dynamic positioning conference october 14-15, 2014 · 2015. 5. 27. · dynamic positioning...
TRANSCRIPT
DYNAMIC POSITIONING CONFERENCEOctober 14-15, 2014
RELIABILITY
Applying Agile to DP FMEAs
Return to Session Menu
Ajay Kaushik Prakash Chavan
APPLYING AGILE TO DP FMEA’S
- Ajay Kaushik- Prakash Chavan
Agenda 1. What is Agile Methodology 2. Why apply Agile to DP FMEA’s 3. How to apply Agile to DP FMEA’s4. FMEA Process Improvements5. Risk Management 6. Conclusion
WHAT IS AGILE METHODOLOGY?
• Agile management or agile project management is an iterative and incremental method of managing the design and build activities for engineering, information technology, and new product or service development projects in a highly flexible and interactive manner.(Wikipedia)
• Part of the delight in using agile methods is the ability to escape from the boundaries of process, procedure, policy, practices and politics and do what is needed in whatever way makes the most sense to get the job done. (Parker)
Focus on Iterative and IncrementalHighly Flexible and InteractiveSmaller Deliverables
WHY APPLY AGILE TO DP FMEA’S?
FMEA CONSULTANT
What Format ?FMEA Vs FMECA?
Worksheet Format?
Sub-System Format?
Sea-Trials Test Format ?
Which Guidelines & Standards?
MTS, IMCA, DNV, ABS, BV, Lyods, IRS
etc.
Which Editor?Microsoft Word
ExcelOpen Office
Reuse old data in new format?
Block Diagram or Boundary Diagram?
Things to Track !
Concerns RegisterConcerns Register
Maintenance Register
Recommendations
& Action Taken
Register
Owner Review & Comments Tracking
How To Apply Agile To DP FMEA’s
Sprint Planning Execution Sprint Review Deliver
Average5 DaySprint
OWNER FEEDBACK
Acceptance Criteria
System Boundary
Design Intent
Operational Modes
Block Diagram
Fire and Flood Protection Analysis
FMEA WorkSheets
Sub-System Testing
Summary
Compliance Statement
Technical Query Register
Test Cases
Attachments
Configurations
Sta
ndar
dize
d S
ub-S
ectio
ns /
Wor
kshe
ets
DN
V-R
P-D
102
Worksheets
Sections
Diagrams
Causes
Effects
Detect.
FATDockSea-Tr.
Sim.
RPN
Registers
Conclusions
Reco’s
Assump.Mainten.Concern
Query
Sprint DEBT
Sub-System Sprint Overview
Inputs Available
Drawings
Design Docs
Datasheets
Elect.
Mech.
Struc.
Instal.
How To Apply Agile To DP FMEA’s
Vessel FMEA Initiation
To Do(Rolling List)
Initiation
Class Review
Executive Summary
Introduction
Vessel Information
Vessel Application
Operating Env. Conditions
Scope Of FMEA
WCFDI
SYSTEMS
Power Systems
Machinery Systems
Thruster Systems
Power Systems
Engine Systems
DP System
Emergency Stops
Other Systems
CAMO
TAM
Recommendations
Conclusions
Appendices
CLASS FEEDBACK
FOR REVIEWFMEA REPORT(VERSION – X)
APPROVEDFMEA-REPORT & SEA TRIALS
ANNUAL SEA-TRIALS AND
TEST RESULTS
Final Report& Maintenance
Stan
dard
ized
repo
rt st
ruct
ure
as p
er s
peci
ficat
ions
issu
ed b
y M
TS /
DN
V-G
L / A
BS /
LYO
DS
/ BV
FMEA DEVELOPMENT USING AGILE PHILOSOPHY
Electrical Sub-System
Doing Sprint To Do Sprint Doing Sprint Review Deliver
Average10-12 Day
Sprint
OWNER FEEDBACK
Acceptance Criteria
System Boundary
Design Intent
Operational Modes
Block Diagram
Fire and Flood Protection Analysis
FMEA WorkSheets
Sub-System Testing
Summary
Compliance Statement
Technical Query Register
Test Cases
Attachments
Configurations
Stan
dard
ized
Sub
-Sec
tions
/ W
orks
heet
s D
NV-
RP-
D10
2
Worksheets
Sections
Diagrams
Causes
Effects
Detect.
FATDockSea-Tr.
Sim.
RPN
Registers
Conclusions
Reco’s
Assump.Mainten.Concern
Query
Machinery Sub-System
Doing Sprint To Do Sprint Doing Sprint Review Deliver
Average2-3 DaySprint
OWNER FEEDBACK
Acceptance Criteria
System Boundary
Design Intent
Operational Modes
Block Diagram
Fire and Flood Protection Analysis
FMEA WorkSheets
Sub-System Testing
Summary
Compliance Statement
Technical Query Register
Stan
dard
ized
Sub
-Sec
tions
/ W
orks
heet
s D
NV-
RP-
D10
2
Test Cases
Attachments
Configurations
Worksheets
Sections
Diagrams
Causes
Effects
Detect.
FATDockSea-Tr.
Sim.
RPN
Registers
Conclusions
Reco’s
Assump.Mainten.Concern
Query
FMEA Process Improvements
Risk Management
Conclusion !
www.varivid.com