

    Hp ah han huh h Suz Cana, n h R Sa, an huh h Guf f An an h HRA.64In

    2011, hv, fun ha h nca pnc f a ua, pa xpan aa f pan,

    an nca vnu f h Suz Cana a u ha h p f xnv -un a n n

    ccun.65Th v aa f un aun h Cap f G Hp appa hav a huh 2012,

    a h pnc f a ua ha nca, pa aack an pa huhu h Inan Ocan, an

    Suz Cana vnu an vua unchan f 2011.66

    Th a p, k a a, hf h a f f -un hchan v an na h Aaan Pnnua an h Inan can, ah han akn h h

    p u aun h Hn f Afca an ah huh h HRA.

    Ou h f cacuan h c f -un a uana a ha u n 2011. W n

    cn ana cha an fu c f ank an uk ca, a cnanhp a capa f

    uch fa p an -u a a ncan a han ank an uk ca. On ncan

    nc n u h ha ah han un nu a av a h pcna f hp

    -un an h Inan ca, u AIS aa pv ExacEah. B xann fu paa n

    an h c u f h Hn f Afca S Lanka an cpan h u h f a 2008

    u ha cca hppn pan n 2003 an 2004 (avaa n Appnx D), fun ha

    49.6% f chan v na n -un pacc. Na, unnn h a cacuan un AIS aa

    f 2011 u n 60% f hp -un n ha a, xac a n h upp an un

    a n 2011 ECP f 50% an 70%.

    Th fn cha uaz u cacuan:

    Vessel Type Vessel ClassAdditional distance from

    re-routing (nm)Additional time from

    re-routing (days)

    Number of vesselsthrough the Suez

    Canal

    Proportion of vesselsre-routing

    Tanker Handysize 760.045 2.64 1819.5 49.61%Tanker Aframax 760.045 2.64 1819.5 49.61%

    Bulker Handymax 760.045 2.64 1468 49.61%Bulker Panamax 760.045 2.64 1468 49.61%

    Vessel Type Vessel ClassAdditional Charter Cost (per

    voyage)Additional Fuel Cost (per

    voyage)Total Annual Charter

    CostTotal Annual Fuel

    Cost

    Tanker Handysize $33,779.78 $46,651.56 $30,491,449.84 $42,110,216.80Tanker Aframax $44,335.96 $79,200.00 $40,020,027.92 $71,490,192.84Bulker Handymax $25,070.93 $44,000.91 $18,258,525.67 $32,044,750.41

    Bulker Panamax $25,070.93 $51,952.88 $18,258,525.67 $37,835,970.36$290,509,659.51

    Thu n 2012, appxa $290,509,659.51 a pn n -un. Th u pn a ncan

    ca f ha p n 2011, u n a a aun f ha ca a h u f a uc

    ppn f hp -un. Th a u a vn u h h n hp ha

    pa huh h Suz Cana a pp a hp n h Inan Ocan cn cana f

    -un. Th cau n hp ha n h HRA huh h Guf f An a fac h h chc f

    hh ak a c u huh h HRA -u an h Inan ca.

  • 5/26/2018 Economic Cost of Piracy 2012

    29/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    22

    Costs not included: OBP only considered re-roung opons originang or terminang in the Gulf of Aden. Other

    potenal re-roung opons such as transits around the Cape of Good Hope, or other variaons within the HRA

    could not be isolated to piracy causes, and therefore were not considered.

    5. The Cost ofIncreased Speeds

    Th cun vn f h nu-vp B Manan Pacc

    (BMP4) c h pacc f ncan p n h HRA a n f h

    cv a fa a pa aack.67In fac, BMP4 cn ha

    a hp av a a p f a a 18 kn hn ann h HRA. Th

    vnc upp h cnan cau, k h pn

    f a ua, n hp akn v 18 kn ha v n capu

    pa.68Y h fnv au, k a h, c a a c hp

    n an pa. Th cn cn h c f nca p

    huh h HRA un a Auac Infan S (AIS) aa

    an f h ExacEah Cpan.

    Accn nu ana, h c f nca p can ncan n h cun a f hh fu pc. F xap,

    a ha n v a cu ca (VLCC) ha an h HRA

    un Oc 2012 an a 17.9 kn, 5.1 kn av a

    p f 12.8 kn, ncu $88,681.74 n ana c p a.69

    Such pcc aa pn a avaa a h u f a aa an

    f ExacEah. AIS an auac ackn u f nfn an can

    v un cnc na ha ncu nfan n hp p, p, an pn. A AIS a

    n f h HRA v a xn a p n h 2011 an 2012 cc ExacEah a an

    cn OBP f u n h p. Th aa a cc ap hppn ac un h u

    an n nn an, a a h n p n h an.

    Thuh a fu xpanan f h h u cacua h c f nca p h hppn

    cun avaa n Appnx E, a f accun f h a ach u cncun n . F,

    paa h AIS a cnann hp p an nn f h cnann p v un

    an pn. Thn, un aca a, c-fnc h f a MMSI nu, a

    cn n u n AIS ann, ha ha hp p, p v un, an hp nn

    f ach cca an f h HRA n h xn a n qun. T nz h aa, cn

    hp p, hp h, an p v un un a f n c cuv pv ana a BIMCO.

    Th cuv a hp p hu fu cnupn f ach f h n hp ca n qun.

    T n h fu c pcca aua pac, h pa cun p ha acan.

    T h, u h u f a 2012 qua p uv cnuc RS Pau Mak nn haVLCC ank cun a an ava a f 12.8 kn an ha cnanhp avn a an ava

    f 15.1 kn.70Bcau uk an ank a a a p, 12.8 kn a u f h pa p

    f uk ca. F ach hp h aa a avaa, k h nc n h p p

    an h pa p, an cacua h c f ha nc un h c cuv pv BIMCO. Th

    pna u a a f:

    Total Cost ofIncreased Speed

    2012

    10 15

    0

    52 0$1.53 Billion

  • 5/26/2018 Economic Cost of Piracy 2012

    30/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    23

    Tankers Containers Bulkers

    Raw Number 909 1719 1719

    Raw Number (Fast) 520 720 1106

    % Above Optimal 57.21% 41.88% 64.34%

    Cost per Fast Ship $25,895.92 $29,750.05 $63,247.25

    Aggregate cost $13,465,880.34 $21,420,035.38 $69,951,457.59

    Bcau u aa n cn f 16 a u f h a, h aa ha annuaz accun f a

    cca an hn h HRA, hch u n h fn a:

    Tankers Containers Bulkers

    Number 20736.5625 39214.6875 39214.6875

    # Above Optimal 11862.5 16425 25230.625

    % Fast 57.21% 41.88% 64.34%

    Cost per Fast Ship $25,895.92 $29,750.05 $63,247.25

    Aggregate cost $307,190,395.33 $488,644,557.20 $1,595,767,626.22

    I a hav c appan ha h nu f p uk ca nca h nu f p

    cnanhp. Th u h fac ha h AIS a n nuh n h p f

    hp, nnn nc n h ca u n va n fu c. T cpna f

    h cnc, cacua a ca hp a f h cnanhp an pf h a cacuan

    a cn a f h a uk ca. Thn, un nfan f h Suz Tan Auh,71

    an ppn f 27.59%, 34.66%, an 37.76% ank, uk, an cnanhp, pcv. Th

    u n h fn c a:

    Ship TypeProportion in

    Suez

    Number ofTransits in

    HRA

    ProportionSteaming Faster

    than Optimal

    NumberSteaming Faster

    than Optimal

    Average Costper Fast-

    Steaming Ship

    Subtotal

    Tanker 27.59% 16539.6 57.21% 9461.64837 $25,895.92 $245,018,124.62

    Container 37.76% 22635.4 41.88% 9480.80252 $29,750.05 $282,054,340.94

    Bulker 34.66% 20776.1 64.34% 13367.316 $63,247.25 $845,445,964.25

    TOTALS 59951.25 32309.7669 $1,372,518,429.81

    Thu f 100% f hp an h HRA h h AIS anpn unnn, h 59,951 v an u

    hav u n $1.37 n n c u nca p n 2012. Hv, huh BMP4 a ha

    cn ha AIS n huhu h Hh Rk Aa, a ha h Ma ha h cn

    ch h AIS f h v ha u nca h hp vuna.72Cnvan h h

    faa h hp ackn an pn pacc ha u v ha appxa 75% f hp pan h HRA h h AIS anpn ch n, u ha a can ppn aun 10% ca h

    MMSI nu, nn up nu p hp p an. A akn h ajun, cncu

    ha 66,612 an huh h HRA hav u n $1,525,020,477.56 n fu c f fa han pa

    an n 2012.

    Dp h n xac cncun, h AIS aa an an pfc au f nu an

    pacc n h HRA. Th u f va an. F, AIS pa n nnna fa

    npu n h anpn, ncun fa up MMSI nu an an ca n.

  • 5/26/2018 Economic Cost of Piracy 2012

    31/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    24

    Scn, ac u u n fau nfan. Fna, u p ch n a

    huh h HRA h h AIS anpn ch n. Mv, h a vaa uch a cun, n,

    an hu cnn ha ac a hp fu cnupn a ha a n capu n u aa.

    Nnh, u u a n n h u pvu a ha $2.7 n a pn n nca p n

    2011, pca hn h up aan u nn ha h h ppn f hp pn an h aun

    hch h p pp f 2011 2012. Mv, u nn ha h a v 65,000 annua an

    huh h Inan Ocan ach a (a pp h 42,450 a n 2011) n n h a vn h faa h v ackn an pn pacc. Thu p h hcn nhn n u

    h, u u fa hn ana accpa a ha hav n n xp n

    h .

    In an pvn nfan n h c f nca p, h a AIS aa u n h cn

    h h n n hp a cp h BMP4 cnan ha hp ann h

    HRA hu av a a p f a a 18 kn, a a h c f h u an n nn

    an n an pacc.

    Th cha ak paa u a pn au BMP cpanc. Th ha n a hp a

    qua a a a 18 kn. In 2011 an 2012, h ppn f ank an a av 18 kn

    a n 5% an 6%, h h ppn f h ca hp avn a h BMP cn p

    a av 20%. Scn, h ca n h ppn f hp ha uc h p n 2012 a uch

    pnunc n h ca hp han ank, h h f n a 24.3% ucn an h a

    n a 6.3% ucn.

    Proportion Steaming at or Above 18 knots by Year

    Tankers Other Cargo Ships All Ships

    2011 5.75% 27.21% 20.02%

    2012 5.39% 20.59% 15.33%

    Ana, uch ha n a au h pac f nn an n a pac.73Hv h

    fn cha u ha h ana vaan hav na pac n an pacc:

    Proportion Steaming at or Above 18 knots, Monsoons Versus Interim Periods

    Tankers Other Cargo Ships All Ships

    2011 Monsoons 4.64% 26.77% 19.19%

    2011 Interims 6.65% 27.56% 20.67%

    2012 Monsoons 5.01% 21.01% 15.41%

    2012 Interims 5.78% 20.18% 15.26%

    Thuhu 2011 an 2012, h ppn f hp an a av 18 kn chan v n

    pn nc n h u an n nn an an h n p nh an. In h pa a, h pnunc c ha h nn an ha n an

    a a 2% nca n ank an a av 18 kn un 2011. Th ava v chan n

    nn an an n p a un 1%, an f hp av a av 18 kn un

    n p han nn an n 2012. Th n a ha h u an n nn an

    hav n pac n a pac; n a ha h appa hav n pac n cca

    an pacc.

  • 5/26/2018 Economic Cost of Piracy 2012

    32/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    25

    In u, h a AIS aa u n h cn u ha hp n an pa pn $1.53 n n

    nca p n 2012, cn ha ank a a a a av 18 kn han h ca f

    hp, an a h cncun ha h cn an n f nn an ha pac n cca

    an pacc.

    Costs not included: According to the Cyprus Shipping Chamber, merchant vessels undergoing a pirate aack

    incur between $3,000 and $6,000 in addional fuel costs per aack74. These costs stem from the increased

    fuel required to engage in evasive maneuvers. Using the Cyprus Shipping Chamber esmaon, these evasivemeasures cost between $246,000 and $492,000 in 2012.

    6. The Cost ofLabor

    6 afa k

    383 afa h ha

    Anh c chan ha ha c a a u f

    ca pa acv h Hn f Afca h

    ucn n h nu f ha h an k

    pa. Wh n afa f cu h a pa n an, h 82% ucn n pa-a

    ha faa n f 34 n 2011 6 n 201275

    a n ha a ucn n vnc a a n

    ccun. Ana, h nu f ha h

    pa pp f 1,118 383 n 2011 an

    2012, a uch c 66% ucn.76

    Thuh h huan c f pac afa cann an hu n n,77h cn fcu n n

    h cnc c aca h afa a, na haza pa an a pa un capu.

    A. Hazard Pay

    Th a vau cnacua ch ha hav n vp cpna afa f h ana

    k f ann h a Afcan HRA. Th f h a fak a upn n h Innana

    Tanp Wk Fan (ITF) an hp n huh h Innana Baann Fu (IBF).78Th

    a ap nnana an un h ITF/IBF fak a ha []h Safa ha pa a

    nu qua 100% f h ac a f h uan f h hp a n a Wak Opan aa ujc

    a nu f 5 a pa.79Th ITF cp f 600,000 afa , an f h an h

    Inan Ocan an Aaan Sa.80

    Scn, h vnn f h Phppn qu ha a cnac h Fpn afa pv f haza

    pa f 200% f a an n hn ann h HRA.81Th cpnan ch a ca h

    Phppn Ova Epn Anan n 2009,

    82

    v n 2011,

    83

    an ca n 2012.

    84

    Bn160,000 an 250,000 f h appxa 1.37 n afa a f h Phppn.85

    In an h a ca ch c av, an h afan cnac cnan a haza

    pa pvn. Accn a an chan , a a afa a unnz an c un a

    ccv aann an (CBA). Mv, a a f h CBA f h ITF a n pvn f

    100% ana haza pa.

    Total Cost of

    Labor2012 $471.6 Million

  • 5/26/2018 Economic Cost of Piracy 2012

    33/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    26

    La a p n cn h haza pa cn f Fpn vnn an ITF aann knn

    pa n h HRA, cncun ha 30% f afa cv haza pa.86Hv, cnvan h

    Anuj Chpa an h a An-Ean Shp Manan hav u v ha a ncan

    upa. Thuh h cu f u nvan, an a p unann f h hch

    afa a n haza pa. In fac, 90% f Inan afa, 95% f Fpn afa, 90% f S Lankan

    afa, 80% f Ukanan afa, 60% f Pakan afa, 95% f Maaan afa, an 95% f

    Innan afa cv haza pa.87Th n c n k cv haza pa a h

    f Chna, Rua, Mana an h Afcan cnnn. F h u, cncu ha a a 70% fafa ann h a Afcan HRA a n cv haza pa.88

    Hazard Pay in 2012

    Hazard pay per transit through the HRA $10,000

    Transits per year through the HRA 66,612

    Percentage of vessels disbursing hazard pay 70%

    Hazard pay in 2012 due to E. African HRA $466,284,000

    Th h vn a a a h cncn h c p an aua haza pa. La

    a, k an ava a p-hp a f $2,100 an up h 7 a ha ak n ava an h HRA. F h aupn, cncu ha haza pa aun $14,700 p an.89

    Hv, fuh cun h An-Ean hav u n a ucn n ha p-an a. Th

    ncan vaan n h c z an an uan ha u n a haza pa c ann f

    $3,000 $19,000 p an, h an ava c f aun $10,000.90Th $10,000 u u f

    2012 cacuan. Aan, u v a f h nu f annua an n h Inan Ocan fuh

    v h a c f haza pa upa.

    A , a $10,000 p an an h 70% f v ncun haza pa c, h a c f a Afcan

    pac-a haza pa n 2012 a $466,284,000.

    B. Capvity Pay

    Th nau f pac-a a c ncu h hppn nu chan n h vn f a uccfu

    hjackn. An a uccfu pa aack, n h a av na v a pp cn c

    f pac. Hv, n h vn f a uccfu hjackn, afa a p n pu pucv u

    ah.

    F xap, f h ava a c p an $10,000 f hp h n u haza pa an

    $20,000 f h hp ha , n h ana $10,000 p an n haza pa a c f pac an a

    hjackn. Onc a hp akn, hv, 100% f h a c aua pac f h uan f h

    ha uan. Cpan u pa h afa a hu cvn an f h n f h a.

    Merchant Vessel # of Hostages Days in 2012 Months in 2012 Monthly Labor Rate SubtotalMV Free Goddess 21 247 8.10 $84,000.00 $680,262.30

    MT Liquid Velvet 22 157 5.15 $88,000.00 $452,983.61

    MV Obib G 18 8 0.26 $72,000.00 $18,885.25

    MT Fairchem Bogey 21 12 0.39 $84,000.00 $33,049.18

    MT Enricco Livoli 18 114 3.74 $72,000.00 $269,114.75

    MV Leila 15 56 1.84 $60,000.00 $110,163.93

  • 5/26/2018 Economic Cost of Piracy 2012

    34/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    27

    MV Albedo 23 213 6.98 $92,000.00 $642,491.80

    MV Orna 10 293 9.61 $40,000.00 $384,262.30

    MT Royal Grace 22 304 9.97 $88,000.00 $877,114.75

    MT Smyrni 26 235 7.70 $104,000.00 $801,311.48

    Base Wages $4,269,639.34

    Hazard Pay (35%) $1,046,061.64TOTAL $5,315,700.98

    Rah han un h p cacuan ju c cacua capv c, c u a n,

    accua fuan. A a n h pcn ucn, haza pa n u a a,

    h a pa h pa c. Thu h p-haza pa a c acua han c

    h haza pa, a p-haza pa a c ncu h a aa f hh ank c aa

    h v. Nnh, a c ca h z f h c. W hf k an ava nh

    p-haza pa a c f $80,000 f 20 c, aju h nh a c accun f chan n c

    z, an cacua ua a n c z an uan f capu. W hn up h a a c

    35% cacua ana haza pa.91

    Th cn au ha n a-ca chan v (a pp hn v an ca h)

    cnnu pa afa a n h vn f a ha uan.92I fuh au ha, n accanc h

    h pcn cn n haza pa, ha 70% f chan v u haza pa afa ann h

    HRA. Un ha cacuan, h a c f capv pa a $5,315,701 n 2012.

    Bn haza pa an capv pa, h a c a n 2012 a $471,599,701. Ahuh h u

    pn a ncan nca f ha p n 2011, h nca a u n pv

    h a pp a c nca. Cnn f h hca chan, a c

    an vua unchan n 2011 an 2012.

    Costs not included: Administrave costs associated with negoang and administering hazard pay and capvity

    pay are not included in this secon.

    7. The Cost ofProsecuon and Imprisonment

    Pac h c f unva jucn un

    nnana a, ppa u communis hoss

    omnium(h cn n f a) Cc n h

    cnu B.C.93Tu nnana chaac, a a 40

    cun nvv n capun, nvan, n,

    an pnn pa n 2012.94Th c f n pa

    a hav pp h pa a, u h c au

    pnn nca. Bf vn n 2012 c fac,

    a nu f vpn n h aa f pcun an

    pnn a h nnn f cnx.

    In a a p, cu Jack Lan ppa f a pcaz xaa

    Sa cu a n Auha, Tanzana upc pa.95Accn a n

    Sca Gna Rp puh n 2012, ha a ha n uppan n

    nvvn nnana a c an-pac cu n Saa, Sch,

    Total Cost ofProsecutions

    & Imprisonment2012$14.89

    Million

  • 5/26/2018 Economic Cost of Piracy 2012

    35/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    28

    Kna, Mauu an Tanzana.96Innana aanc c f h Un Nan an M Sa,

    hch upp vau n f c pcun f ann pnn cnucn pn, h

    ca ca cnucn h acua juca pc.97Th pjc xpc c $30.49 n n

    a 2012 an -2014, f hch $9.38 n ha aa n cnu.98

    Th UNODC ha akn h a n h capac-un n panaz h na a

    a.99T ha n, h UNODC ha n kn h Kna, Sch, Mauu an Tanzana a

    h pacua p f cnucn fa an cn pac a an nun af an cu pnnf pac pn, h pvn a ac v f aanc n Saan an Punan.100Th

    pa k a ncan h capac pcu pa hn h n, a pp

    anfn h h Un Sa h Eupan Unn f c pcun.

    Country Pirates Held Completed Trials # of Suspects Region

    Comoros 6 0 0 Africa

    Kenya 164 2 11 Africa

    Madagascar 12 1 14 Africa

    Maldives 41 0 0 Africa

    Oman 32 2 20 AfricaSeychelles 124 4 37 Africa

    Somalia & Puntland 308 unknown unknown Africa

    Somaliland 94 unknown unknown Africa

    Tanzania 12 0 0 Africa

    UAE 10 1 10 Africa

    Yemen 129 1 4 Africa

    India 119 unknown unknown Asia

    Korea 5 0 0 Asia

    Malaysia 7 1 7 Asia

    Belgium 2 2 2 Europe & Japan

    France 22 1 6 Europe & Japan

    Germany 10 1 10 Europe & Japan

    Italy 20 2 20 Europe & Japan

    Japan 4 0 0 Europe & Japan

    Netherlands 33 1 9 Europe & Japan

    Spain 8 0 0 Europe & Japan

    USA 28 2 2 North America

    TOTAL 1190 21 152

    In 2012, h c a pcun a $8.84 n, n 24% f h $11.66 n p n

    2011.101A a f 2012 p pcun c pn n Eup, hch h 7 pac a a an

    ava c f $1,174,484.86 ach.102I hu n, hv, ha Knan an Sch pcun

    a n ncu n h a, a h c a n h UNODC an capu n h cn cncnn

    cun-pac anzan.103Sa, Sa an Inan pcun c a un-accun f u h

    unavaa f van aa.

  • 5/26/2018 Economic Cost of Piracy 2012

    36/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    29

    RegionPirateTrials

    Average Costper Trial

    Total Trial CostPirates

    Imprisoned

    Cost peryear of

    imprisonment

    TotalImprisonment

    Cost

    Total RegionalCost in 2012

    Africa 5 $227.97 $1,139.86 644 $730.00 $470,120.00 $471,259.86

    Asia 1 $7,313.96 $7,313.96 131 $375.51 $49,191.81 $56,505.77

    Europe 7 $1,174,484.86 $8,221,394.00 99 $47,793.60 $4,731,566.40 $12,952,960.40

    N. America 2 $307,355.00 $614,710.00 28 $28,284.00 $791,952.00 $1,406,662.00

    TOTAL 16 $8,844,557.82 902 $6,042,830.21 $14,887,388.03

    Ova, h ucn n pcun c appa u p a ca n h nu f upc

    pcu. Excun h pcu Saa an Ina, 232 pa pcu n 2011, an 152

    pcu n 2012.

    Wh pnn c a cncn, u h an unchan

    f 2011. W an h h nu f pa h a p h UNODC.104

    W hn uac h h Kna an Sch, paa an

    n, an up ach n an h a ava

    pnn c f ha n. F ha cacuan, cncu ha $6.04

    n a pn n ncacan n 2012. Th u, up 26.67% f

    2011, u an nca n h nu f pa an n

    Eup. In 2011, 72 pa vn nnc n Eup a a c f

    $3.47 n; n 2012, h 99 pa vn nnc a a c f

    $4.73 n.

    Th ucn n pcun c ccun an an nca n

    pnn c hhh an pan pc cnan. Wh

    pa pcun a av h- ppn, pnn

    a ah n n. In 2012, nnc an f 2 a f,

    h an ava nnc f 8.66 a.105

    An a p-a anfan, a cn pcu a upc pa cu

    pna c a c, n- cn pn ha

    pa. Snn an acn upn an pn cnvc pa

    n h n hf paaun. Sch, Saa, Kna, an

    Mauu hav aa n uch an.106

    Th anh u a nncn ha n ac c p ,

    u nnh h nnn, a k ha pcan n h uv an n c f

    pac a. Th u a ack f cnnc n nncn ha, accn a 2012 pap n Eun

    Knvch n haf f OBP, u vaanc n au an nncn n n cun an

    appa una h v f h pa nvua acn.107In an pan qun f

    qu an fnan accu f h a c, h v vaanc n nncn a na

    h n c f pac pcun va. 108

    I cu pc h fuu f pcun an pnn c cau h a n fc

    ha cu v fuu c h upa an na. On fac vn up fuu c h pv

    juca ana n aha n na a k Sch, Kna, Mauu, an Tanzana h

    h hp f h UNODC. Gna pakn, pv qua c a an nca pc, an pcun

    a n xcpn. Anh pcuav fac vn pcun an pnn c upa u

    Total Cost of

    Prosecutions& Imprisonment2011 & 2012

    2011

    10Million

    15Million

    20Million

    5Million

    2012

  • 5/26/2018 Economic Cost of Piracy 2012

    37/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    30

    a ucn n h cach an a a, a a a f h can a Afcan pac.109Rucn

    h cach an a a u nca u n an nca a f pcun, h a cpnn

    nca n c. Incan h nu f pac pcun an h qua f h pcun u

    c vpn, u h u c a a c.

    Th a a va fac ha cu v fuu c na. F, a h aa f Nh Acan

    an Eupan pcun an a na una u c. Evn aun ha pv

    juca ana u nca h p-pcun c n na a, h a u ncan han h Acan an Eupan cunpa. Scn, h UNODC an h U.S. Sa

    Dpan hav nv n v cnfncn qupn ha cu aca h c f n

    appaanc n h n.110Th f chnca cnc hu uh a v un. Fna,

    h ccn an han f vnc cn an huh h nn f INTERPOL

    an h fhcn k f RAPPICC.111Th, h cnc hu v h c f a pac

    pcun vn fa.

    PIRACYPROSECUTIONSIN 2012

    3

    2 TRIALS

    4 TRIALS

    UNKNOWN # OF TRIALS

    0 TRIALS IN 2012(But held t rials in 2011)

    1 TRIAL

    TOTAL COSTOFTRIAL

    & IMPRISONMENT

    AFRICA........................$471,259.86

    ASIA............................$56,505.77

    EUROPE.......................$12,952,960.40N. AMERICA.................$1,406,662.00

    $14.89Million

    UNITED STATES

    COMOROS

    KENYA

    TANZANIA

    MADAGASCAR

    MALDIVES

    OMAN INDIAUAE

    ITALY

    GERMANY

    NETHERLANDS

    BELGIUM

    FRANCE

    SPAIN

    YEMEN

    SEYCHELLES

    SOMALIA & PUNTLANDSOMALILAND

    MALAYSIAKOREA

    JAPAN

    In h n, h cvn f h juca apc f h a h aan a pac hu au

    h p-pcun c, h nava cach an a a, an h n c ha u f

    pcua . Sp a cun una pv h c.

    Costs not included:The cost of prosecuons and imprisonment paid for by the United Naons is not included in

    this secon. This is because those costs are captured in the secon covering counter-piracy organizaons.

  • 5/26/2018 Economic Cost of Piracy 2012

    38/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    31

    8. The Cost ofPiracy-Related Insurance

    Pac h ca f Saa cnnu p a k hp ann h

    Hh Rk Aa (HRA), an hp-n cnnu nu hv aan

    ha k. Lk a cpan kn a k, hp n pa pu

    nuanc cpan cv nanca n h ca f an accn.

    Th n a pac ha an nca n nuanc c cn

    h nca k u a p hjackn. Th cn k cacuanuanc c ha can au a pac.

    Cacuan h c f pac-a nuanc an a cu an

    cnnu a ak a a n 2011. Thuh h npu cv h nuanc

    nu a a ha pvn ua, h a a h pa f pa-

    a nuanc cnnu unaa. Dnan h p n pcpn

    a a 2012 L L ak uv nn ha 53% f pnn v

    ha h nuanc nu a pn f pac, h 24% an

    h ha an an h ann 23% unu.112Th cpanc

    unu a h pva an nvuaz nau f nuanc cnac, an h ha can

    n ac h nfana an.

    Th pa f f pac-a nuanc a Wa Rk an

    Knap an Ran (K&R) nuanc. Ahuh p ha h

    ha f pac ha u n nca hu an ca pu,

    uch a c nca f x u a cn c f

    pac u h cp f h u.113

    War Risk Insurance: h f f nuanc pa cv

    h c f nju h c an aa h v h

    avn n h a k aa.114In an h c,

    a k pan a cv h pan f an.115

    A hp ann h a k aa u pucha a k nuanc.

    Th a k aa n h L Mak Acan (LMA)

    Jn Wa C n Lnn.116Wh h n xcpn f h

    n f Dju xcun an, h pac-a a k aa

    an unchan n 2012.117

    Th a h a f h nu uc h a k pu.

    Th huh a n ca nu avaa hp-n h

    n a pac a ca. Th cn an ana cun

    f h pucha f K&R nuanc. Th h a cun avaa

    h h p a ua n fn f h v. In an,

    cpanc h h a nu anan pacc

    (BMP4), hch ha n an pan u nu

    pa, fqun a qun f unn.118

    Kidnap and Ransom Insurance:K&R pc a paa f a k pc an cv h an

    pan an h ana c aca h ha nan, ncun cnuan f,

    a xpn, an h a c.119

    Total Cost ofWar Risk and K&R

    Insurance2012

    $550.7Million

    War Risk InsuranceK&R Insurance

    Total Cost ofWar Risk and K&R

    Insurance2011 & 2012

    2011

    200Million

    300Million

    400Million

    500Million

    100Million

    2012

  • 5/26/2018 Economic Cost of Piracy 2012

    39/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    32

    In nn ach hp K&R pu, nu cn fac uch a p, fa hh (ncun

    hh an n aa un va), an hh h a a ua pn n a.120

    Ba pakn, h n n pu a chan ha n x. Th nuanc nu n a nh,

    an a a nvua na. A a u, ana an cna hav p a ca

    un f h ca n p aack, h h hav pc ac-h-a a nca u

    h cnnu k an qun au unpn.121Thu u an a f 0.10% f h hu

    vau f a k nuanc, an h $12,500 an $7,500 an f K&R cv app an anhh an fa hp an unchan. A unchan a u aupn an a k nuanc ha

    100% f nu hp-n cv a 50% n ca nu an ha 50% f nu hp-n cv a 50%

    cun f puchan K&R cv.

    On hn ha ha can chan, hv, h nca pnc f PCASP n a chan v.

    Th ha u n a a cun avaa hp pn a ua, a a an nca n h

    ppn f hp qua cv uch a cun.122La a, a ha appxa 25% f h

    hp ann h HRA cv a 30% a k cun f h u f a ua.123Th a a

    ha 50% f hp cv a 40% cun f h u f a ua. Ou a f 50% a h n

    f nu a ha n 50% an 60% f a hp ann h a Afcan HRA p a

    ua.124

    In h, h h a n cun h nu pnav an uz n h 2011 p

    an a unchan, h nca pnc f a ua ha a a aua nc n

    h va c f nuanc.

    In 2012, u cacuan u ha h hppn nu pn aun $550.7 n n a k an K&R

    nuanc, n 13.26% f h $634.9 n p n 2011.125Ahuh u a v a f

    66,612 f h nu f v ann h Inan Ocan huhu h f h p, cnnu

    u h a f ECP 2011 ha aun 42,450 v an h Inan Ocan f h pup f

    nuanc. Th cau , huh n a, cca v ann h HRA pucha pac-a

    nuanc. Th fn a uaz u nn:

    WAR RISK INSURANCEShip Type # in HRA Hull Value

    Tanker 9,171 $41,000,000.00

    LNG 2,016 $26,000,000.00

    Carrier 7,442 $30,333,333.33

    General Cargo 3,397 $23,666,666.67

    Container Ships 15,310 $23,666,666.67

    RO/RO Ships 688 $23,666,666.67

    Car Carriers 2,525 $23,666,666.67Passenger Ships 217 $23,666,666.67

    Other 1,701 $23,666,666.67

  • 5/26/2018 Economic Cost of Piracy 2012

    40/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    33

    Group 1(No Claims Only)

    25% of Ships

    Group 2(No Claims/K&R)

    25% of Ships

    Group 3(No Claims/PCASP)

    25% of Ships

    Group 4(No Claims/K&R/PCASP)

    25% of Ships

    Ship Type # of Ships Rate per Ship # of Ships Rate per Ship # of Ships Rate per Ship # of Ships Rate per Ship

    Tanker 2293 $20,500.00 2293 $10,250.00 2293 $12,300.00 2293 $6,150.00

    LNG 504 $13,000.00 504 $6,500.00 504 $7,800.00 504 $3,900.00

    Carrier 1860 $15,166.67 1860 $7,583.33 1860 $9,100.00 1860 $4,550.00

    General Cargo 849 $11,833.33 849 $5,916.67 849 $7,100.00 849 $3,550.00

    ContainerShips

    3827 $11,833.33 3827 $5,916.67 3827 $7,100.00 3827 $3,550.00

    RO/RO Ships 172 $11,833.33 172 $5,916.67 172 $7,100.00 172 $3,550.00

    Car Carriers 631 $11,833.33 631 $5,916.67 631 $7,100.00 631 $3,550.00

    PassengerShips

    54 $11,833.33 54 $5,916.67 54 $7,100.00 54 $3,550.00

    Other 425 $11,833.33 425 $5,916.67 425 $7,100.00 425 $3,550.00

    TOTAL COST OFWAR RISK INSURANCE:$365,499,212.53

    K&R INSURANCE

    Ship Type # in HRA K&R Rate % w/K&R Subtotal

    Tanker 9,171 $12,500.00 50% $57,317,597.25

    LNG 2,016 $12,500.00 50% $12,600,735.86

    Carrier 7,442 $12,500.00 50% $46,512,466.25

    General Cargo 3,397 $12,500.00 50% $21,232,239.93

    Container Ships 15,310 $7,500.00 50% $57,412,102.77

    RO/RO Ships 688 $7,500.00 50% $2,580,000.67Car Carriers 2,525 $7,500.00 50% $9,469,453.00

    Passenger Ships 217 $12,500.00 50% $1,354,579.11

    Other 1,701 $10,000.00 50% $8,505,496.71

    TOTAL $216,984,671.53

    Th p-an cn n h c f pac-a nuanc vn kn n h f chan n

    h akup f hp ann h HRA n 2011 an 2012 ha v v up h c f nuanc.

    Accn UNCTAD 2011 Review of Marime Transport, h ava hu vau f a hp ann h

    Suz Cana (u px f h p f h a 42,467126an huh h HRA ach a) a $24.0

    n.

    127

    Y n UNCTAD 2012 Review of Marime Transport, h ava hu vau a a a $26.6n, pnn a 10.8% nca.128

    In an h na nca n hu vau, h ppn f xpnv hp xpnv n

    a ncan hh n 2012 han 2011. F xap, ank, hch a h xpnv f a h hp

    ann h Suz, pn 19.7% f a ac n 2011 an 21.6% f h a ac n 2012. Sa,

    uk an cn ca, h nx xpnv ca f hp, cnu 15.6% f a ac n 2011 an

    17.52% n 2012. Cna h h h a f h xpnv hp uch a na ca hp, cnan

    hp, pan hp an h hp hch a pcv ppna ca f 11.04%, 5.33%,

  • 5/26/2018 Economic Cost of Piracy 2012

    41/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    34

    8.17%, an 22.91% n 2011 an 2012. Bh f h fac pu upa pu n h c f pac-

    a nuanc. Th upa pu a han cun a h nca u f PCASP.

    In fac, a cnn f h chan n h cpn f chan v n h HRA, h ca n

    nuanc c n 2011 an 2012 u a fu 14.9%, a pp h 13.3% ucn v.129

    Th c f pac-a nuanc pn a c ca f 2011. Th p an nca n

    h a vau f h nu pp n h HRA. Th va cn u pa n h nca uf PCASP aa chan v. If h na n n p ap an hjackn cnnu,

    hu xpc h pac-a nuanc c cnnu can n h fuu.130

    Costs not included: The cost of hull insurance is not included in the secon on piracy-related insurance because

    hull insurance is considered to be a normal cost of the shipping industry. Depending on the specic policy in

    queson, piracy may have a direct eect on hull insurance premiums. However, OBP was not able to conclusively

    discern what proporon of any given hull insurance premium is directly aributable to piracy risk.

    9. The Cost of Counter-Piracy Organizaons

    In an h fun cnu c vnn an nu, vacun-pac anzan v a f h u h h aan

    a pac. S f h anzan a IGO pfn h ca

    u an h a NGO pan a nfa , u a f h pv

    vaua npu h a aan pac, an a f h ncu c h

    n . Th cn c h n f ach cun-pac anzan,

    n van vpn n 2012, an a h annua a pn n

    ach anzan.

    A. Trust Fund to Support Iniaves of States to Counter Piracy o

    the Coast of Somalia (Trust Fund)

    Total Contribution to the Trust Fund, 2012:$5.83 million

    GermanyItalyQatarSpain

    $2.5 million

    Japan $2 million

    UAE $1 million

    Norway ~$333,333

    Wh a ana f h f-x a cpn h Cnac Gup n Pac h Ca f

    Saa (CGPCS), h Tu Fun a ah n Janua 27, 2010 h Un Nan Sca Gna,Ban K Mn. Th Tu Fun ha upp h nav f h Un Nan n, na h Un

    Nan Dvpn Pa (UNDP), Un Nan Oc n Du an C (UNODC) an h Un

    Nan Pca Oc f Saa (UNPOS). Th jcv f h Fun hp fa h xpn aca

    h pcun f upc pa, a a h acv a pnn h Cnac Gup

    jcv an can pac n a apc.131 A h CGPCS 13thPna Sn, pacpan n

    ha h h ha n a ucn n h nu f aack an hjackn n 2012, h unn cau

    f pac an n pac. Bcau h an a a h fa an v, CGPCS akh n,

    nn funn an pana upp nca.132

    Total Cost ofCounter-PiracyOrganizations

    2012

    $24.08 Million

  • 5/26/2018 Economic Cost of Piracy 2012

    42/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon2013

    35

    Th Tu Fun ha appv n-vn pjc a a vau f $11.95 n, ncun nav a a

    nhnn na cna juc an a nfcn h pac n Saa, Kna an h

    Sch.133A 10thn n Mach 28, 2012, h Tu Fun Ba appv n pjc vau

    a $1.37 n. Th n pjc upp h a f pa n Kna, Mauu, Sch an h

    Un Rpuc f Tanzana an pv fuh aanc h UNODC Pac Pn Tanf Pa.134

    A f Dc 2012, $16.5 n ha n cnu h Tu Fun, f hch $12.12 n ha n

    u.135

    Hv, h c au h Tu Fun n h u n a n h xpnu a n a vn

    a. Rah, a n h nan cv n a vn a. 136In 2012, Gan, Ia, an Qaa na

    a cn $2.5 n,137Japan na $2 n,138h Un Aa Ea na $1 n,139and

    Na na appxa $333,333.140Th n h a c au h Tu Fun $5.83

    n n 2012.

    B.

    Of a h Un Nan anc can pac, h UNODC pn h , h n an uc,n h u. In fac, h UNODC Cun Pac Pa (CPP) cv 67% f h Tu Fun a

    acan.141Thuh h UNODC na ana a a Kna n pcun an pnn pa, ha

    n xn cv v ana na nan: Sch, Mauu, Tanzana, Mav an Saa.142

    Total Financial Contribution to UNODC, 2012: $6.74 million

    Australia $2 million

    Denmark ~$4.62 million

    Germany $120,000

    Th CPP upp h na an an pcu pac upc n accanc h nnana

    ana f juc, h u f a, an pc f huan h. T achv h a, h UNODC CPPfcu n h fn aa:

    An fa an cn a n na cn h un a uana cna juc capac

    a pac an h u c

    Pvn huan an cu pnn n Saa upan Sa pn an facan p-

    a anf

    Suppn pc, ca an pn ua ann a a pvn nca qupn an

    ca aanc a a f h p nu a h ana f fan an

    cnc143

    Th va u f h UNODC CPP $55 n.144

    Hv, h cn n cn n cnuna n 2012, hch aun $6.74 n, h $2 n cn f Auaa,145appxa $4.62

    n f Dnak,146an $120,000 f Gan.147

    C.

    Total Cost of Contact Group Meetings, 2012: $765,242

    15 total meetings: $765,242(12 working group meetings and 3 CGPCS plenary meetings were

    held during 2012)

  • 5/26/2018 Economic Cost of Piracy 2012

    43/80

    THE ECONOMICCOST OF SOMALI PIRACY, 2012

    a project of One Earth Future Foundaon 2013

    36

    Th CGPCS a ah n Janua 14, 2009 fn UN Scu Cunc Run 1851. I a faca h cun an cnan f acn an a an anzan upp pac h ca f Saa.148Th nnana fu k a h pvnn f pac h Saca huh a u-akh pc ncun pnav f nu, vnn, nnanaanzan, an cv c. Th CGPCS ha v Wkn Gup ca pcc u f pacnc:

    Working Group 1: cha h Un Kn, WG1 pn f cv pan nava

    cnan an un juca, pna an a capac n na a. WG1 h p a a h IMO haqua n Lnn.

    Working Group 2: cha Dnak, WG2 pv a an juca uanc h CGPCS, Saan anzan n a apc a cun-pac. WG2 na h p a nCpnhan.

    Working Group 3:cuncha h Rpuc f Ka, WG3 fcu n nu-pcc uuch a v f-pcn. Th up c p a; Wahnn DC an Lnn hh c f 2012.

    Working Group 4: cha Ep, WG4 cncna n puc pac, pn aan f hp f pac h Sa ca. Th up c n 2012, n n NY an h cn

    n n h UAE.

    Working Group 5: cha Ia, WG5 k a nfn an upn h nanca nkuz pa. Th up h un 2012, c n Lnn an nc n R.

    Th uk f pac a funn aua h CGPCS u h Tu Fun an capu av.Hv, h a ana c aca h ann h 15 CGPCS n h n 2012. Tav anaccan c a h n n ncu n h a, u h p n c va pnn nn uan, z, an nnana av qu. Th a uaz u nn:

    Category Meeting Date Meeting Location Duration Attendees % Intl Travel Meeting Total

    WG 1

    3/21/2012 London 1 150 25 $34,848

    7/12/2012 London 1 150 25 $34,84811/14/2012 London 1 150 25 $34,848

    WG 23/5/2012 Copenhagen 1 100 95 $76,986

    9/17-18/2012 Copenhagen 2 100 95 $101,686

    WG 32/28/2012 Washington, DC 1 100 35 $51,290

    9/25/2012 London 1 150 25 $34,848

    WG 43/28/2012 New York 1 150 25 $42,9086/26/2012 Dubai 1 50 95 $42,458

    WG 53/5/2012 Lo