early tpc history and recent developmentsbusto/mondayam1/ronan.pdf · early tpc history and recent...

105
M.T. Ronan, 2004 Paris TPC Workshop 1 20 Dec. 2004 Early TPC History and Recent Developments Michael T. Ronan LBNL (Berkeley) w/ draft of Early TPC History by A. Clark, P. Eberhard, S. Klein, D. Nygren, M. Ronan (Ed.), J. Thomas, W. Wenzel, H. Wieman LBNL (Berkeley) Second “Rare-Event” TPC Workshop Paris, 20-21 Dec. 2004

Upload: buinguyet

Post on 10-Dec-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 1

20 Dec. 2004

Early TPC History andRecent Developments

Michael T. RonanLBNL (Berkeley)

w/ draft of Early TPC History by

A. Clark, P. Eberhard, S. Klein, D. Nygren,M. Ronan (Ed.), J. Thomas, W. Wenzel, H. Wieman

LBNL (Berkeley)

Second “Rare-Event” TPC WorkshopParis, 20-21 Dec. 2004

Page 2: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 2

20 Dec. 2004

Outline● An Introduction to Time Projection Chambers● TPC Invention & Bevatron Prototype● PEP-TPC / “The TPC Experiment”● PEP-4/9 TPC/Two-Gamma Experiment● TRISTAN Topaz-TPC● LEP ALEPH & DELPHI TPC's● PEP-II B-Factory Commissioning - Mini-TPC● EOS-TPC & The STAR-TPC at RHIC● International LC-TPC R&D

Page 3: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 3

20 Dec. 2004

A Brief Introduction to TPC's

● e+e- Colliding Beam Configuration● PDG “Review of Particle Properties” description● TPC gating grid● PEP TPC dE/dx measurements & most probable

energy deposition predictions● TPC Particle Identification ● The 2003 Time Projection Chamber Symposium● References

Page 4: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 4

20 Dec. 2004

TPC studies of e+e- collisions

From 2004 CERN Courier article bySpencer Klein, LBNL

Page 5: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 5

20 Dec. 2004

Review of Particle Properties, P.L. B 592,1 ('04) Written Nov. 1996 by M.T. Ronan Detectors with long drift distances perpendicular to a multi-anode proportional (wire) plane provide three-dimensional information, with one being the time projection. A (typically strong) magnetic field parrallel to the drift direction suppresses transverse diffusion (s = r2Dt) by a factor D(B)/B(0) = 1/(1+w2t2), where D is the diffusion coefficient, w = eB/mc is the cyclotron frequency, and t is the mean time between collisions. Multiple measurements of energy deposit along the particle trajectory combined with the measurement of momentum in magnetic field allows excellent particle identification [91], as can be seen in Fig. 28.5. See next slide.

A typical gas-filled TPC consists of a long uniform drift region (1-2 m) generated by a central high-voltage membrane and precision concentric cylindrical field cages within a uniform, parallel magnetic field []. Details of construction and electron trajectories near the anode end are shown in Fig. 28.6. See following slide. Signal shaping and processing using analog storage devices or FADC's allows excellent pattern recognition, track reconstruction and particle identification within the same detector. Typical values: Gas: Ar + (10-20%) CH

4 Pressure(P) = 1-8.5 atm.

E/P = 100-200 V/cm/atm. B = 1-1.5 Tesla v

drift = 5-7 cm/us ωτ = 1-8

σx or y

= 100-200 um σz = 0.2 – 1 mm

σEdep

= 2.5-5.5 % See also www-tpc.lbl.gov, i.e. www-tpc server at lbl.gov

Time-projection chambers

Page 6: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 6

20 Dec. 2004

Page 7: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 7

20 Dec. 2004

TPC Gating Grid

A TPC gating grid (GG) is used to control the backflow of positive ions generated in electron signal amplification by anode wires or Micropattern Gas Detectors (MPGD's), such as GEM's or Micromegas.

In a MWPC readout of a TPC, the gating grid is placed just before the virtual ground provided by the shielding grid and is maintained at proper average voltage, but has alternating positive and negative potential when closed.

Note: A gating grid was not included in the original PEP TPC proposal or the Bevatron prototype. The idea to include one may have originated from a comment by G.Charpak at the 1978 Vienna Wire Chamber conference. The early decision to develop the GG upgrade for the PEP-TPC was critical. See CERN 1981 TPC seminar by M.T. Ronan.

Electric fields for the MWPC PEP-II Mini-TPC

Page 8: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 8

20 Dec. 2004

Page 9: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 9

20 Dec. 2004

Page 10: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 10

20 Dec. 2004

This talk could have been titled as

or, more specifically

“Gaseous TPC's for ever”

“Large Gaseous TPC'sfor

Accelerator-based Experiments”

Page 11: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 11

20 Dec. 2004

Outline

● Invention of the Time Projection Chamber (D. Nygren, 1974)

● PEP TPC Proposal

● Prototype Bevatron TPC

● The PEP4 TPC Experiment

● The PEP4/9 TPC/Two-Gamma Experiment

● Other e+e- Applications

– TOPAZ, ALEPH & DELPHI

– PEP-II Commissioning Mini-TPC● Heavy Ion Applications

● International LC TPC Detector Design Studies

Page 12: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 12

20 Dec. 2004

“Silver Anniversary for the TPC” Berkeley Lab VIEW, Vol.1 No.5, Oct. 31, 2003The TPC A TPC is a barrel-shaped detector whose chamber is filled with pressurized gas and a perfectly uniform electric field. The barrel is fitted around a beamline so that the particles created in a collision fly out through its chamber. A powerful magnet surrounding the barrel curves the path of the particles passing through the chamber so that their momentum can be measured. As the particles pass through the chamber they collide with atoms of the gas, knocking out a string of electrons that respond to the electric field and drift towards the end of the chamber. At the end of the TPC chamber is a pie-shaped array of wire and sophisticated electronics that can detect and sift through thousands of particles simultaneously and can cleanly distinguish between similar types of particles. A Time Projection Chamber is like a 3-D camera that captures images of the flight of subatomic particles. The TPC is at the heart of the STAR detector, now at RHIC in Brookhaven.

As Nygren once explained, “TPC's allow us to reconstruct any track in three dimensions by determining how long the electrons took to drift through a given distance in the gas, which of the wires on the pie-shaped array picked them up, and what point along the wire they hit and were recorded. Because of its ability to visualize tracks in three dimensions, a TPC can sort out multiple particles with ease.”Nygren has said the idea for the TPC came to after he realized that real improvements in particle detection could not be achieved without a radical departure from the old ways. ... see www.lbl.gov/Publications/Currents/Archive/Oct-31-2003.html

A less technical TPC description

Page 13: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 13

20 Dec. 2004

PEP4 TPC Proposal● Physics motivation

– “... excellent pattern recognition and charged particle identification over most of 4pi steradians, even within the high particle densities expected in jet-like events.”

● TPC Detector

● TPC Chamber

– 1 m radius, up to 1 m drift in P10 (Ar-CH4) @ 10 atm.

● Superconducting coil

● Electromagnetic Calorimeter

– Gaseous sampling digital ECal of Lead and Ethyl-bromide.

● Muon Detector

Page 14: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 14

20 Dec. 2004

Page 15: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 15

20 Dec. 2004

Time Projection Chamber

Page 16: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 16

20 Dec. 2004

TPC Endcap Wire Array

Page 17: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 17

20 Dec. 2004

TPC Wire Geometry Details

Page 18: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 18

20 Dec. 2004

TPC Gas: ArCH4 (P20)

Page 19: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 19

20 Dec. 2004

Most Probable Energy Loss(dE

mp/dx)

Page 20: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 20

20 Dec. 2004

dEmp

/dx Resolution vs. Pressure

Page 21: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 21

20 Dec. 2004

TPC Two Track Separation

Page 22: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 22

20 Dec. 2004

TPC Endcap Region

Page 23: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 23

20 Dec. 2004

Proposed TPC Detector

Superconducting coilB = 1.2T

Digital Pb-Gas ECal

TPC P10 @ 10atm r=1m, max. drift =1m

Dec. 30, 1976

Page 24: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 24

20 Dec. 2004

Bevatron Prototype TPC

Principle of Operation

Page 25: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 25

20 Dec. 2004

Bevatron test results

● Excellent position resolution

● Clean particle identification

⇒ no show stoppers!

Page 26: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 26

20 Dec. 2004

TPC Technical Design Reports(1977-1978)

● TPC Chamber Readout (M.Nakamura, P.Martin, P.Robrish & R.Jared EET-1478, Feb. 2, 1978)

– Electrical Characteristics of the TPC

– Endcap Wire and Cathode pad array

● TPC Electronics (D.Landis, N.Madden, B.Jackson, D.Jared, K.Lee, ...)

– Front end preamplifiers

– Shaper/Amplifiers

– CCD's

– Digitizers

● TPC Trigger Electronics (Jackson/Jared/Ronan EET-1471, Oct. 31, 1977)

– IDC Two-photon rejection (pT timing cut)

– TPC “Ripple trigger”

Page 27: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 27

20 Dec. 2004

TPC Readout

TPC Endcap

Page 28: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 28

20 Dec. 2004

TPC TriggeringIDC-ODC pretrigger

IDC-TPC pretrigger

PTC Trigger

TPC Endcap pretrigger & TPC trigger

Page 29: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 29

20 Dec. 2004

● Spokesmen: D.Nygren, P.Oddone, B. Shen (UCR), W. Hoffman

● Final Design, Production and Response Characterization

● PEP4-TPC Assembly '80-'81

● Commissioning '81-'82

● Upgrades '83

– TPC Gating Grids & lower-mass IFC with resistive coating

– Superconducting coil

● Data Taking '84-'86 Int. lum./day = 0.3 pb-1

– Total int. lum. = 100 pb-1

● Physics

– Jets, jets & more jets (π, K, p, ... production and correlations)

The PEP4 TPC Experiment

Page 30: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 30

20 Dec. 2004

PEP e+e- Storage Ring

SPEAR

IR2 TPC Mini-TPC BaBar

SLD

San Andreasfault

Page 31: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 31

20 Dec. 2004

Final Design

Page 32: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 32

20 Dec. 2004

Production

Page 33: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 33

20 Dec. 2004

Response Characterization

Page 34: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 34

20 Dec. 2004

Commissioning

Page 35: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 35

20 Dec. 2004

Performance

Page 36: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 36

20 Dec. 2004

e

µ

π K dp

min. I.

smallrelativistic rise

Ar CH4 (P20) at 8.5 bar

Page 37: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 37

20 Dec. 2004

PEP4-TPC Electronics

● Discrete front-end preamp's

– First time Nuclear Instrumentation (NI) was used on a HEP experiment.

– Very low noise, ~500 electrons

● Shaper / Amplifier circuits

– xx

● Charge Coupled Devices (CCD) boards

– Fairchild xxx CCD's

● Digitizers

– Common non-linear ramp digitizers*

● Trigger Electronics

– Self triggered using a “TPC Ripple Trigger”

* Patent by Mitch Nakamura, LBL

Page 38: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 38

20 Dec. 2004

Design & Proformance

Page 39: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 39

20 Dec. 2004

TPC Self-triggering

Page 40: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 40

20 Dec. 2004

Page 41: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 41

20 Dec. 2004

TPC Upgrades

Page 42: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 42

20 Dec. 2004

Performance

Page 43: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 43

20 Dec. 2004

Monte Carlo simulation

Page 44: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 44

20 Dec. 2004

TPC Jet Physics

Page 45: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 45

20 Dec. 2004

PEP4-TPC Publications

Pier OddoneApr. 1984

Page 46: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 46

20 Dec. 2004

● Spokesmen: Elliott Bloom, SLAC & Mike Ronan, LBL

● Upgrades '86-'87

– Straw Tube Vertex Chamber

– ...

– Injection from SLC Damping Rings (DR's)

– PEP “High Lum.”: Insertion quads: mini-β

● Data Taking '89-'90 Int. lum./day = 1 pb-1

– Switching between PEP I injection & SLC/SLD running.

– Int. lum. = 10 pb-1

● Planned Physics

– B-quark jets

– Tau

– Two-photon

The PEP4/PEP9 TPC/2γ Experiment

Page 47: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 47

20 Dec. 2004

Page 48: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 48

20 Dec. 2004

Page 49: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 49

20 Dec. 2004

Page 50: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 50

20 Dec. 2004

selectively

T

VC Pretriggering

Page 51: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 51

20 Dec. 2004

SLAC Program CommitteeSteady progress

● 1986 - 1987 Upgrades

– Detector: new Straw VC

– PEP mini-β

– SLC injection

● 1988 Injection testing

– High efficiency injection

– Switching between SLC & PEP

● 1989 Pilot run

– Sep. '89 Int. lum. 1 pb-1/day

*** Oct. 1989 Earthquake ***

– PEP knocked out of alignment

– Damaged IR2 beam pipe

● 1990 Production Int. lum. ~ 10 pb-1

Page 52: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 52

20 Dec. 2004

B Physics

Straw tube Vertex Chamber

TPC End view

One event from PEP4/9 commissioning run in 1989.

Page 53: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 53

20 Dec. 2004

Page 54: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 54

20 Dec. 2004

Tau Physics First observation of the τ→ K

1ν,

strange axial-vector, decay mode.

Ref. M.Ronan, 1993 Tau Lepton Workshop & PR D ...

Page 55: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 55

20 Dec. 2004

Other e+e- Physics Applications

● TOPAZ-TPC

● ALEPH-TPC

● DELPHI-TPC

● PEP-II B-Factory Commissioning Mini-TPC

Page 56: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 56

20 Dec. 2004

The TOPAZ Detector at Tristan, KEK

Page 57: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 57

20 Dec. 2004

ALEPH

Presented by Ron Settles,TPC Symposium, Oct. 2003 see http://www-tpc.lbl.gov/symposium2003

Page 58: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 58

20 Dec. 2004

DELPHI

Presented by Vincent Lepeltier,TPC Symposium, Oct. 2003 see http://www-tpc.lbl.gov/symposium2003

Page 59: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 59

20 Dec. 2004

The “PTA” Collaboration

An informal collaboration of present and formet PEP-TPCfellows working on a commonanalysis of data from the

PEP / Topaz / Aleph TPC's

Mainly, M.R. PEP M. Yamauchi Topaz R. Itoh G. Cowan ALEPH

αS

Page 60: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 60

20 Dec. 2004

Page 61: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 61

20 Dec. 2004

PEP-II Commissioning Mini-TPC

● Designed to commission the PEP-II interaction region (IR).

● Tested up to 106 particles/cm2 in CERN test beam.

● Obtained complete Gating Grid (GG) opacity.

● Used to understand IR backgrounds in 1997 High-Energy Ring (HER) Commissioning by taking “snap-shots” of tracks in the Mini-TPC without distortions.

● Used to develop and test improved simulations of Asymmetric B-Factory backgrounds in e- HER / e+ LER colliding beam commissioning.

● Measured first Asymmetric e +e - annihilation event in 1998.

● Also used to commission the STAR IR at RHIC in 2000.

Berkeley, Cincinnati, Orsay Collaboration

Page 62: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 62

20 Dec. 2004

PEP-II Mini-TPC

Page 63: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 63

20 Dec. 2004

Drawings Simulation

PEP-II HER Commissioning Beam Line

Mini-TPC

Page 64: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 64

20 Dec. 2004

Event #1 Event #2

PEP-II HER Beam line simulation

⇒ Found that copper mask was hollow leading to a beam line hot spot near Mini-TPC location!

Copper mask

Mini-TPC Mini-TPC

Page 65: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 65

20 Dec. 2004

First Asymmetric e+e- annihilation event

e+ (3.1 GeV) e- (9 GeV)

PEP-II IR2 Commissioning

Page 66: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 66

20 Dec. 2004

Heavy Ion Physics Applications● EOS-TPC

– Fixed target experiment with “pads partout.”

– Heavy element dE/dx identification.

● NA49-TPC

– Many innovations: low mass field cage, front-end ASIC's.

● STAR-TPC

– Spectacular success: 4 m diameter “pads partout”, 2 m drifts and tremendous signal event track occupancies.

– Excellent particle identification and exciting physics.

● ALICE-TPC

– Many new developments: e.g. ALTRO chip (see Luciano Musa's talk at TPC Symposium, http://www-tpc.lbl.gov/symposium03).

Page 67: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 67

20 Dec. 2004

The EOS TPC

• Anode & field wires, w/Gating Grid

• 15,360 channels

• 12 mm x 8 mm pads

• Multiplicity goal ~200 tracks

1 m

1.5 m

• Cubic meter scale

• Inherits technology from PEP4

• Contemporary of NA35

Presented by Jim Thomas,TPC Symposium, Oct. 2003 see http://www-tpc.lbl.gov/symposium2003

E910 – fixed target in a magnetic field

Page 68: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 68

20 Dec. 2004

EOS at the Bevelac● Beautiful dE/dx spectra and good

dynamic range

● Space point resolution 300 m

● Unique features of EOS– Pad Readout

● Avoids projective problem at high Mult

● Accept pad response function broadening. Two track resolution ~ 2.5 cm

– Electronics● IC pre-amp with discrete shaper.

SCA as analog memory. External ADC.

● Optical fiber output & highly multiplexed

● Factor of 30 reduction per channel of outboard rack space

HISS - a heavy ion spectrometer

Page 69: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 69

20 Dec. 2004

Another Great Heavy-Ion TPC ● 4 TPCs, Main & Vertex● 3.9 meter height in Main

TPCs● 1.1 m drift in the Main TPCs● Vertex TPCs in the field,

Main TPCs not in the magnetic field

● 182,000 channels (all TPCs)

Presented by Jim Thomas,TPC Symposium, Oct. 2003 see http://www-tpc.lbl.gov/symposium2003

Page 70: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 70

20 Dec. 2004

The Birthplace of Many Great Ideas

● Main TPC Pad readout is at the top (to avoid dust)

● Asymmetric gap between GG, anodes, and pads. – Narrow pad response

function.● Pre-Amp & shaper on one chip. ● SCA and ADC on one chip.● Electronics uses direct

connection to pad plane.● Super simple field cage

– Al coated Mylar strips– Stretched over posts– Simplicity makes “BIG”

possible ● Low Diffusion & Fast Gas

[ Ar/CH4/C02, 90/5/5 ]Presented by Jim Thomas, TPC Symposium, Oct. 2003

Page 71: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 71

20 Dec. 2004

A TPC lies at the heart of STAR

Not Shown: pVPDs, ZDCs, PMD, and FPDs

Barrel EM Calorimeter

FTPCs

Time Projection Chamber

Silicon TrackerSVT & SSD

Endcap Calorimeter

Magnet

Coils

TPC Endcap & MWPC

Central Trigger Barrel & TOF

Beam Beam Counters

4.2 meters

Presented by Jim Thomas,TPC Symposium, Oct. 2003 see http://www-tpc.lbl.gov/symposium2003

Page 72: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 72

20 Dec. 2004

TPC Gas Volume & Electrostatic Field Cage

● Gas: P10 ( Ar-CH4 90%-10% ) @ 1 atm

● Voltage : - 28 kV at the central membrane 135 V/cm over 210 cm drift path

420 CM

Self supporting Inner Field Cage: Al on Kapton using Nomex honeycomb; 0.5% rad length

Page 73: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 73

20 Dec. 2004

Cathode Pad Plane: Outer and Inner Sectors

60 cm

190 cmOuter sector

6.2 × 19.5 mm pads3940 pads

Inner sector2.85 × 11.5 mm pads

1750 pads

● 24 sectors (12 on a side)

● Large pads good dE/dx resolution in the Outer sector

● Small pads for good two track resolution in the inner sector

Page 74: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 74

20 Dec. 2004

Readout of a Pad Plane Sector

A cosmic ray + delta electron

3 sigma threshold

Page 75: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 75

20 Dec. 2004

STAR-TPC Installation

Page 76: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 76

20 Dec. 2004

STAR-TPC Au-Au Event

A side view of tracks from 200 GeV per nucleon for a gold-on-gold collision at RHIC, as reconstructed in the TPC of the STAR experiment

From 2004 CERN Courier article bySpencer Klein, LBNL

Page 77: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 77

20 Dec. 2004

STAR Jet Physics …

Jet event in e+e− collision STAR-TPC Au+Au collision

It's easier to find jets in e+e-

Page 78: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 78

20 Dec. 2004

STAR-TPC Particle Identification by dE/dx

dE/ dx PI D r ange :

~ 0. 7 Ge V/ c f or K/ π

~ 1. 0 Ge V/ c f or K/ p

Anti - 3He

Page 79: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 79

20 Dec. 2004

International LC-TPC R&D

● TESLA CDR Detector / NLC ZDR Detector '96

● American Large (TPC) Detector '98-'99

● TESLA TDR Detector '01

● ILC Large Gaseous Detector Design Study '05 - ...

– Medium TPC Detector (European/American group)

– Large TPC Detector

– Huge (“Truly Large”) TPC Detector (Asian/American group)

● Micro-Pattern Gas Detector (MPGD) Studies '01 - ...

– GEM-TPC R&D

– Micromegas-TPC R&D

Page 80: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 80

20 Dec. 2004

TPC SymposiumBerkeley, Oct.2003

R.-D. HeuerHamburg University

TESLA TPC Proposalor

A TPC for a Linear Collider Detector

Page 81: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 81

20 Dec. 2004

ILC Gaseous TPC Detector ModelIt might look somethink like

Page 82: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 82

20 Dec. 2004Multijet Higgsstrahlung events e.g. e+e- --> Z + Higgs --> 2-4 jets

Page 83: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 83

20 Dec. 2004

TPC Tracker Design and R&D Current TPC design and R&D focus is on gas choice and readout technology.Hope to begin studying front-end electronics (FEE) designs soon.

Gas options: Ar CH4 Ar CO2 CH4 Ar CF4 ...

Readout pad plane Gating device ?? MPGD

GEMMicromegas

Pads partout

Electronics Very low noise Full integration ?

TPC

ECal

Endplane Gating grid ? MPGD Pad plane Support ...

FEE

ECal

Si disk

Page 84: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 84

20 Dec. 2004

Recent TPC developments

Page 85: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 85

20 Dec. 2004

GEM: Gas Electron MultiplierThin metal-coated polymer foil pierced by a high density of holes (50-100/mm2)

Typical geometry: 5 µm Cu on 50 µm Kapton, 70 µm holes at 140 mm pitch

F. Sauli, Nucl. Instrum. Methods A386(1997)531

70 µm

140 µm

Presented by Fabio Sauli, TPC Symposium, Oct. 2003 see http://www-tpc.lbl.gov/symposium2003

Page 86: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 86

20 Dec. 2004

GEM holes

Standard Double-Conical

70 µm

55 µm

5 µm

50 µm

Technology developed at CERN-EST

Page 87: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 87

20 Dec. 2004

200 V/cm

(Fields computed by S. Kappler)

Low field to high field: High field to high field:

2.5 kV/cm

2.5 kV/cm2.5 kV/cm

S. Bachmann et al, Charge amplification and transfer processes in the gas electron multiplierNucl. Instr. and Meth. A438(1999)376

Page 88: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 88

20 Dec. 2004

Micromegas: Micro-mesh Gas Structure

Presented by Yannis Giomataris,TPC Symposium, Oct. 2003 see http://www-tpc.lbl.gov/symposium2003

Page 89: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 89

20 Dec. 2004

Large dynamic range with gain stability

1

10

100

1000

10000

100000

1000000

0.001 0.01 0.1 1

Gain

Gap(mm)

300Volts

350 Volts

400 Volts

450 Volts

He + 6% Isobutane

Optimum gap : 30 - 100 microns

– Stable gain and relative immunity to flatness defects or pressure variation– Good energy resolution

Atmospheric pressure, theoretical curveAtmospheric pressure, theoretical curve

Ref: Y. Giomataris, NIM A419, p239 (1998)Ref: Y. Giomataris, NIM A419, p239 (1998)

109109CdCd

Good energy resolutionGood energy resolution

Ref: A. Delbart et al, NIM A461, p84 (2001)Ref: A. Delbart et al, NIM A461, p84 (2001)

pd/T

Page 90: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 90

20 Dec. 2004

International Linear Collider (ILC) Large-Area Micromegas TPC R&D

P. Colas, Y. Giomataris, V. Lepeltier & M. RonanBerkeley – Orsay – Saclay

Micromegas TPC R&D Collaboration

As presented atOrsay, Saclay, Rome & Frascati, Oct. 2004

andPurdue, Fermilab & Carleton, 15-19 Nov. 2004

Page 91: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 91

20 Dec. 2004

Chamber design and pad layout

2x10 mm2 pads

1024 pads

1x10 mm2 pads

Readout anode pad plane

Chamber

diameter 50 cm length 50 cm

Copper Mesh

50 µm pitch

50 µm gap

Page 92: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 92

20 Dec. 2004

1st Mass Production of Micromegas

1. Industrially mass produced MICROMEGAS using 3M’s FLEX

circuit technology2. Conical pillars ( 1 mm pitch) to

create a 50 mm gap.

-40

-20

0

20

40

60

-100 0 100 200 300 400 500 600

PILLAR2.TXT

B

Hei

ght (

mic

ron)

X-direction (micron)

50 micronheight

300 micron wide (mesh side)

35 micron

70-80 micron(anode side)

The flat area that has contactwith the anode board Pillar cross section profile

Purdue U.

Presented at ALCPG SLAC Jan. ’04

Page 93: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 93

20 Dec. 2004

1st Mass Production of Micromegas

100

1000

104

105

280 300 320 340 360 380 400 420

feb4_04gaincurve, Ar:DME=9:1, Drift=-500 V

Gas gain

Gas

gai

n

Mesh voltage (-V)

Fe55

Purdue U.

Presented at ALCPG Victoria July ’04

Radiation harness under study

First results Ar:DME 9:1

25 % energy resolution

Page 94: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 94

20 Dec. 2004

Gas Property Measurements● Drift velocity

We measure the drift velocity of different gases using the data itself. The longest drift time tracks observed are from tracks passing through the far end of the chamber, 50 cm from the readout plane.

● Electron attachment

Using the variation in the average energy deposition, measured by the truncated mean, with drift distance allows us to determine the electron attachment coefficient.

● Transverse diffusion

Measured through maximim likelihood fits to the distribution of signals on pads collecting ionization electrons from individual tracks. Relevant pads with no signals provide information as well.

● Magnetic field suppression

We measure the variation in the transverse diffusion as a function of the magnetic field to determine the suppression factor defined as (D

T[B]/D

T[0])-1/2 ~ ωτ.

From 2004 Rome IEEE Nuclear Science Symposium,Mike Ronan, LBNL see http://www-ilc.lbl.gov/detector/talks

Page 95: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 95

20 Dec. 2004

Ar CF4

Ar Isobutane Ar CH4 (P10)

Ar CH4 (P10)

(DT[B]/D

T[0])-1/2

B = 0.1T

B = 1.5T

B = 1T

B = 0.1T

B = 0.3T

Page 96: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 96

20 Dec. 2004

Measured Gas Properties

● Drift velocity First Micromegas TPC results @ B = 1T

We measure the drift velocities for the 3 gases being studied using the time distribution of cosmic ray tracks in our Micromegas TPC. We find at B = 1T

Ar-CF4: 3% vdrift

= 8.8 +- 0.2 (stat.) cm / µsec.

Ar-CH4: 10% vdrift

= 5.7 +- 0.1 (stat.) cm / µsec. ~ 10% systematic errors

Ar-Isobutane: 5% vdrift

= 4.4 +- 0.1 (stat.) cm / µsec.

Electron attachmentWe measure electron attachment by drift distance variation in the truncated mean.

Ar-CF4: 3% λattachment

> 4.4 m @ 90% confidence

● Transverse diffusionWe measure the diffusion from maximum fits to the track ionization spread on pads in each row.

We find at B = 1T

Ar-CF4: 3% DT = 75 +- 2 (stat.) +- 7 (sys.) µm / sqrt(cm)

Ar-CH4: 10% DT = 100 +- 1.4 (stat.) +- 10 (sys.) µm / sqrt(cm)

Ar-Isobutane: 5% DT = 160 +- 1.0 (stat.) +- 16 (sys.) µm / sqrt(cm)

Page 97: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 97

20 Dec. 2004

● Gas gain

We obtained high gains (~5000) at modest mesh voltages, 300-350 V, except for ArCH4:10% (P10).

● Electronic noise

We operated the STAR front end electronics at very low noise levels (~1000 e's), typically 1-2 ADC counts.

● Point resolution measurement

We determine the point resolution by comparing the position measurements of the two center 1mm pad rows, correcting for track angles and for track fitting errors. The resolution measurements are binned in drift distance and fit with a linear dependence. We take the zero drift interept as the intrinsic Micromegas position resolution.

Micromegas TPC Performance

Note: We measure intrinsic (“zero-drift”) Micromegas resolutions of 60-100 microns, even with ArCH4 (P10) operating at low gain (~1000) as shown above.

Page 98: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 98

20 Dec. 2004 Transverse position resolution measurements

For near vertical tracks at small angles, we measure Micromegas intrinsic(“zero drift”) resolutions of roughly 60, 80 and 100 microns for Ar-CF4,Ar-CH4 and Ar-Isobutane gas mixtures, respectively.

We measure a large (X2) angular dependence of theresolution due to our elongated 1X10 mm2 anode pads.

We obtain position resolutions as small as60 - 80 microns for near vertical tracks usingour 1X10 mm2 pads.

B = 1T

B = 1T

Anode pads1X10 mm2

σ (µm)

σ (µm)

Distance [cm]ϕ (rad.)

Page 99: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 99

20 Dec. 2004

Summary● An exciting 25 years of fun and profit

– New inventions: Time Projection Chamber, Asymmetric B Factory

– State of the art detectors, electronics and software.

– Operated TPC experiment for 10 years under challenging conditions.

– Built significant machine components (e.g. Injection Timing & Controls)

– Interesting Jet, Tau, Hadron spectroscopy and Two-photon physics.

– Many very talented friends, colleagues, engineers and students.

– However, no major discovery at PEP-I !

● And an exciting future lies ahead

– Many new Micro-Pattern Gas Detector (MPGD) based TPC's.

– ILC Large TPC detector design, R&D and construction.

– Precision measurements of the Higgs boson in an accelerator-based laboratory environment.

Page 100: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 100

20 Dec. 2004

Concluding Remarks● Dave Nygren● Pier Oddone Fermilab Today, 18-19 Nov. 2004

see http://www.fnal.gov/pub/today

● Mike Ronan● A View of the ILC for the Next 10 Years or so● 2 nd Time Projection Chamber Symposium

see http://www-tpc.lbl.gov/symposium05

Page 101: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 101

20 Dec. 2004

Dave Nygren

Dave Nygren in M.R.'s office3 Nov. 2004

Dave Nygren (left) and Fred Catania during TPC detectorassembly in PEP IR2 at SLAC, circa 1980.

Dave at the LBL (Berkeley) TPC Symposium17 Oct. 2003

1985 E.O. Lawrence &1998 Panofsky prizes

Page 102: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 102

20 Dec. 2004

Fermilab Today 18-19 Nov. 2004

Pier Oddone2005 Panofsky prize

Page 103: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 103

20 Dec. 2004

Michael T. Ronan1971-1976 1. Fermilab E365 Thesis: “J/Psi(3100) Production by Pion and Protons” Joined LBL Group A (old Alvarez group).

1976-1986 2. SPEAR Lead Glass Wall Experiment * Discovery of “Decay Mode J/ψ(3100) → γgg” with T.Trippe, LBL Ref. 1979 Fermilab Lepton Photon Symposium, pg. 610. 3. PEP-4 TPC Experiment * Design of TPC “Ripple” trigger * Ran experiment 1983-1991

1987-1994 4. PEP-4/9 TPC/2γ Experiment * Co-Spokesman with Elliott Bloom, SLAC * Spokesman from 1991-1994 * Expert on Tau and Two-photon physics with many Jet physis publications

1995-present 5. PEP-II BaBar Experiment * Conceptual and Engineering Design of PEP II Injection Timing and Control System

1992-2004 6. American Next Linear Collider Physics & TPC Detector Studies * World expert of Java programming for HEP.2004- 7. Co-Leader of International LC (ILC) Large Gaseous (TPC) Detector Design

Student of Luis Alvarez

Spokes. L.Galtieri & M.Perl

Also, Feb. '99 CalTech talk Spokes. D.Nygren, P.Oddone

w/ R.Settles, T.Matsuda et al.

Page 104: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 104

20 Dec. 2004

The Next 10 years or so (2005-2017)2004-2005 ILC Technology choice for Superconducting RF, Aug. '04 Paris TPC workshop, 20-21 Dec. '04 Berkeley Generic TPC R&D meeting, 23-24 Apr. '05 2nd Time Projection Chamber Symposium, Oct. '05 ?? ...

2006-2007

2008-2009 LHC & Detectors Fully Operational2010-2011

2012-2013

2014-2015 ILC & Large TPC Detector, ... Operational

2016-2017 First comparisons of LHC and ILC results

Page 105: Early TPC History and Recent Developmentsbusto/MondayAM1/Ronan.pdf · Early TPC History and Recent Developments Michael T ... TPC Gating Grid A TPC gating ... knocking out a string

M.T. Ronan, 2004 Paris TPC Workshop 105

20 Dec. 2004