duvha power station · duvha power station monthly emissions report atmospheric emission license...

14
Generation Nkangala District Municipality Date: 2020/05/22 P O Box 437 Middleburg Enquiries: Duvha Environmental Management 1050 +27 13 690 0445 +27 66 212 2105 Attention: Mr V Mahlangu Enquiries: Ms Simthandile Nhlapo +27 13 690 0445 AND +27 66 212 2105 Directorate: Air Quality Management Services The Chief Director: Mr S S Maluleka Department of Environmental Services Total number of pages: 14 Private Bag X447 PRETORIA 0001 Tel: (012) 310 3263 Total number of annexes:1 Fax: (012) 320 0488 DUVHA POWER STATION Atmospheric Emission License 17/4/AEL/MP312/11/07 GENERAL MANAGER DATE 2020-06-08

Upload: others

Post on 18-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

Generation

Nkangala District Municipality

Date: 2020/05/22

P O Box 437

Middleburg

Enquiries: Duvha Environmental Management

1050

+27 13 690 0445

+27 66 212 2105

Attention:

Mr V Mahlangu

Enquiries: Ms Simthandile Nhlapo

+27 13 690 0445

AND

+27 66 212 2105

Directorate: Air Quality Management Services

The Chief Director:

Mr S S Maluleka

Department of Environmental Services

Total number of pages: 14

Private Bag X447

PRETORIA

0001

Tel: (012) 310 3263

Total number of annexes:1

Fax: (012) 320 0488

DUVHA POWER STATION

Atmospheric Emission License 17/4/AEL/MP312/11/07

GENERAL MANAGER DATE

2020-06-08

Page 2: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

SEPTEMBER 2019

DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07

1 RAW MATERIALS AND PRODUCTS

Raw Materials and Products

Raw Material Type

Units Maximum Permitted Consumption Rate

Consumption Rate Sep-2019

Coal Tons 1 400 000 571 186

Fuel Oil Tons 5 000 3754.05

Production Rates

Product / By-Product Name

Units Maximum Production Capacity Permitted

Production Rate Sep-2019

Energy GWh 3600 973.73

Ash Tons not specified 160 389.1

2 ENERGY SOURCE CHARACTERISTICS

Coal Characteristic

Units Stipulated Range Monthly Average Content

Sulphur Content % 0.6 TO >1.2 0.840

Ash Content % 27 TO 30 28.080

Page 3: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

3 EMISSION LIMITS (mg/Nm³)

Associated Unit/Stack

PM SOx NOx

Unit 1 100 3500 1100

Unit 2 100 3500 1100

Unit 3 100 3500 1100

Unit 4 100 3500 1100

Unit 5 100 3500 1100

Unit 6 100 3500 1100

4 ABATEMET TECHNOLOGY (%)

Associated Unit/Stack Technology Type Efficiency Sep-2019

Unit 1 Fabric Filter Plant (FFP) Unit Off-line

Unit 2 Fabric Filter Plant (FFP) 99.82%

Unit 3 Fabric Filter Plant (FFP) Unit Off-line

Unit 4 Electro Static Precipiator (ESP) 99.64%

Unit 5 Electro Static Precipiator (ESP) 99.73%

Unit 6 Electro Static Precipiator (ESP) 99.69%

5 MONITOR RELIABILITY (%)

Associated Unit/Stack

PM SO₂ NO

Unit 2 99.9 99.6 99.8

Unit 4 97.2 98.8 98.8

Unit 5 99.9 99.6 99.8

Unit 6 99.9 100.0 100.0

6 EMISSION PERFORMANCE

Table 6.1: Monthly tonnages for the month of September 2019

Associated Unit/Stack

PM (tons) SO2 (tons) NOx (tons)

Unit 2 85.7 3 694 1 973

Unit 4 145.8 2 907 1 754

Unit 5 76.8 2 704 1 077

Unit 6 88.7 1 956 1 036

SUM 397.1 11 262 5 841

Page 4: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

Table 6.2: Operating days in compliance to PM AEL Limit - September 2019

Associated Unit/Stack

Normal Grace Section

30 Contravention

Total Exceedance

Average PM

(mg/Nmᶟ)

Unit 2 27 2 0 0 2 45.5

Unit 4 19 4 2 0 6 99.5

Unit 5 20 2 0 0 2 53.4

Unit 6 14 5 0 0 5 89.5

SUM 80 13 2 0 15

Table 6.3: Operating days in compliance to SOx AEL Limit - September 2019

Associated Unit/Stack

Normal Grace Section

30 Contravention

Total Exceedance

Average SOx

(mg/Nmᶟ)

Unit 2 30 0 0 0 0 1 956.8

Unit 4 29 0 0 0 0 1 615.6

Unit 5 24 0 0 0 0 1 781.5

Unit 6 22 0 0 0 0 1 531.4

SUM 105 0 0 0 0

Table 6.4: Operating days in compliance to NOx AEL Limit - September 2019

Associated Unit/Stack

Normal Grace Section

30 Contravention

Total Exceedance

Average NOx

(mg/Nmᶟ)

Unit 2 30 0 0 0 0 1 035.7

Unit 4 29 0 0 0 0 955.9

Unit 5 24 0 0 0 0 706.4

Unit 6 22 0 0 0 0 800.4

SUM 105 0 0 0 0

Table 6.5: Legend Description

Condition Colour Description

Normal Emissions below Emission Limit Value (ELV)

Grace Emissions above the ELV during grace period

Section 30 Emissions above ELV during a NEMA S30 incident

Contravention Emissions above ELV but outside grace or S30 incident conditions

Page 5: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

0

100

200

300

400

500

600

0

20

40

60

80

100

120

140

160

180

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

PM

(m

g/N

mᶟ)

Figure 2: Duvha Unit 2 PM Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U2 MW

Emissions limit exceeded due to cold unit light.

0

100

200

300

400

500

600

0

50

100

150

200

250

300

350

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

PM

(m

g/N

mᶟ)

Figure 4: Duvha Unit 4 PM Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U4 MW

Section 30 incident reported and investigation report submitted

Emissions limit exceeded due to cold unit light.

Page 6: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

0

50

100

150

200

250

300

350

400

450

500

0

50

100

150

200

250

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

PM

(m

g/N

mᶟ)

Figure 5: Duvha Unit 5 PM Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U5 MW

Emissions limt exceeded due Precipsthat kept on tripping under voltage and DHP LH Row 4 that was blocked

0

100

200

300

400

500

600

0

50

100

150

200

250

300

350

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

PM

(m

g/N

mᶟ)

Figure 6: Duvha Unit 6 PM Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U6 MW

Emissions limit exceeded due to cold unit light.

Emissions limt exceeded due to dust hoppers that were full and faulty precips field.

Emissions limit exceeded due to cold unit light.

Page 7: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

0

100

200

300

400

500

600

0

500

1000

1500

2000

2500

3000

3500

4000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

SOx

(mg/

Nmᶟ)

Figure 8: Duvha Unit 2 SOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U2 MW

0

100

200

300

400

500

600

0

500

1000

1500

2000

2500

3000

3500

4000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

SOx

(mg/

Nmᶟ)

Figure 10: Duvha Unit 4 SOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U4 MW

Page 8: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

0

50

100

150

200

250

300

350

400

450

500

0

500

1000

1500

2000

2500

3000

3500

4000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

SOx

(mg/

Nmᶟ)

Figure 11: Duvha Unit 5 SOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U5 MW

0

100

200

300

400

500

600

0

500

1000

1500

2000

2500

3000

3500

4000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

SOx

(mg/

Nmᶟ)

Figure 12: Duvha Unit 6 SOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U6 MW

Page 9: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

0

100

200

300

400

500

600

0

200

400

600

800

1000

1200

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

NO

x (m

g/N

mᶟ)

Figure 14: Duvha Unit 2 NOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U2 MW

0

100

200

300

400

500

600

0

200

400

600

800

1000

1200

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

NO

x (m

g/N

mᶟ)

Figure 16: Duvha Unit 4 NOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U4 MW

Page 10: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

0

50

100

150

200

250

300

350

400

450

500

0

200

400

600

800

1000

1200

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

NO

x (m

g/N

mᶟ)

Figure 17: Duvha Unit 5 NOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U5 MW

0

100

200

300

400

500

600

0

200

400

600

800

1000

1200

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bo

iler

Load

(M

W)

NO

x (m

g/N

mᶟ)

Figure 18: Duvha Unit 6 NOx Emissions - September 2019

Normal Grace Section 30 Contravention AEL Limit U6 MW

Page 11: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

7 SHUT DOWN AND LIGHT UP INFORMATION

Tables 7.1: Shut-down and light-up information for the month of September 2019

Unit No.2 Event 1

Breaker Open (BO) 4:50 AM 2019/09/04

Draught Group (DG) Shut Down (SD)

5:50 AM 2019/09/04

BO to DG SD (duration)

00:01:00 DD:HH:MM

Fires in time 2:30 AM 2019/09/05

Synch. to Grid (or

BC) 1:55 PM 2019/09/05

Fires in to BC (duration)

00:11:25 DD:HH:MM

Emissions below limit from BC (end date)

not > limit not > limit

Emissions below limit from BC (duration)

n/a DD:HH:MM

Unit No.4 Event 1 Event 2

Breaker Open (BO)

BO previously

BO previously

10:30 PM 2019/09/13

Draught Group (DG) Shut Down (SD)

n/a n/a 12:00 AM 2019/09/14

BO to DG SD (duration)

n/a DD:HH:MM 00:01:30 DD:HH:MM

Fires in time 8:00 PM 2019/09/04 3:35 AM 2019/09/14

Synch. to Grid (or BC)

9:55 PM 2019/09/04 7:05 AM 2019/09/14

Fires in to BC (duration)

00:01:55 DD:HH:MM 00:03:30 DD:HH:MM

Emissions below limit from BC (end date)

9:00 PM 2019/09/09 12:00 AM 2019/09/15

Emissions below limit from BC (duration)

04:23:05 DD:HH:MM 00:16:55 DD:HH:MM

Page 12: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

Unit No.5 Event 1 Event 2

Breaker Open (BO)

11:25 PM 2019/09/06 11:50 PM 2019/09/27

Draught Group (DG) Shut Down (SD)

6:15 AM 2019/09/10 DG did

not trip or SD

DG did not trip or SD

BO to DG SD (duration)

03:06:50 DD:HH:MM n/a DD:HH:MM

Fires in time 6:20 AM 2019/09/10

Synch. to Grid (or BC)

6:35 AM 2019/09/11

Fires in to BC (duration)

01:00:15 DD:HH:MM 00:00:00 DD:HH:MM

Emissions below limit from BC (end date)

12:00 AM 2019/09/12

Emissions below limit from BC (duration)

00:17:25 DD:HH:MM DD:HH:MM

Unit No.6 Event 1 Event 2

Breaker Open (BO)

3:10 PM 2019/09/04 11:50 PM 2019/09/17

Draught Group (DG) Shut Down (SD)

3:55 PM 2019/09/08 11:40 PM 2019/09/23

BO to DG SD (duration)

04:00:45 DD:HH:MM 05:23:50 DD:HH:MM

Fires in time 4:00 PM 2019/09/08 3:25 AM 2019/09/24

Synch. to Grid (or BC)

4:25 PM 2019/09/08 4:10 PM 2019/09/24

Fires in to BC (duration)

00:12:55 DD:HH:MM 00:12:45 DD:HH:MM

Emissions below limit from BC (end date)

9:00 AM 2019/09/11 2:00 AM 2019/09/26

Emissions below limit from BC (duration)

02:16:35 DD:HH:MM 01:09:50 DD:HH:MM

8 General

The rest of the information demonstrate compliance with the emission license conditions is supplied in the annual emission report which will be sent to your office.

Page 13: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

9 & 10 Complainsts and Incidents Register

Refer to addendum A

Boiler Plant Engineering Manager Date

Environmental Manager Date

Engineering Manager Date

Compiled by: Environmental Officer

For: Nkangala District Municipality Air Quality Officer

Copies: Eskom Environmental Management D Herbst

B Mccourt

Group Technology Engineering R Rampiar

E Patel

Duvha Power Station: Engineering Manager

Operating Manager

Maintenance Manager

Production Manager

Boiler Engineering Manager

System Engineer

Environmental Manager

2020/05/2227 May 2020

27 May 2020

Page 14: DUVHA POWER STATION · DUVHA POWER STATION MONTHLY EMISSIONS REPORT Atmospheric Emission License 17/4/AEL/MP312/11/07 1 RAW MATERIALS AND PRODUCTS Raw Materials and Products Raw Material

ADDENDUM TO MONTHLY EMISSIONS REPORT

9 COMPLAINTS REGISTER

Table 9. Complaints for the month of September 2019

Source Code / Name

Root Cause Analysis

Calculation of Impacts / emissions associated with the incident

Dispersion modeling of pollutants where applicable

Measures implemented to prevent reoccurrence

Date measure will be implemented

No complaints were received during the month of September 2019.

10 S30 INCIDENT OR LEGAL CONTRAVENTION REGISTER

To be completed in the case of a S30 incident or a legal contravention:

Unit no Incident

Start Date Incident End Date

Incident Cause

Remedial action

S30 initial notificatio

n sent

Date S30 investigation report sent

Date DEA Acknowledgm

ent

Date DEA Acceptable

Comments / Reference No.

Unit 4 08/09/2019 10/09/2019

Management failure to timeously identify gap on the SO3 plant.

Develop skills matrix for the SO3 plant to assess the training needs.

09/09/2019 25/10/2019 13/09/2019 13/09/2019 14/7/6/2/4/2/1471 - I6435092019