e4 hpc workshop 2012
TRANSCRIPT
CCMMMA:
Weather and Coastal ocean monitoring center
HPC-GPU Cluster BlackJeans
Hereafter, ...
2 G. Agrillo - CCMMMA - E4 HPC
Workshop 2012
3 G. Agrillo - CCMMMA - E4 HPC
Workshop 2012
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 4
Rapporto di nesting 1:3 (27-9-3)
• d01, mesh europea a 27 Km
• d02, mesh nazionale a 9 Km
• d03, mesh regionale a 3 Km
• d04, mesh locale ad 1 Km
Rapporto di nesting 1:5 (25-5-1)
• d01, mesh nazionale a 25 Km
• d02, mesh regionale a 5 Km
• d03, mesh locale ad 1 Km
Campi di vento, copertura nuvolosa, pioggia e...NEVE!
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 5 5
SO2 [ppb]
Postproc
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 6
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 7
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 8
Weather stations
Oceanographic buoy
SeaSonde HF radar station
Weather Radar
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 9
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 10
The HPC-GPU BlackJeans is configurated as followed:
N.12 computing node E7122, 2 x Xeon SixCore X5650, 6 RAM modules DDR3-1333 4GB. Every computing nodes have a GPU NVIDIA Tesla M2050;
N.1 Network Attached Storage (NAS) fiber channel;
N.1 headnode E7122, 2 x Xeon 5506 QuadCore E5506, 6 RAM modules DDR3-1333 1GB;
N.1 Switch Infiniband Qlogic 122000 36 porte QDR;
N.1 Switch Gigabit Ethernet L2 ES4524D,
SMC 8126L2 10/100/1000, 24 ports;
N.1 Switch KVM AR731 16 ports AT.
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 11
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 12
13 G. Agrillo - CCMMMA - E4 HPC
Workshop 2012
Improve load balancing of modeling work flow;
Improve of management of model and instruments data;
Deploy and test new model;
Expand storage capability;
Expand the computing nodes;
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 14
G. Agrillo - CCMMMA - E4 HPC Workshop 2012 15