east lancaster bus rapid transit project ______________________

10
DICK RUDDELL EAST LANCASTER EAST LANCASTER BUS RAPID TRANSIT PROJECT BUS RAPID TRANSIT PROJECT ______________________ ______________________

Upload: mikayla-maldonado

Post on 03-Jan-2016

51 views

Category:

Documents


0 download

DESCRIPTION

EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________. Dick Ruddell. Bus Rapid Transit Definition. Bus Rapid Transit (BRT) is best explained as the simulation of rail transit using bus technology. Key components are: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

DICK RUDDELL

EAST LANCASTEREAST LANCASTERBUS RAPID TRANSIT PROJECTBUS RAPID TRANSIT PROJECT

____________________________________________

Page 2: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

Bus Rapid Transit DefinitionBus Rapid Transit Definition

Bus Rapid Transit (BRT) is best explained as the simulation of rail transit using bus technology.

Key components are: high frequency bus service along the Corridor,

enhanced amenities such as aesthetic street furniture and landscaping,

technology treatments to make the service “rapid” and

appropriate marketing campaigns

Page 3: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

East Lancaster BRT ProjectEast Lancaster BRT Project

Existing E. Lancaster Components for this Project Six-mile Corridor 2,400 daily passenger boardings Current service features 15-minute frequencies

(similar to light rail frequency) High levels of pedestrian activity Corridor contains a mix of commercial and retail

establishments adjacent to residential areas

Page 4: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

East Lancaster BRT ProjectEast Lancaster BRT Project

Three Major Components Rapid Bus Treatments Vehicle procurement Improved Passenger stop

Convenience & Aesthetics/ Marketing

Page 5: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

Optical Detector

Emitter

Signal Controller

Original photo courtesy of 3M

Transit Signal Priority now Installed!

Page 6: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

Future Bus Rapid Transit VehicleFuture Bus Rapid Transit Vehicle

Page 7: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

Proposed East Lancaster CorridorBus Rapid Transit Service Concept

Frequency & Span of Service Weekday 15 minutes – 5:15am – 10:45pm Saturday 30 minutes – 5:45am – 10:45pm Sunday 60 minutes – 6:45am – 7:45pm

Page 8: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

Real-time arrival signs (future component)

New Style Shelter with Solar lighting (security)

Information Kiosk with enhanced

customer information signage

Brick Pavers at shelters

Page 9: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________

Examples of corridor branding = “unique identity and image”

Bus stops with passenger

information and solar lighting

Bench upgrades

Transit Signal Priority = Rapid Transit

Unique, high-capacity vehicles

Sidewalk extensions & repairs

Brick Paving

Page 10: EAST LANCASTER BUS RAPID TRANSIT PROJECT ______________________