east side coastal resiliency...earth day photo? photo? 13 april 25 th (2017) june 15th (2017)...
TRANSCRIPT
EAST SIDE COASTAL RESILIENCYCB3/CB6 JOINT WATERFRONT TASK FORCEJune 20th, 2017
2
EAST SIDE COASTAL RESILIENCYCB3/CB6 JOINT WATERFRONT TASK FORCEJune 20th, 2017
1. Project Overview2. Project Updates - Substantial Action Plan Amendment - Interior Drainage Analysis - 24th/25th Street Alignment Update - Field Work - Other Project Activities 3. Next Steps
2
EAST SIDE COASTAL RESILIENCYCB3/CB6 JOINT WATERFRONT TASK FORCEJune 20th, 2017
1. Project Overview2. Project Updates
- Substantial Action Plan Amendment - Interior Drainage Analysis - 24th/25th Street Alignment Update - Field Work - Other Project Activities
3. Next Steps
- 20162017 Stakeholder Meetings
3
1. Project Overview2. Project Updates
- Substantial Action Plan Amendment - Interior Drainage Analysis - 24th/25th Street Alignment Update - Field Work - Other Project Activities
3. Next Steps
EAST SIDE COASTAL RESILIENCYCB3/CB6 JOINT WATERFRONT TASK FORCEJune 20th, 2017
- 20162017 Stakeholder Meetings
3 DRAFT 7/26/2016
EAST SIDE COASTAL RESILIENCYProject Goals
• Provide a reliable, integrated flood protection system; minimize use of closure structures and deployables
• Improve waterfront open spaces and access
• Respond quickly to the urgent need for increased flood protection and resiliency
• Achieve implementation milestones and project funding allocations as established by HUD
4
MONTGOMERY STREET
E. 25TH STREET
EAST SIDE COASTAL RESILIENCYProject Goals
+
RESILIENCY INFRASTRUCTURE
PEOPLE
5
EAST SIDE COASTAL RESILIENCYProject Approach: Designing Social Infrastructure
Double Swing Gates (x1)
Double Roller Gates (x1)Single Roller Gates (x5)
Pedestrian Gates (x4)
*18 Total Closure Structures
Single Swing Gate (x7)
3
MONTGOMERY STREET TIEBACK
25TH STREET TIEBACK
Closure Areas
Floodwall/Levee
33
FLOOD GATES ARE LOCATED ACROSS PEDESTRIAN, CYCLISTS, AND VEHICULAR ACCESSWAYS.
6
BASELINE FLOOD PROTECTION
Existing Active Program
Existing Circulation
Existing Buildings
Existing Maintenance Areas
Existing Passive Program
EXISTING PROGRAMUSES ALONG THE WATERFRONT
DDDDDDDDDDDDDDDDEEEEEEEEEEEEEEELLLLLLLLLLLLLLAAAAAAAAAAAAAANNNNNNNNNNNNNCCCCCCCCCCCCCCCCEEEEEEEEEEEEEEEYYYYYYYYYYYYYY SSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
HHHHHHHHHHHHOOOOOOOOOOOOOUUUUUUUUUUUUUSSSSSSSSSSSSSTTTTTTTTTTTTTOOOOOOOOOOOOOOONNNNNNNNNNNNN SSSSSSSSSSSSSTTTTTTTTTTTTTTTT
6666666666666 THTHTHTHTHTHTHTHTHTHTHTTHTHTHSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
111111111111110000000000000000 THTHTHTHTHTHTHHTHTHTHTHSSSSSSSSSSSSTTTTTTTTTTT
222222222222222000000000000000 THTHTHTHTHTHTHHHTHTHSSSSSSSSSSSSSTTTTTTTTTTTTT
2222222222223333333333333 RDRDRDRRDRDRDRDRRDRDDDSSSSSSSSSSSSSSTTTTTTTTTTTTTTTT
2222222222255 THSSSSSSSSSTTTTTTTTTT
AAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEENNNNNNNNNNUUUUUUUUUEEEEEEEEEEEEE CCCCCCCCCCCCCAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEENNNNNNNNNNNNNNNUUUUUUUUUUUUUUUEEEEEEEEEEEE BBBBBBBBBB
AAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEE AAAAAAAAAAAAAAAAA111111111111SSSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTT AAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUEEEEEEEEEEEEEEE
FFFFFFFFFDDDDDDDDDRRRRRRRRR DDDDDDDRRRRRRRRRIIIIIIVVVVVVVVVEEEEEEEEFDR DRIVEFDDDDRRRR DDDDDRRRRRIIIIVVVVVVEEEEEEFDR DRIVEFDR DRIVEEEEEEEEEEFDR DRIVE
MO
MO
MO
MO
MO
MO
MO
MO
MMO
MOO
NT
NT
NT
NT
NT
NT
NT
NTT
NTTTTTTG
OGG
OGGG
OGGGG
ME
ME
ME
ME
MEE
MEEERYRYRYRYRYRYRYRRYRRY
SSSSSSTT
DR DRIVEFDFDFDFFDFFFFFF RR DRRRIVIVIVEEEFDR DRIVE
157
Existing Trees
Manhattan GreenwayGravity Wall
Relieving Platform
DESIGN CONSIDERATIONSCRITICAL GROUND LEVEL FEATURES
DDDDDDDDDDDDDDDEEEEEEEEEEEEEEELLLLLLLLLLLLLLLAAAAAAAAAAAAAANNNNNNNNNNNNNNNNCCCCCCCCCCCCCCCCEEEEEEEEEEEEEEEEEYYYYYYYYYYYYYYY SSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
HHHHHHHHHHHHHOOOOOOOOOOOOUUUUUUUUUUUUSSSSSSSSSSSSTTTTTTTTTTTTTOOOOOOOOOOOOOOOOONNNNNNNNNNNNNNN SSSSSSSSSSSSSSTTTTTTTTTTTTTTTT
66666666666666 THTHTHTHTHTHTHTHTHTHTHTTTHTHTHSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTT
1111111111111111100000000000000000 THTHTHTHTHTHTHTHTHTHHTHHSSSSSSSSSSSSSSTTTTTTTTTTTT
2222222222222000000000000000 THTHTHTHTHTHTHTHHTHHSSSSSSSSSSSSSSTTTTTTTTTTTTTT
222222222222333333333333 RDRDRDRDRDRDRDRDRDRDRDRDDSSSSSSSSSSSSSSSTTTTTTTTTTTTTTT
222222222255 THSSSSSSSSSTTTTTTTTTTT
AAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEENNNNNNNNNNNNUUUUUUUUUUUEEEEEEEEEEEEE CCCCCCCCCCCCAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEENNNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUEEEEEEEEEEEEEE BBBBBBBBB
AAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEE AAAAAAAAAAAAAAA111111111111SSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTT AAAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEE
FDR DRIVEVEVEIVEIVERIVRIVRIVRIVRIDRIDRDRR DR DDR DDRFDRFDRDRFDFDFDFDDRDRDDRDRFDFDRFDFDDDRFFDFDFFDFDFDFDEEIVEIVVEVEVEVERIVRIVRIVRIVRIVRIVRIVRIVRIVRIRIRIDRDRDRIRIRIRIVDRDRDRDDRDRR DDDDR DR
DRDRDRRR DR DFDR DRIVEEFDR DRIVE
MO
MO
MO
MO
MO
MO
MMO
MMO
MOOOO
NTNTNTNTNTNTNTNTNTNTTN
TTGOGGOGGGGGOGGGGM
EM
EM
EM
EM
EM
EEEEEERYRYRYRYRYRYRYRYRYRRYRSSSSSSTT
FDFDFFDFDFFF R DRIVEEEIVEIVER DRIR DRIRRFDRFDR EEEEEVEVEVEVVIVIVIVVRRIRIRIDRRDRDRDRDDDDRDR DR DR DDDRRRRRRDRDDDDRDRDFDFDDDFDFFFDFDFDR DRIVE
168
DESIGN CONSIDERATIONSCRITICAL BELOW-GROUND FEATURES
DDDDDDDDDDDDDDDEEEEEEEEEEEEEEELLLLLLLLLLLLLLLAAAAAAAAAAAAAANNNNNNNNNNNNNNNNCCCCCCCCCCCCCCCCEEEEEEEEEEEEEEEEEYYYYYYYYYYYYYYY SSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
HHHHHHHHHHHHHOOOOOOOOOOOOUUUUUUUUUUUUSSSSSSSSSSSSTTTTTTTTTTTTTOOOOOOOOOOOOOOOOONNNNNNNNNNNNNNN SSSSSSSSSSSSSSTTTTTTTTTTTTTTTT
66666666666666 THTHTHTHTHTHTHTHTHTHTHTTTHTHTHSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTT
1111111111111111100000000000000000 THTHTHTHTHTHTHTHTHTHHTHHSSSSSSSSSSSSSSTTTTTTTTTTTT
2222222222222000000000000000 THTHTHTHTHTHTHTHHTHHSSSSSSSSSSSSSSTTTTTTTTTTTTTT
222222222222333333333333 RDRDRDRDRDRDRDRDRDRDRDRDDSSSSSSSSSSSSSSSTTTTTTTTTTTTTTT
222222222255 THSSSSSSSSSTTTTTTTTTTT
AAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEENNNNNNNNNNNNUUUUUUUUUUUEEEEEEEEEEEEE CCCCCCCCCCCCAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEENNNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUEEEEEEEEEEEEEE BBBBBBBBB
AAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEE AAAAAAAAAAAAAAA111111111111SSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTT AAAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEE
FFFFFFFFFFDDDDDDDRRRRRRRRRR DDDDDDDDRRRRRRRRRRIIIIIIIIIVVVVVVVVVVEEEEEEFDR DRIVEFDFD
EFDR DRIVEFDR DRIVEFDR DRIVEEFDR DRIVE
MO
MO
MO
MO
MO
MO
MMO
MMO
MOOOO
NTNTNTNTNTNTNTNTNTNTTN
TTGOGGOGGGGGOGGGGM
EM
EM
EM
EM
EM
EEEEEERYRYRYRYRYRYRYRYRYRRYRSSSSSSTT
FDFDFDFDFF R DRIVEEEFFDRRR DRIRIRIVEFFFFDR VEFFDR VEFDR DRIV
17
Con Ed StationDEP Regulators
Electrical Transmission LinesDEP Conveyance
Watermains
9
EAST RIVER PARK
STUYVESANT COVE PARK
THE PROJECT CREATES AN ELEVATED EDGE 8’-9’ ABOVE EXISTING GROUND LEVEL.
NOTE: FEATURES ARE SUBJECT TO VALUE ENGINEERING
CON ED TIE-IN
MONTGOMERY ST. TIE-BACK
25TH ST. TIE-BACK
MURPHY BROTHERS PLAYGROUND
ASSER LEVY PLAYGROUND
10
A PROTECTED COMMUNITYAND IMPROVED WATERFRONT!
11
ESCR NEXT STEPSCurrent Project Schedule
BID AWARD
GROUNDBREAKING
EAST SIDE COASTAL RESILIENCY PROJECTWINTER2017/18
WINTER2015/16
WINTER2016/17 TBD TBD
ULURP
ENVIRONMENTAL / EIS
DESIGN PROCESS
COMMUNITY ENGAGEMENT
PREPARATION &SUBMISSION CONSTRUCTIONCOMMUNITY &
TECHNICAL REVIEWS
DRAFT EIS REPORT
PUBLIC REVIEWS &FINAL EIS REPORT
DRAFT STATEMENT OF WORK
PRELIMINARY DESIGN PHASE
FINALDESIGN PHASE
CONCEPTDESIGN PHASE
12
1. Project Overview2. Project Updates
- Interior Drainage Analysis - 24th/25th Street Alignment Update - Field Work - Other Project Activities
3. Next Steps
EAST SIDE COASTAL RESILIENCYCB3/CB6 JOINT WATERFRONT TASK FORCEJune 20th, 2017
- Substantial Action Plan Amendment- 20162017 Stakeholder Meetings
8
APRIL 25THJANUARY 17TH
GOUVERNEUR GARDENS BOARD
PHOTO? PHOTO? PHOTO?
NYC.GOV/ESCR WEBSITE FOR PUBLIC INPUT
APRIL 27TH
EAST SIDE COASTAL RESILIENCY2016 - 2017 Stakeholder Meetings
STUYVESANTTOWN
ASSER LEVY
APRIL 22ND
EARTH DAY
8
APRIL 25THJANUARY 17TH
GOUVERNEUR GARDENS BOARD
PHOTO? PHOTO? PHOTO?
NYC.GOV/ESCR WEBSITE FOR PUBLIC INPUT
APRIL 27TH
EAST SIDE COASTAL RESILIENCY2016 - 2017 Stakeholder Meetings
STUYVESANTTOWN
ASSER LEVY
APRIL 22ND
EARTH DAY
13
APRIL 25th (2017)JUNE 15th (2017)
SEPTEMBER 15th (2016) JANUARY 17th (2017)
GOUVERNEUR GARDENS BOARD
NYC.GOV/ESCR WEBSITE FOR PUBLIC INPUT
APRIL 27th (2017) JUNE 14th (2017)
PROJECT UPDATES2016 - 2017 Stakeholder Meetings
STUYVESANTTOWN
GRAND STREETWELLNESS FAIR
CB6 TASK FORCE
EARTHDAY
APRIL 22nd (2017)
14
PROJECT UPDATESSubstantial Action Plan Amendment
• Published online March 24th, 2017
• Reflects most recent understanding of project design / costs
• Hearing held on April 4, 2017, at Manny Cantor Center in Manhattan
• City provided update on project status and Action Plan process
• Received public comments (oral and written)
• Comment period closed April 24, 2017
15
PROJECT UPDATESSubstantial Action Plan Amendment - Process with HUD
• Comments received include following topics: - Exploration of Alternative Elements/ Approaches - Sea Level Rise and Modeling - Flood Protection Alignment and Project Design - Maintenance and Operations - City Response to Future Floods -BenefitCostAnalysis - Funding - Outreach
• City responded to comments and submitted Action Plan Amendment to HUD on May 12, 2017
• HUD to review and approve Action Plan Amendment within 60 days
16
PROJECT UPDATESInterior Drainage Analysis
PREVIOUSLY, A 13M GALLON TANK WAS PLANNED TO BE CONSTRUCTED UNDER THE TENNIS COURTS.
17
PROJECT UPDATESInterior Drainage Analysis
Existing Active Program
Existing Circulation
Existing Buildings
Existing Maintenance Areas
Existing Passive Program
EXISTING PROGRAMUSES ALONG THE WATERFRONT
DDDDDDDDDDDDDDDDEEEEEEEEEEEEEEELLLLLLLLLLLLLLAAAAAAAAAAAAAANNNNNNNNNNNNNCCCCCCCCCCCCCCCCEEEEEEEEEEEEEEEYYYYYYYYYYYYYY SSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
HHHHHHHHHHHHOOOOOOOOOOOOOUUUUUUUUUUUUUSSSSSSSSSSSSSTTTTTTTTTTTTTOOOOOOOOOOOOOOONNNNNNNNNNNNN SSSSSSSSSSSSSTTTTTTTTTTTTTTTT
6666666666666 THTHTHTHTHTHTHTHTHTHTHTTHTHTHSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
111111111111110000000000000000 THTHTHTHTHTHTHHTHTHTHTHSSSSSSSSSSSSTTTTTTTTTTT
222222222222222000000000000000 THTHTHTHTHTHTHHHTHTHSSSSSSSSSSSSSTTTTTTTTTTTTT
2222222222223333333333333 RDRDRDRRDRDRDRDRRDRDDDSSSSSSSSSSSSSSTTTTTTTTTTTTTTTT
2222222222255 THSSSSSSSSSTTTTTTTTTT
AAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEENNNNNNNNNNUUUUUUUUUEEEEEEEEEEEEE CCCCCCCCCCCCCAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEENNNNNNNNNNNNNNNUUUUUUUUUUUUUUUEEEEEEEEEEEE BBBBBBBBBB
AAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEE AAAAAAAAAAAAAAAAA111111111111SSSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTT AAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUEEEEEEEEEEEEEEE
FFFFFFFFFDDDDDDDDDRRRRRRRRR DDDDDDDRRRRRRRRRIIIIIIVVVVVVVVVEEEEEEEEFDR DRIVEFDDDDRRRR DDDDDRRRRRIIIIVVVVVVEEEEEEFDR DRIVEFDR DRIVEEEEEEEEEEFDR DRIVE
MO
MO
MO
MO
MO
MO
MO
MO
MMO
MOO
NT
NT
NT
NT
NT
NT
NT
NTT
NTTTTTTG
OGG
OGGG
OGGGG
ME
ME
ME
ME
MEE
MEEERYRYRYRYRYRYRYRRYRRY
SSSSSSTT
DR DRIVEFDFDFDFFDFFFFFF RR DRRRIVIVIVEEEFDR DRIVE
15
CHALLENGES - PARK IMPACTS AND RESTRICTIONS - CONTAMINATION - MAINTENANCE AND OPERATIONS
18
PROJECT UPDATESInterior Drainage Analysis
Existing Active Program
Existing Circulation
Existing Buildings
Existing Maintenance Areas
Existing Passive Program
EXISTING PROGRAMUSES ALONG THE WATERFRONT
DDDDDDDDDDDDDDDDEEEEEEEEEEEEEEELLLLLLLLLLLLLLAAAAAAAAAAAAAANNNNNNNNNNNNNCCCCCCCCCCCCCCCCEEEEEEEEEEEEEEEYYYYYYYYYYYYYY SSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
HHHHHHHHHHHHOOOOOOOOOOOOOUUUUUUUUUUUUUSSSSSSSSSSSSSTTTTTTTTTTTTTOOOOOOOOOOOOOOONNNNNNNNNNNNN SSSSSSSSSSSSSTTTTTTTTTTTTTTTT
6666666666666 THTHTHTHTHTHTHTHTHTHTHTTHTHTHSSSSSSSSSSSSSSSSTTTTTTTTTTTTTT
111111111111110000000000000000 THTHTHTHTHTHTHHTHTHTHTHSSSSSSSSSSSSTTTTTTTTTTT
222222222222222000000000000000 THTHTHTHTHTHTHHHTHTHSSSSSSSSSSSSSTTTTTTTTTTTTT
2222222222223333333333333 RDRDRDRRDRDRDRDRRDRDDDSSSSSSSSSSSSSSTTTTTTTTTTTTTTTT
2222222222255 THSSSSSSSSSTTTTTTTTTT
AAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEENNNNNNNNNNUUUUUUUUUEEEEEEEEEEEEE CCCCCCCCCCCCCAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVEEEEEEEEEEEEENNNNNNNNNNNNNNNUUUUUUUUUUUUUUUEEEEEEEEEEEE BBBBBBBBBB
AAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUUUUEEEEEEEEEEEEEEEE AAAAAAAAAAAAAAAAA111111111111SSSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTT AAAAAAAAAAAAAAAAAVVVVVVVVVVVVVVVVVVVEEEEEEEEEEEEEEEEEEENNNNNNNNNNNNNNNNUUUUUUUUUUUUUUUEEEEEEEEEEEEEEE
FFFFFFFFFDDDDDDDDDRRRRRRRRR DDDDDDDRRRRRRRRRIIIIIIVVVVVVVVVEEEEEEEEFDR DRIVEFDDDDRRRR DDDDDRRRRRIIIIVVVVVVEEEEEEFDR DRIVEFDR DRIVEEEEEEEEEEFDR DRIVE
MO
MO
MO
MO
MO
MO
MO
MO
MMO
MOO
NT
NT
NT
NT
NT
NT
NT
NTT
NTTTTTTG
OGG
OGGG
OGGGG
ME
ME
ME
ME
MEE
MEEERYRYRYRYRYRYRYRRYRRY
SSSSSSTT
DR DRIVEFDFDFDFFDFFFFFF RR DRRRIVIVIVEEEFDR DRIVE
15
CURRENTLY EVALUATING ALTERNATIVES THAT MEET PROJECT OBJECTIVES BUT ARE LESS DISRUPTIVE AND MORE COST EFFECTIVE
TANK REMOVED FROM PROJECT DUE TO COMPLEXITY OF CHALLENGES AND INCREASING COSTS
15
~60 ft
E 23RD STREET
FDR DRIVE
E 25TH STREET
VA HOSPITAL
~170 ft
~50 ft
VA HOSPITAL FLOODWALL
~260 ft
9 ft
10 ft
SERVICEAREA
ASSER LEVY
RECREATION
CENTER
PLAYGROUND
TRACK
PROPOSED ALIGNMENT 1 (NORTH) PROPOSED ALIGNMENT 2 (SOUTH)
19
PROJECT UPDATES24th/25th Street Alignment
20
PROJECT UPDATESField Work
• Geotechnical borings: Investigating subsurface conditions to refine design and costs
- Flood protection foundations - Pedestrian bridges foundations - Sewer & drainage infrastructure - FDR Drive
• DEP sewer inspections: Determine need for floodproofing, rehabilitation, or reconstruction
• Updated tree inventory: Confirming current conditions
21
PROJECT UPDATESOther Project Activities
• Design Refinement -Parkplanrefinement - Materials, paving, and furnishing - Detailed planting strategy - Detailed wall and tie-back design -Walltreatments+finishes - Bridge alignment and detail design
• Advancing development of Maintenance & Operations plan
• Further technical analysis and engineering
22
1. Project Status2. Project Updates 3. Next Steps
EAST SIDE COASTAL RESILIENCYCB3/CB6 JOINT WATERFRONT TASK FORCEJune 20th, 2017
23
ESCR NEXT STEPSLook Ahead
• Future Engagement & Stakeholder Outreach/Meetings - Ongoing- Asser Levy site visit with CB6 Task Force- September Task Force Meeting
• Mass Mailing Plans - Fall / Winter 2017
• Community Board Meeting(s) – Related to PDC Design Review - Fall /Winter 2017
• PDC Design Review - Fall / Winter 2017
• EIS Hearing / ULURP - Winter 2017 /2018