East San Fernando Valley Transit CorridorProject Update Meetings Preview
DRAFT 11/4/14
2
Purpose of Today’s Meeting
• Provide project update
• Share alternatives being studied
• Answer questions
3
Project Background
• Measure R Project
• $170.1 million identified in the Long Range
Transportation Plan
• Environmental Analysis underway
Process initiated in 2011
Initial Study Alternatives identified in 2013
Refined Alternatives throughout 2014
4
Study Partners
• Federal Transit Administration lead on federal clearance
• Metro lead on state clearance
• Coordinating with Cities of Los Angeles and San Fernando
5
Existing Conditions
Typical Roadway Conditions:• 100’ right-of-way
• 80 intersections
• Two to three travel lanes in each direction
• Left turns permitted throughout
• Street parking
• Landscaped median (Pacoima)
6
Study Area and Corridor Characteristics
6
9.2 Mile Alignment: Metro Orange Line to Sylmar/San Fernando Metrolink Station
• 460,000 People reside in the Study Area
Long Beach, CA. – 462,000
Atlanta (City), GA. – 420,000
Miami (City), FL. – 399,000
• 35% Transit Dependent Population
• Average bus trip is 4.7 miles
• Averages bus speed ~12 mph in PM peak
• 7th busiest bus corridor in Metro system
• 2nd highest bus boardings in the SFV
Source: Metro and U.S. Census 2010, State & County QuickFacts6
RECORD OFDECISION/NOTICE OF
DETERMINATION
OperationConstruction
4
5
Project Development Process
7
5 Phases
Alternatives Analysis
Completed Jan. 2013
1EngineeringEnvironmental
Studies (EIS/EIR) & ConceptualEngineering
23
2 Environmental Studies Phase
DRAFT EIRS/EIR
SELECTLOCALLY
PREFERREDALTERNATIVE
FINALEIS/EIR
EIS/EIRSCOPING
Ongoing Public Participation
We AreHere
Environmental Issues to be Studied
8
• Transportation
• Land Use & Development
• Real Estate & Acquisitions
• Communities & Neighborhoods
• Visual & Aesthetics
• Air Quality
• Noise & Vibration
• Ecosystems & Biological Resources
• Geotechnical/Seismic/Hazardous Materials
• Water Resources
• Energy
• Historical, Archaeological & Paleontological Resources
• Parklands & Community Facilities
• Economic & Fiscal Development
• Safety & Security
• Construction Impacts
• Growth Inducing Impacts
• Environmental Justice
• Climate Change
• Cumulative Impacts
How did we get here?
20132011 2012Refine
Alternatives
2014
Scoping Mtgs.
AA Report
InitialStudies
October April October NovemberMarch
Environmental Process Begins
No Build TSM
Streetcar Bus
29 Alternatives
Rail
8 Alternatives 5 Alternatives
Tram Rail isintroduced
6 Alternatives
May
9
Alt. 1
Curb Running BRT
10
Similar to Wilshire BRT
• 9.2 miles total length:
6.7 miles curb-running dedicated busway
2.5 miles mixed-flow
• 18 enhanced stations:
Ticket Vending Machines
Canopies
• Existing Maintenance Facility :
Division 15
• Could be implemented soonest and with existing financial resources
1010
Alt. 2
MedianRunning BRT
11
Similar to Metro Orange Line
• 9.2 miles total length:
6.7 miles median busway and 2.5 miles mixed-flow
• 17 enhanced stations:
Ticket Vending Machines
Canopies
• Existing Maintenance Facility:
Division 15
11
Alt . 3
Median Running Low-Floor LRT/Tram
12
Similar San Diego, Portland and European systems
• 9.2 miles total length:
6.7 miles median dedicated guideway
2.5 miles mixed-flow
• 28 enhanced stations:
Ticket Vending Machines
Canopies
12
Alt. 4
Median Running LRT
13
Similar to existing Metro LRT Lines
• 9.2 miles total length:
6.7 miles median dedicated guideway
2.5 miles underground
2.5 miles on railroad right-of-way
Adjacent to San Fernando Road
• 14 enhanced stations (3 underground):
Ticket Vending Machines
Canopies
13
14
• Requires new Maintenance Storage Facility
25-30 acre site
Within ¼ mile of route
Three candidate areas identified
Maintenance Storage Facility
14
15
Before
Van Nuys at Metro Orange Line
15
16
Median Running BRT at Van Nuys/MOLConceptual
After
16
17
Before
Van Nuys Civic Center
18
After
Low-Floor LRT/Tram at Van Nuys Civic CenterConceptual
18
19
Before
Van Nuys at Victory
19
20
LRT at Van Nuys/VictoryConceptual
20
21
• Add Median running
Tram rendering at Marvin
Braude or Panorama
High
Before
Van Nuys at Roscoe
21
22
Curb Running BRT at Van Nuys/RoscoeConceptual
After
23
In Progress
Van Nuys at Laurel Canyon
24
San Fernando at Maclay
Before
24
25
Low-Floor LRT/Tram at San Fernando/MaclayConceptual
After
25
26
Rail Road Tracks at Maclay
Before
26
27
LRT at Rail Road Tracks/MaclayConceptual
27
28
Three Route Options
29
Considerations for Comparison
30
Projected 2040 Average Speed (MPH)
11.3 11.3
13.415
13.1
19.2
0
5
10
15
20
25
No Build TSM Alt 1 - Curb RunningBRT
Alt 2 - Median RunningBRT
Alt -3 Tram Alt 4 - LRT
Projected 2040 Travel Time (Minutes)
31
49
49
41
37
42
29
20 30 40 50 60
No Build
TSM
Alt 1 - Curb Running BRT
Alt 2 - Median Running BRT
Alt -3 Tram
Alt 4 - LRT
Minutes
Projected 2040 Corridor Boardings
32
20,900 24,200
30,900 31,500
35,800
47,400
0
10,000
20,000
30,000
40,000
50,000
60,000
No Build TSM Alt 1 - Curb RunningBRT
Alt 2 - Median RunningBRT
Alt 3 - Tram Alt 4 - LRT
33
16,700
19,000
30,500 30,500
10,400 8,600
12,300
3,800 3,900 5,300 4,600
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
Alt 1 - Curb Running BRT Alt 2 - Median Running BRT Alt 3 - Tram Alt 4 - LRT
Premium Service Boardings
Metro Local Line 233 (or 233X in Alt1)
Non-project Transit Boardings
Projected 2040 Corridor Boardings
Capital Costs: 2014 Dollars
34
$0.0
$294 Million$402 Million
$1.3 Billion
$2.6 Billion
$0.0
$0.5
$1.0
$1.5
$2.0
$2.5
$3.0
No Build TSM Alt 1 - Curb RunningBRT
Alt 2 - MedianRunning BRT
Alt -3 Tram Alt 4 - LRT
$35 Million
Funds Identified $170,000,000
We Want to Hear from You
35
• US Mail:
Walt Davis, Project ManagerOne Gateway Plaza - MS 99-22-5Los Angeles, CA 90012
• Phone: (818) 276-3233
• E-mail: [email protected]
• www.metro.net/eastSFVtransit
• Facebook: EastSFVtransit
• Twitter: @eastSFVtransit
Meetings
36
• November 6, 2014 (Thursday) at 6:00 PM San Fernando Aquatic Center, 208 Park Ave, San Fernando
• November 12, 2014 (Wednesday) at 4:30 PM Marvin Braude Constituent Center, 6262 Van Nuys Bl, Van Nuys, CA
Webcast http://ustream.tv/channel/eastsfv
• November 13, 2014 (Thursday) at 6:00 PM Pacoima Neighborhood City Hall, 13520 Van Nuys Blvd, Pacoima
Next Steps
• Review comments received at these meetings
• Continue preparation of the Draft EIS/EIR/Technical Studies
37
Questions
38
Q & A