eco wise
DESCRIPTION
Presentation on the new concept of waste managementTRANSCRIPT
![Page 1: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/1.jpg)
INTRODUCTION
We are introducing the business of Waste Management on a public-private patnership with a view to take on the severe problem of solid waste disposal in the city of Pune and to recycle the wastes.
![Page 2: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/2.jpg)
THE TEAM
Abhijeet Talapatra 9301
Nikhat Aland 9303
Kavita Bansode 9304
Ruchita Bhave 9305
![Page 3: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/3.jpg)
WASTE MANAGEMENT ??!!Collection , Processing , Recycle or Disposal and
Monitoring waste materials.Term relates to materials produced by human
activity and undertaken to reduce effects of health , environment and aesthetics.
Waste management differs in Urban –Rural and Residential- Industrial areas.
Residential-Industrial waste disposal is the responsibility of the local Municipal Corporation.
![Page 4: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/4.jpg)
OVERVIEW…
Problem of consumption and disposal as a result of modern life style.
Garbage disposal mostly unorganised in the country.
Indians mostly not educated about waste segregation unlike western countries.
Pune city produces about 12000 T of solid waste out of which about 2000 T are residential wastes.
As of now the garbage is dumped at Urali-Devachi village on the outskirts of the city.
![Page 5: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/5.jpg)
…OVERVIEW
Unplanned landfills in the village creating problems of air and ground water pollution .
Only 7% of solid wastes finds its way into proper recycling agencies of the Pune Municipal Corporation.
About 300 MT segregated for being used as manure.
85% of the wastes are unutilised being simply dumped creating environmental issues.
![Page 6: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/6.jpg)
PLANT LOCATION
BEYOND HADAPSAR, PUNE
![Page 7: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/7.jpg)
BASIS AND PRESUMPTIONS
* It is assumed that the unit will operate on the basis for 300 working days in a year.
* The salary and wages for staff and labour has been taken into consideration on the basis of prevailing market rates.
* The costs of land, construction charges, machinery and equipment, raw materials, and consumables, other contingent expenses etc. indicated in the scheme are based on the prices, prevailing at the time.
![Page 8: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/8.jpg)
SCOPEProvide comprehensive Waste Management
solutions for primarily Residential Solid Waste disposal.
Process include collection, segregation, transportation and assistance to recycle industry.
Consultancy services.All practices in accordance with MSW 2000 rules.Organic wastes converted into composts and
inorganic wastes further sent to recycle plants.
![Page 9: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/9.jpg)
IMPLEMENTATION SCHEDULE
Sl. No. Activity Period Starting
Period Completion
1. Survey of collection of data in respect of
garbage generation and tie ups with local Municipal Corporation
1day to 2nd month
2. Arrangement for money 2nd to 3rd
3. Preparation of project report and registration
2nd to 3rd
4. Development of Site and construction of plant
3rd to 4th
7. Trial production 5th monthonwards
![Page 10: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/10.jpg)
COMPETITIVE ADVANTAGE
Waste Management with separate segregation and treatment site.
Treat Waste in environmental friendly manner.
Others dump non-useful material I open on the road side or burn it as it is.
![Page 11: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/11.jpg)
COMPETITORS
Standard Agencies
13/14 Kumar Palace,
2408 East Street, Pune – 411001.Crushaal Food Waste Disposal
A 1/ Kanchanban,
Senapati Bapat Road,
Pune - 411016
![Page 12: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/12.jpg)
FUTURE ACTIVITIES
Increase Area of Operation within the city.
Install Anaerobic Sewage treatment plant.
Waste to energy ( W2E ) conversion with Biogas
plants with a view to reduce landfills by 100%.
![Page 13: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/13.jpg)
Operational Plan
![Page 14: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/14.jpg)
ADVANTAGES OF AAC BLOCKS..
Lighter in weight, can be transported in pellet mode.
Handling cost is less.
Less requirement of Steel in construction.
Heat resistant.
Less water absorption.
Factory made , can be delivered in time as per order.
![Page 15: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/15.jpg)
..ADVANTAGES OF AAC BLOCKS
Assured quality control.
Not affected by salinity.
Smooth surface, plastering not required.
Due to large size of block for same weight
construction cost is less.
No collateral damage due to earthquake.
![Page 16: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/16.jpg)
Operational Plan
PLANT PARAMETERS Capacity, Bricks /Month. 15,600 cu
mtrNo. of Shifts / day 2Working days / Yr. 300Land Area 5 Acre
![Page 17: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/17.jpg)
Production Plan
First operation-50% of Capacity
( 7800 cu mtr)
Production in batches
Second year operation- 60% of capacity
![Page 18: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/18.jpg)
RESOURCESRAW MATERIAL
Fly ash 55 %Lime 20 %Cement 20%Gypsum 4.5 %Aluminium Powder 0.5 %
![Page 19: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/19.jpg)
Procurement of raw materials
MATERIAL AGENCY LOCATION
FLY ASH THERMAL POWER PLANT
EKLAHAR, MAHARASHTRA
CEMENT ( 43 GRADE ) EX TRADE ACC FACTORY
GYPSUM -DO- RAJASTHAN
LIME -DO- RAJASTHAN
ALUMINIUM POWDER -DO- LOCAL
WATER OWN BORE WELL LOCAL
![Page 20: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/20.jpg)
Prototype production started six months before on a small scale.
Found to be a successful venture.
TRIAL PRODUCTION
![Page 21: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/21.jpg)
Proposed Plant layout
Office
Production
Drying
Raw material storage
![Page 22: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/22.jpg)
TECHNOLOGY
Technology essentially of German origin.All equipments of German design being
manufactured in China.Technology agreements would be entered
with respect to guarantee about the equipment performance , with equipment suppliers.
![Page 23: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/23.jpg)
PROCESS
FINAL MIXINGINITIAL MIXINGWATER + FLY ASH
CHURNING
BAKINGWINCHED PRODUCT CUTTING
MOULDING
![Page 24: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/24.jpg)
MANUFACTURING PROCESS
The process involves wet mixing of fly ash and water. The mixture is then churned over time to a required
density. The mixture is fed with lime, gypsum, cement and
aluminium powder in a complex mixing process. The mixture is then put in a mould where it comes in
contact with the accelerating agent to swell up. The swelled mixture is dried and cut to desired sized
blocks. The entire blocks on trolleys is baked in the autoclave
and the blocks are ready .
![Page 25: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/25.jpg)
COMPARISIONFLY ASH BLOCK
PCC BLOCK NORMAL CLAY BRICK
Uniform pleasing colour like cement
Uniform pleasing colour like cement
Varying colour as per soil
Uniform in shape and smooth in finish
Uniform in shape and rough in finish.
Uneven shape as hand made
Dense composition Medium composition. Lightly bonded
No plastering required Plastering required Plastering required
Lighter in weight Heavier in weight Heavier in weight
Compressive strength is around 50 Kg/cm2
Compressive strength is around 100 Kg/cm2
Compressive strength is around 35 Kg/cm2
Less porous More porous More porous
Heat absorbent. Less heat absorbent. Less heat absorbent.
Water absorption 6-12% Water absorption 20-25% Water absorption 20-25%
![Page 26: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/26.jpg)
STRATEGIC PLAN
![Page 27: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/27.jpg)
Demand And Supply
Currently the demand for bricks much higher than the supply.
D & S gap is 250 billion bricks per annumRaw material used for regular red bricks is
limited.Strategic step:
– Introducing Fly Ash Bricks to reduce demand and supply gap.
– Subsidies and orders from govt.
![Page 28: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/28.jpg)
Competitive strategies
Advantageous features.Uniform in size, shapeHigh strengthLight in weightGood resistance to salinity and termiteWater absorption is less
![Page 29: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/29.jpg)
Pricing Strategies
Penetration
– Initially Rs. 53 per block.
– Later concession for large quantity buying.
![Page 30: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/30.jpg)
Promotional Strategies
– Discounts on large buying.
– Aggressive Selling.
– Trade promotion.
– Publicity.
– Large volume of institutional sales.
![Page 31: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/31.jpg)
MARKETING PLAN
![Page 32: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/32.jpg)
Existing Market Scenario..
Market is dominated by red bricks.Current estimates show the gap between
demand and supply of bricks to be of the order of 250 billion bricks per annum.
It is new product to the market.This project helps to reduce environment
pollution.
![Page 33: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/33.jpg)
..Existing Market Scenario
Use of this bricks results in savings in
construction cost by 25%
These bricks are already getting popular
with reputed Govt. agencies and builders.
![Page 34: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/34.jpg)
Sales Target
We are going to sale 7800 cu mtr per month
( 50 % of capacity ) of blocks in the first year.
In second year the sales target will be 60% of
established capacity.
![Page 35: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/35.jpg)
STP Strategy
Target Market–Builders–Consultants–Architects–Govt.
Positioning –Positioned as Environmental promoting
product.
![Page 36: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/36.jpg)
STP Strategy Segmentation
– Based on the geographic location• As our plant will be located in Nashik area, initial
emphasis to tap the market in Maharashtra.• Subsequent spread to neighbouring states of Gujarat,
Andhra Pradesh and Madhya Pradesh.
Name of Company:– Flash Blocks Pvt Ltd.
Product Brand Name:– Flash AAC Blocks
![Page 37: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/37.jpg)
Existing UsersHiranandani Group , Mumbai.Raheja Builders, Mumbai.VASCON, Pune.Samrat Group, Nashik.MAP, Army , MumbaiOther Government Agencies.
![Page 38: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/38.jpg)
COMPETITORSEcobrick Tech.
Sindhi Colony, Pune, Maharashtra 411007 - 020 4005 9515
Category: Fly Ash BricksFly Ash Bricks India-
Sanaswadi,, Pune-Nagar Road,, Pune, Maharashtra 412208 - 09881378267
Siporex , Pune
Category : ACC BlocksNormal Clay Bricks Manufacturers
![Page 39: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/39.jpg)
financial Plan
![Page 40: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/40.jpg)
CAPITAL
Debt : 15 crores
Equity : 05 crores
Total : 20 crores
![Page 41: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/41.jpg)
FINANCIAL DETAILS
![Page 42: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/42.jpg)
CREDIT POLICY
Cement : Adv paid
Lime/ Gypsum : 15-20 days
MSEB : 06 days
Customers : Max 02 months
![Page 43: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/43.jpg)
HR Plan
![Page 44: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/44.jpg)
organisation
MD & CEO( GM OPs)
GM FIN
DGM FINANCE
GM HR
GM MARKETING
DGM OPS
![Page 45: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/45.jpg)
HR DETAILSDesignation Nos.
Manager 2
Production Engineer 1
Skilled Workers 25
Semi-Skilled/Un-skilled Workers 100
Chowkidars 3
Peons 2
Cashier/ Clerks 3
![Page 46: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/46.jpg)
HR Management
Ratio of 1: 4 of skilled to semi-skilled or un-skilled workers.
80% of workers from local catchment areas and balance from adjoining regions.
100% boarding and lodging facilities for staff available .
Workers given an incentive of Rs 10/- per day for 100 % attendance through the month.
Contractor paid Rs 50/- per labour per month .
![Page 47: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/47.jpg)
Remunerations
Semi-skilled/ Un-skilled workers : Rs 150 per day
Skilled Employees : Rs 5000- Rs 15000/-
depending on education and expertise .
Bonus planned to be given thrice a year.
![Page 48: Eco wise](https://reader036.vdocuments.mx/reader036/viewer/2022062319/55516f4bb4c9057f478b4812/html5/thumbnails/48.jpg)
THANK YOU