dyckman avenue over black river: a movable bridge...

50
Dyckman Avenue over Black River: A Movable Bridge Rehabilitation South Haven, Michigan March 23, 2016 Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 1

Upload: doantuyen

Post on 12-May-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Dyckman Avenueover Black River:A Movable Bridge

RehabilitationSouth Haven, Michigan

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 1

Page 2: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Project Location

• History

• Condition Assessment

• Funding

• Design

• Construction

• Acknowledgements

• Questions

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 2

Summary of Presentation

Page 3: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Location of South Haven, Michigan

Project Location

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 3

Page 4: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Location of Dyckman Ave Bridge

Project Location

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 4

Page 5: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Four Movable Bridges at Dyckman Avenue

crossing of the Black River

• First Bridge constructed in 1856

• Construction cost was $1,120

• Timber drawbridge

• Second Bridge constructed in 1877

• Timber drawbridge

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 5

History

Page 6: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Third Bridge constructed in 1890

• Steel through Truss Swing Bridge

• In service for 78 years

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 6

History

Page 7: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Current Bridge constructed in 1967-68

• Designed by State Highway Department

• Cost of Construction was $782,157

• Double Bascule Span

• Hydraulic Cylinders as Prime Mover

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 7

History

Page 8: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

General Plan of Structure

History

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 8

Page 9: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Approach Span Construction

History

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 9

Page 10: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Bascule Span Installation

History

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 10

Page 11: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Identify Scope of Rehabilitation Needs

• Review 1993 Repairs

• Work Started in 2007

• Efforts Continued through 2010

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 11

Condition Assessment

Page 12: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Concrete Deck

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 12

Page 13: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Traffic Gate Operator

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 13

Page 14: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Bascule Span Sidewalk

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 14

Page 15: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Bascule Span Deck Grating

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 15

Page 16: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Floor Beams

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 16

Page 17: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Main Cylinder

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 17

Page 18: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Brake Cylinder

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 18

Page 19: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Position Sensor

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 19

Page 20: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Tail Bearing

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 20

Page 21: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Hydraulic Power Unit

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 21

Page 22: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Hydraulic Controls

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 22

Page 23: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Hydraulic Control Tubing

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 23

Page 24: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Submarine Cables

Condition Assessment

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 24

Page 25: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Concrete Deck Overlay

• Riveted Steel Grid Deck and Floor Beams

• Non-skid Steel Plate Sidewalks

• Submarine Cables

• Hydraulic Cylinders, Power Units, and Controls

• Scour Countermeasures

• Shimming and Balancing

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 25

Condition Assessment

Page 26: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Local Bridge Program Application Submitted in 2009, 2010, and 2011

• Regional Bridge Council Commitment

• Movable Bridges considered Major Structures

• Selected for Funding in 2014 FY

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 26

Funding

Page 27: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Total Construction Cost - $2,498,500

• Local Bridge Program - $1,573,200

• Small Urban Program - $375,000

• Local Funding - $550,300

• Engineering Fees - $607,500

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 27

Funding

Page 28: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• Great Lakes Engineering Group, LLC – Underwater Inspection/Scour Mitigation

• Hardesty & Hanover – Structural, Mechanical & Electrical Engineering

• City Staff – Traffic Control Plan

• Spicer Group – Construction Observation & Administration

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 28

Design Phase

Page 29: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Open Steel Grid Decking

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 29

Page 30: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Non-skid Steel Plate Sidewalks

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 30

Page 31: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Hydraulic Schematic

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 31

Page 32: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Electric Schematic

Design Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 32

Page 33: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• 2014-15 Winter Construction

• Construction started October 13, 2014

• Completion date of April 30, 2015

• Long Lead Time Items: Hydraulic Cylinders and Open Steel Grid Decking

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 33

Construction Phase

Page 34: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Deck Removals

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 34

Page 35: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

New Floor Beams

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 35

Page 36: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Steel Curb Beam

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 36

Page 37: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Open Steel Deck Grid

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 37

Page 38: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Open Steel Grid Deck

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 38

Page 39: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Non-skid Steel Plate Sidewalks

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 39

Page 40: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Submarine Cable

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 40

Page 41: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Submarine Cable

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 41

Page 42: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Hydraulic Power Unit

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 42

Page 43: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Hydraulic Control Valves

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 43

Page 44: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Programmable Logic Controller

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 44

Page 45: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Main Hydraulic Cylinder

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 45

Page 46: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Tail Lock Cylinder

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 46

Page 47: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 47

Page 48: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

Video of Opening

Construction Phase

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 48

Page 49: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

• MDOT Staff

• RBC and LBAB Volunteers

• Consultants

• Contractor (Anlaan Corporation)

• Citizens of South Haven

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 49

Acknowledgements

Page 50: Dyckman Avenue over Black River: A Movable Bridge ...ctt.mtu.edu/sites/ctt/files/resources/bridge2016/conference/04h... · over Black River: A Movable Bridge Rehabilitation South

March 23, 2016Dyckman Avenue Bascule Bridge Rehabilitation 2014-15 50

Questions