environmentwashington.apwa.net/content/chapters/washington.apwa.net...senior project manager...
TRANSCRIPT
ENVIRONMENT Less than $5M | $5-$25M
Manchester Stormwater Park WINNER: Environment | Less than $5M AGENCY: Kitsap County TEAM: • Managing Agency Chris May Stormwater Division Program Manager Kitsap County • Primary Contractor Chris Quesenbury Project Manager Northwest Cascade, Inc. • Primary Consultant David Dinkuhn Project Manager Parametrix
Manchester Stormwater Park WINNER: Environment | Less than $5M
Spiral Rain Garden
Unusual Lighting New Outfall
Treatment Cell
Lyon Creek Flood Mitigation Project WINNER: Environment | $5M - $25M AGENCY: City of Lake Forest Park TEAM: • Managing Agency Aaron Halverson Environmental Programs Manager City of Lake Forest Park
• Primary Contractor Kelly Lynn Bosa President KLB Construction, Inc.
• Primary Consultant Erik Davido, PE President Davido Consulting Group, Inc.
Lyon Creek Flood Mitigation Project WINNER: Environment | $5M - $25M
Culvert L30 - Before Culvert L30 - After
60 hrs – 20’ Culvert Replaced
Restored Wetland with Boardwalk
Lynden Water Treatment Plant WINNER: Environment | $25M – $75M
AGENCY: City of Lynden TEAM: • Managing Agency Steve Banham, PE Public Works Director City of Lynden
• Primary Contractor CJ Handforth Senior Project Manager IMCO General Construction, Inc.
• Primary Consultant Reno Fiorante, P.Eng., PE Senior Vice President Stantec Consulting Service Inc.
Lynden Water Treatment Plant WINNER: Environment | $25M - $75M
Flocculation & Sedimentation Area
Filter Backwash Scour Blowers Lime System
Sodium Hypochlorite Generation
TRANSPORTATION Less than $5M | $5-$25M
Park Lane Pedestrian Enhancements WINNER: Transportation | Less than $5M AGENCY: City of Kirkland TEAM: • Managing Agency Frank Reinart, PE Project Engineer City of Kirkland
• Primary Contractor David Marshbank CEO Marshbank Construction
• Primary Consultant Kurt Ahrensfeld, PE Project Manager Perteet Inc.
Park Lane Pedestrian Enhancements WINNER: Transportation | Less than $5M
Local school posters on temp fence.
Rotating art installations.
Pavers minimize disruption.
Railroad Grade Separations WINNER: Transportation | $5M - $25M
AGENCY: City of Yakima TEAM: • Managing Agency Brett Sheffield, PE Chief Engineer City of Yakima
• Primary Contractor Lincoln Grade David Haight Project Manager Apollo, Inc.
• Primary Consultant Bob Fernandes, PE, SE Vice President BergerABAM
• Primary Contractor MLK Grade
Ryan Olson, PE Project Manager Mowat Construction Co.
Railroad Grade Separations WINNER: Transportation | $5M - $25M
Drilling: Pile Wall & Seal 3 Access Bridges
Before After
STRUCTURES $5M - $25M
Saltwater State Park Bridge Seismic Retrofit WINNER: Structures | $5M - $25M AGENCY: City of Des Moines TEAM: • Managing Agency Daniel J. Brewer, PE, PTOE Public Works Director City of Des Moines
• Primary Contractor Peter J. Kenney Project Manager Road Construction Northwest, Inc.
• Primary Consultant Roger Horton Senior Project Manager Exeltech Consulting, Inc.
Saltwater State Park Bridge Seismic Retrofit WINNER: Structures | $5M - $25M
Radar marking of existing reinforcing bars.
Trail open throughout.
CFR Wrap of Piers
EMERGENCY $5M - $25M
Flood Protection Project WINNER: Emergency | $5M - $25M AGENCY: City of Tacoma TEAM: • Managing Agency Eric Johnson, PE Assistant Division Manager City of Tacoma, Environmental Services
• Primary Contractor Tyler Kimberly President IMCO General Contractor
• Primary Consultant Ken Green, PE Senior Geotechnical Engineer CH2M Hill
Flood Protection Project WINNER: Emergency | $5M - $25M
Community Outreach
Removable Flood Gate
Sheet Pile Installation Water Main
HISTORIC Less than $5M
Portal Way/Dakota Bridge No. 500 WINNER: Emergency | Less than $5M AGENCY: Whatcom County TEAM: • Managing Agency James Lee, PE Engineering Manager Whatcom County Public Works
• Primary Contractor Jake Oullette Project Manager Stellar J Corporation
• Primary Consultant Chuck Spry Senior Project Manager BergerABAM
Seismic Retrofit
Under Deck Access Platform Night Installation at Low Tide
Bearing Pad Installation
Portal Way/Dakota Bridge No. 500 WINNER: Emergency | Less than $5M
Seismic Retrofit