e0200 - compression

Upload: edgar-cano-franco

Post on 03-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 E0200 - Compression

    1/31

  • 8/12/2019 E0200 - Compression

    2/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    )"oid locationslandmar/s listed on or eligi

  • 8/12/2019 E0200 - Compression

    3/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    4.2.1.5. )t a minimum9 to monuments s&all

  • 8/12/2019 E0200 - Compression

    4/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    n determining

  • 8/12/2019 E0200 - Compression

    5/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    4.4.1.(. :eer to En+ineerin+ Discipline E!200 Civil $nd Str)ct)r$l9Su

  • 8/12/2019 E0200 - Compression

    6/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    4.$. #uel Gas and Aeter uildings

    #uel gas and meter

  • 8/12/2019 E0200 - Compression

    7/31

  • 8/12/2019 E0200 - Compression

    8/31

  • 8/12/2019 E0200 - Compression

    9/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    :eer to T.pic$l Dr$6in+ T

  • 8/12/2019 E0200 - Compression

    10/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    spacing and s&all not &a"e less t&an 1++D lo area it& t&e ire a

  • 8/12/2019 E0200 - Compression

    11/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    6.$.1.4. :elie "al"e and "ent piping s&all conorm to 4( C#: 1(2.16(.

    6.$.1.5. :eer to En+ineerin+ Discipline E!900 , #verpress)re7rotection $nd Relievin+ Devices or more inormation on relie "al"erequirements.

    6.$.1.6. !ent "al"es s&all

  • 8/12/2019 E0200 - Compression

    12/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    ) relie "al"e s&all

  • 8/12/2019 E0200 - Compression

    13/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    Aanual9 loc8in+9 ull'open

  • 8/12/2019 E0200 - Compression

    14/31

  • 8/12/2019 E0200 - Compression

    15/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    (.1.1.5. 7&readed ittings are only alloed in a

  • 8/12/2019 E0200 - Compression

    16/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    ,il le"el and temperature monitoring

    )ir pressure and temperature monitoring

    7aps or perormance monitoring

    Aotor current

    Lo or &ig& supply "oltage :unning status

    Aalunction contact

    :emote startstop

    ,t&er site'speciic parameters

    (.5. )ir *ryers and :elated Equipment

    7&e compressed air dryer s&all #lamma

  • 8/12/2019 E0200 - Compression

    17/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    Storage tan/s s&all

  • 8/12/2019 E0200 - Compression

    18/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    !!' $ter S.stems

    11.1. -ater Piping ' General

    )ll ater piping it&in gas compressor stations s&all

  • 8/12/2019 E0200 - Compression

    19/31

  • 8/12/2019 E0200 - Compression

    20/31

  • 8/12/2019 E0200 - Compression

    21/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    12.2.1.1. #or e0&aust systems it& catalysts9 sampling ports s&all

  • 8/12/2019 E0200 - Compression

    22/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    13.5. *ocumentation

    7&e contractor s&all pro"ide one electronic and t&ree &ard'copies o t&e olloing=

    Stress )nalysis List

    )ll computeriBed and &and analysis and isometrics t&at ailed test requirements

    )ll computeriBed and &and analysis and isometrics t&at passed test requirements

    )ll ritten recommendations and directi"es

    )ll recommended supports

    13.6. -arranties

    7&e Contractor s&all arrant t&at t&e completed analysis meets perormance and conditions as set ort&in applica

  • 8/12/2019 E0200 - Compression

    23/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    #ull'

  • 8/12/2019 E0200 - Compression

    24/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    15.1.1.12. Eac& station sidegate "al"e s&all

  • 8/12/2019 E0200 - Compression

    25/31

  • 8/12/2019 E0200 - Compression

    26/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    1.1.1.5. Lo gas le"el detection in t&e

  • 8/12/2019 E0200 - Compression

    27/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    1.3.1.3. ,t&er uildings

    #ire detected in t&e control room s&all cause a ire alarm and issue a

    callout.

    #ire detected in t&e ser"iceau0iliary

  • 8/12/2019 E0200 - Compression

    28/31

  • 8/12/2019 E0200 - Compression

    29/31

  • 8/12/2019 E0200 - Compression

    30/31

  • 8/12/2019 E0200 - Compression

    31/31

    Section: E0200Title: Compression

    ENGINEERING DESIGN MANUAL Revised: 2009!!0!MA"#R DESIGN INSTALLATI#NS

    "e&icles entering t&e acility to