2/17/2011 1 Report Overview February 18, 2011 ` Thomas R. Warne, PE, Chairman; Tom Warne & Associates ` Scott Ashford PE PhD; Oregon State ` Scott Ashford, PE, PhD; Oregon State University ` Benjamin Beerman, PE ; FHWA ` John Buchheit, PE, DBIA; FTA(PMOC) ` David Goodyear, PE, Chief Bridge Engineer; T.Y.Lin ` Siegfried Hopf, Chief Bridge Engineer; Leonhardt, Andra & Partners

Upload: others

Post on 18-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

1

Report OverviewFebruary 18, 2011y ,

Thomas R. Warne, PE, Chairman; Tom Warne & AssociatesScott Ashford PE PhD; Oregon StateScott Ashford, PE, PhD; Oregon State UniversityBenjamin Beerman, PE ; FHWAJohn Buchheit, PE, DBIA; FTA(PMOC)David Goodyear, PE, Chief Bridge y , , gEngineer; T.Y.LinSiegfried Hopf, Chief Bridge Engineer; Leonhardt, Andra & Partners

Page 2: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

2

Bruce Johnson, PE; ODOTJugesh Kapur PE; WSDOTJugesh Kapur, PE; WSDOTWesley King, High Capacity Transit Project Mgr; C-TRANCalvin Lee, PE; TriMetJohn McAvoy, Major Project Mgr; FHWAJ y, j j g ;Mary Lou Ralls, PE; Ralls Newman, LLC

Joe Showers, PE, Business Group Technical Mgr; CH2M HillTechnical Mgr; CH2M HillSteve Stroh, PE, Deputy Director of Surface Transportation, Major Bridges; URSSteve Thoman, PE, Principle Bridge Engineer; Independent Consultant Theodore Zoli, PE; HNTB

Page 3: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

3

Given the constraints imposed on the project evaluate possible bridge types that would p g ypmeet these constraintsIf the constraints are modified, are there other bridge types that should be consideredGiven the outcomes of 1 and 2 evaluate cost, risk, constructability, and aesthetics for

i l b idpotential bridge types

November 3-4, 2010◦ Orientation and workshop

f◦ Review of bridge types and other technical analysisDecember 15-16, 2010◦ Summarize work to date and possible bridge types◦ Perform the alternatives analysis on the agreed

upon bridge typesJanuary 18-19, 2011

C t t bilit i◦ Constructability review◦ Risk reviewFinal report-Delivered on February 3, 2011

Page 4: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

4

Technically Sound – ConstructibleTechnically Sound Constructible

Meets Environmental Commitments

Cost Effective

Achieves Aesthetic Goals

Air space

Navigational Clearance

Navigation Channel Location

Minimized Footprint for Funding and Environmental

Horizontal Alignment

Staged Construction

Page 5: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

5

Vancouver Historic Preserve, including Appletree Park

More in Water Impact

Large Increase in Shadow Impact

BNSF Railroad on North Side

Traffic in Closed Box

LRT

Environmental Aviation

Navigation Opportunity

Page 6: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

6

Operational ReliabilitySeismic VulnerabilitySeismic VulnerabilityGetting Buy-In From Political and Citizen Groups if changes are recommended to the Current Design ConceptMaintenance and Inspection Challenges with the p gCurrently Proposed Bridge TypeCost Uncertainty with Current Bridge Type

Page 7: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

7

Total Estimated Cost: $3.2-3.55 billionCost of LRT**: $830-920 millionCost o $830 9 0 oCost of the bridge: $740-820 millionCost of roadway and interchanges: $1.63-1.81 billion

*Costs are for the 60% and 90% CEVP rangeg**Costs for LRT elements including track,

electrification, stations, etc.

Page 8: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

8

Open-Web Box Girder

Enhanced Open-Web Box Girder

Other Bridge Alternatives

Independent analysis performed to assess technical viabilityassess technical viabilityExplored options for resolving technical issues-unsatisfactory resultsBRP developed the enhanced open-web as an alternative-it was still unsatisfactoryLed to the development of the composite deck truss

Page 9: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

9

BRP recommends to discontinue further design on the Open-Web Box g pGirder because:◦Of unresolved technical issues◦ Considerable risks associated with the design, construction and long-term performancep◦ Too costly with potential for substantial cost overruns

Page 10: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

10

Page 11: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

11

Page 12: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

12

Page 13: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

13

Page 14: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

14

Open-web box girder $440,000,000

Tied Arch $430,000,000

Cable-Stayed $390,000,000

Composite Deck Truss $340,000,000*2011 dollars, no adjustments

Olivia Bucks; The Oregonian, 2008; Pilots at Pearson Field in Vancouver keep watch on new Interstate 5 bridge plans; Nov. 11. 2010; OregonLive.com

Page 15: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

15

Dean Baker; Special to the Oregonian; Pilots at Pearson Field in Vancouver keep watch on new Interstate 5 bridge plans; Nov. 11. 2010; OregonLive.com

Page 16: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

16

Page 17: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

17

Open-web box girder 12

Cable-Stayed Bridge 3

Tied Arch Bridge 4

Composite Deck Truss 10

Open-web box girder 58,500 SF

Cable-Stayed Bridge 52,500 SF

Tied Arch Bridge 60,000 SF

Composite Deck Truss 44,000 SF

Page 18: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

18

Open-Web Box Girder 4

Cable-Stayed Bridge 2

Tied Arch Bridge 3

Composite Deck Truss 1

Open-Web Box Girder 1

Cable-Stayed Bridge 2

Tied Arch Bridge 2

Composite Deck Truss 1

Page 19: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

19

Open-Web Box Girder 4

Cable-Stayed Bridge 2

Tied Arch Bridge 2

Composite Deck Truss 1

Open-Web Box Girder 4

Cable-Stayed Bridge 1

Tied Arch Bridge 2

Composite Deck Truss 1

Page 20: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

20

Open-Web Box Girder 3

Cable-Stayed Bridge 3

Tied Arch Bridge 3

Composite Deck Truss 1

Open-Web Box Girder 4

Cable-Stayed Bridge 2

Tied Arch Bridge 3

Composite Deck Truss 1

Page 21: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

21

Open-Web Box Girder (4, 1, 4, 4, 3, 4)

Cable-Stayed Bridge (2, 2, 2, 1, 3, 2)

Tied Arch Bridge (3, 2, 2, 2, 3, 3)

Composite Deck Truss (1, 1, 1, 1, 1, 1)

Page 22: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

22

Recommendation 1: Discontinue any further design or planning work on g p gthe open-web box girder bridge alternative.

Recommendation 2: Select a new bridge type from among three feasiblebridge type from among three feasible alternatives: cable-stayed, tied arch and composite deck truss.

Page 23: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

23

Recommendation 3: Proceed with further analysis and public review of y precommended alternatives in order to select a preferred bridge type.

Recommendation 4: Work with the Federal Aviation Administration toFederal Aviation Administration to resolve airspace issues with Pearson Field relating to either the cable-stayed or arch bridge designs.

Recommendation 5: Develop a tangent (straight) alignment for thetangent (straight) alignment for the main river crossing downstream of the existing bridges.

Recommendation 6: Replace the North Portland Harbor Bridge.

Page 24: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

24

Review interchanges and ramps throughout the corridorgReview the schedule to avoid impacting the Record of DecisionAddress seismic design criteria for the new I-5 bridge and the North Portland Harbor BridgeHarbor BridgeAddress other design standards for all elements of the corridor

Submitted on February 3, 2011Governors Gregoire and KitzhaberGovernors Gregoire and Kitzhaber remain strong advocates of the projectThey have accepted the report and have directed the DOTs as follows:◦Discontinue design work on the Open-Web Box Girder◦ Conduct an expedited review of the three recommended bridge types

Page 25: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

25

The review should consider the following and recommend a bridgefollowing and recommend a bridge type by the week of February 21:◦ Is the most affordable,◦Maintains the project schedule,◦Minimizes environmental impacts,◦Honors commitments to stakeholders, and ◦ Provides the least risk.

Page 26: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

26

Page 27: e. Project Sponsors Council Meeting Materials (5 of 8 ... · Orientation and workshop Review of bridge types and other technical analysis `December 15-16, 2010 Summarize work to date

2/17/2011

27

Report OverviewFebruary 17, 2011y ,