Durga Shanker Mishra, IAS Secretary, MOHUA, GoI & Chairman, BMRCL Pradeep Singh Kharola, IAS Managing Director Vijay Kumar Dhir Director (P&P) N.M. Dhoke Director (RSE & OM) U.A. Vasanth Rao General Manager (T&R) & Chief Public Relations Officer Editorial Team T. L. Ravi Prakash Senior Manager-Public Relations & Srivas Rajagopalan Registered Office Address Bangalore Metro Rail Corporation Limited, 3rd Floor, BMTC Complex, K H Road, Shantinagar, Bengaluru—560 027 Telephone / Fax Nos Ph: +91-080-22969300 / 301 Fax : 080-22969222 Co. Identification No. (CIN) U16286KA1994GOI016286 Your feedback helps us serve you better. For any suggestions about Namma Metro email us at [email protected] or [email protected] You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2 Portal Beam Shuttering work in Progress at Reach-2A of Phase-2

Upload: others

Post on 04-Nov-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Madhusudan Prasad, IAS

Secretary, MoUD, GoI &

Chairman, BMRCL

Pradeep Singh Kharola, IAS

Managing Director

M. Naveen Kumar

Director (Finance)

Vijay Kumar Dhir

Director (P&P)

N.M. Dhoke

Director (RSE & OM)

U.A. Vasanth Rao

General Manager (T&R) &

Chief Public Relations Officer

EDITORIAL TEAM

T. L. Ravi Prakash

Senior Manager-Public Relations

&

Srivas Rajagopalan

Bangalore Metro Rail

Corporation Limited,

3rd Floor, BMTC Complex,

K H Road, Shantinagar,

Bengaluru—560 027

Ph: +91-080-22969300/ 301

Fax : 080-22969222

For any suggestions about

Namma Metro email us at

[email protected] or trav-

[email protected]

Your continued feedback

helps us serve you better.

You can also call on Toll

Free Helpline No.

1800-425-12345. You can

also view the updates on

ww.facebook.com / bmrcl.

Durga Shanker Mishra, IAS

Secretary, MOHUA, GoI &

Chairman, BMRCL

Pradeep Singh Kharola, IAS

Managing Director

Vijay Kumar Dhir

Director (P&P)

N.M. Dhoke

Director (RSE & OM)

U.A. Vasanth Rao

General Manager (T&R) &

Chief Public Relations Officer

Editorial Team

T. L. Ravi Prakash Senior Manager-Public Relations

&

Srivas Rajagopalan

Registered Office Address

Bangalore Metro Rail

Corporation Limited,

3rd Floor, BMTC Complex,

K H Road, Shantinagar,

Bengaluru—560 027

Telephone / Fax Nos

Ph: +91-080-22969300 / 301

Fax : 080-22969222

Co. Identification No. (CIN)

U16286KA1994GOI016286

Your feedback helps us

serve you better. For any

suggestions about

Namma Metro email us at

[email protected] or

[email protected]

You can also call on

Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Portal Beam Shuttering work in Progress at Reach-2A of Phase-2

Page 2: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

PHASE-II

REACH-1 Extension—(Baiyappanahalli to Whitefield-15.50 KM)

Compensation packages in respect of 205 properties have been sent to KIADB for payment. Compensation

amounting to ₹ 742.41 Crores has been paid in respect of 152 properties.

28(4) notification in respect of 46 properties (NH Area) is returned by Government to Spl. Deputy

Commissioner with some observations and final notification in respect of 52 properties required for electrical

utility shifting is approved by the Government and is awaiting publication in the Gazette.

28(1) notification in respect of 08 properties required for Electrical Utilities (additional) and 31 properties in

respect of additional lands from Jyothipura Station to Whitefield is approved by the Government and published

in Gazette dated 01.06.2017. Joint Measurement of the properties is completed and 28(4) notification is sent

to Government for approval.

28(4) Notifications in respect of 34 properties measuring 8294.27 Sq.mtr required for viaduct between

Jyothipura & K.R. Puram Station and 8 properties measuring 312.48 Sq.mtr required for shifting of Electrical

Towers is sent to Govt. for approval.

Baiyappanahalli to Jyothipura preparation of 28(1) is under verification.

28(1) and 28(4) notification in respect of additional land in R1 Extension- 235A and revised corrigendum

pertaining to change of names, area and survey number is sent to Government for approval.

REACH-2 Extension—(Mysore Road Station to Kengeri-6.50 KM)

Compensation packages for 84 properties amounting ₹ 186.06 Crores have been sent to SLAO, KIADB has

made payment in respect of 78 properties amounting to ₹ 165.10 Crores.

Draft 28(4) Notification is sent to SLAO for onward submission to Government.

28(1) Notification in respect of 18 properties pertaining to Challaghatta Depot measuring 43865 sq. mtrs is

sent to SLAO after conducting Joint Measurement. The same is being verified by SLAO.

Joint measurement in respect of Challaghatta Depot for the area notified earlier is completed and sent to

SLAO for verification. .

REACH-3C Extension—(Nagasandra to Bangalore International Exhibition Centre-3.00 KM)

Compensation packages in respect of 64 properties amounting to ₹ 99.11 crores have been sent to SLAO,

KIADB. Payment has been made in respect of 42 properties amounting to ₹ 56.99 crores.

28(1) Notification in respect of 3 additional properties is approved and published in the Gazette. Joint

Measurement is complete. Chief Engineer R3C’s opinion is awaited.

28(1) Notification in respect of 3 additional properties is approved and published in the Gazette. Joint

measurement is complete. CE R3C’s opinion is awaited.

DETAILS OF LAND AND PROPERTY ACQUISITION FOR GOVERNMENT & PRIVATE PROPERTIES

Page 3: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

REACH-4B Extension—(Yelachenahalli Cross to Anjanapura Township-6.50 KM)

Compensation packages for 287 properties amounting ₹ 308.85 Crores have been sent to SLAO, KIADB and

payment has been made in respect of 262 properties amounting to ₹ 284.25 Crores.

28(4) Notification in respect of 28 properties required for electric utility shifting is approved by Govt. and the

valuation Report from the Land Committee is received and compensation packages are sent to KIADB for

payment.

Land plan for Anjanapura Depot is being revised by the concerned Chief Engineer.

28(4) Notification for additional area of 1005.21 sq. mtrs. is sent to Government for approval.

28(1) Notification in respect of additional property measuring 112.53 sq. mtrs. is approved by Government and

is sent to Government Press for publication in the Gazette.

REACH-5 New Line-(R.V. Road to Bommasandra-18.50 KM)

Out of total 545 properties acquired, compensation packages for 451 properties amounting ₹ 1212.65 Crores

have been sent to SLAO, KIADB and payment has been made in respect of 243 properties amounting to

₹ 649.31 Crores.

Notification u/s 28(4) in respect of 72 properties required for electric utility shifting is sent to SLAO, KIADB

28(1) Notification in respect of additional properties required for Jayadeva Station is published in the Gazette.

Joint Measurement is completed and SLAO, KIADB has to pass order u/s 28(3).

28(1) Notification in respect of additional properties required for Jayadeva Station is published in the Gazette.

Joint measurement drawings are being prepared.

JMC is under progress for 94 properties required for Central Silk Board Station, Subways, Ramp, Loops and

Viaduct in RV Road to Bommasandra stretch.

REACH-6 New Line-(Gottigere (IIMB) to Nagawara-22.00 KM)

Out of 251 properties, compensation packages in respect of 160 properties is approved by Accounts Section

and compensation packages in respect of 120 properties amounting ₹.256.00 Crores have been sent to

SLAO, KIADB for payment. Payment has been made in respect of 5 properties amounting to ₹13.55 Crores.

Kothanur Depot –Joint Measurement sketch along with draft 28(4) Notification is sent to SLAO for approval.

The matter is pending in the Hon’ble High Court of Karnataka with regard to Sy. No. 87 of Kothanur.

28(1) Notifications in respect of additional lands required for the above reach and the lands required for

Electric Utility Shifting have been published in the Gazette dated: 02.02.2017 and JMC is completed. For 28(4)

Notification is sent to SLAO, KIADB on 24.08.2017.

28(1) Notification in respect of 7 UG Stations from Dairy Circle to Shivajinagar is published in the Gazette on

30.03.2017 and JMC is under progress. JMC for Two stations i.e. Dairy Circle, MICO, Langford and

Shivajinagar is completed. Notification under section 28(4) will be sent to SLAO, KIADB after completion of

JMC of remaining three stations.

28(1) Notification in respect of other Underground Stations 3 Stations i.e. Pottery Town, Tannery Road,

Venkateshpura is already submitted to SLAO, KIADB on 27.05.2017. JMC is under progress.

DETAILS OF LAND AND PROPERTY ACQUISITION FOR GOVERNMENT & PRIVATE PROPERTIES

Page 4: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

REACH-1Extension:- Construction of Elevated Structures (Viaduct) of length of 15.50 Kms. (approx.)

consisting of 13 No of Stations from Baiyappanahalli dead end to Whitefield station dead end

viz. Jyothipura Stn., K R Puram Stn., Mahadevapura Stn., Garudacharpalya Stn., Doddana

Kundi Industrial Area Stn., Visvesvaraya Industrial Area Stn., Kundahalli Stn., Vaidhei

Hospital Stn., Satyasai Medicals Stn., ITPL Terminal Stn., Kaadugodi Stn., Ujwala Vidyalaya

Stn. & Whitefield Stn. in the extension on East side of East-West Corridor on Bangalore Metro

Rail Project, Phase – 2

Name of the Contractor :- M/s ITD Cementation India Limited (JV) Two Packages (P1 & P2)

Progress of Package –1 (Reach-1A):-

Land Acquisition:-

Baiyappanahalli to Mahadevapura: 28/4 final notification has been done for 64 nos of properties and

balance 46 properties is in progress. Valuation of all properties(64+46) have been completed. Reach-1A Land

acquisition is in progress.

Mahadevapura to Satya Sai Hospital: Valuation of properties and final notification has been completed.

Property wise compensation proposals are submitted to KIADB for disbursement to land owners are in

progress.

Satya Sai Hospital to Whitefield: Valuation of properties completed and final notification has been

completed. Property wise compensation proposals are submitted to KIADB. Disbursement to land owners is in

progress.

BESCOM Utilities: 63 numbers identified for shifting of BESCOM utilities such as RMU’s and Transformers.

28/1 Notification has been issued.

Demolition of Buildings / Structures Identified for Acquisition:- The contract for demolition of structures

have already been awarded to M/S B.R. Chawla for the entire stretch of 15.500km. Demolition work is under

progress. 80 numbers of properties are demolished out of 94 Nos and balance 2 are in progress as far as in

Package 1A and 61 numbers of properties are demolished out of 71 Nos and balance 3 are in progress as far as

Package 1B. Total 123 numbers of properties are demolished out of 146 Nos so far as Reach-1 Extension.

Shifting of Water Supply Lines & Underground Drainage (UGD) Lines:- The proposal for affected water

lines has been identified along with BWSSB. Received estimate for Rs.12.90 Crores from BWSSB. An amount of

₹ 4.88 Crores (50% of the cost estimate of ₹ 9.76 Crores) has been deposited to BWSSB. Further ₹1.354 Crores

(50% of the cost estimate of ₹ 2.70 Crores) has been deposited to BWSSB on 23.12.2016. Tender for shifting of

utilities from B. Narayanapura to Kadugodi – BWSSB issued LOA on 31.05.2017. Procurement of material is

under progress. Tender for shifting of utilities from A. Narayanapura to B. Narayanapura– BWSSB has issued

LOA on 18.05.2017. Procurement of material is under progress. WEEPPIA/KIADB Water supply lines-An amount

of ₹ 3.82 Crores has been deposited on 13.04.2017. Re-Tender has been opened on 25.07.2017 and work

awarding is in progress at WEEPPIA.

REACH WISE PROGRESS OF PHASE-2

Page 5: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

220KV line from SAPLAB (Kundalahalli Station) to Satya Sai Station for about 3.00 km overhead line to be

made underground:- An amount of Rs. 64 Crores has been deposited to KPTCL for taking up the work.

1) For 11 KV Line:

Package-1 Baiyappanahalli to Lowery School – Tender under preparation.

Package-2 Lowry School to EPIP – Tender Approved, LOA issued to transglobal on 19.07.2017.

Package –3 EPIP to Kadugodi - Tender awarded agreement under process.

2) For Lamp Pole and Light Poles:

Package-1 Baiyappanahalli to Hoodi and Package–2 Hoodi to Kadugodi, Tenders are under vetting by the

contract section.

For 220 KV and 66 KV line LOA issued to M/S. UNIVERSAL CABLES LTD by KPTCL, work has been started on

2nd May 2017. Cable laying work has been completed in Metro alignment and cable jointing work is in progress.

Viaduct & Stations: along with Road Widening works:-

Reach-1A:

M/s. ITD Cementation India Limited –ITD (JV) vide LOA No BMRCL/Phase2/Reach1A/BYP-VIA/Via &

Stn /2016/14/LOA/ dated 11.04.2017. R1A Contract agreement was signed on 23.05.2017.

Test pile (6 No’s) for initial vertical pile load test and lateral pile load test are completed at Lowery School,

BP221 to BP-222 and Visvesvaraya Industrial Area station. Initial vertical pile load test completed at Lowery

school and reports has been sent to CE P&D for necessary concurrence.

Second and Third Initial vertical pile load test completed at Hoody Circle and Visvesvaraya Station

respectively. Second pile load test reports has been sent to CE P&D for necessary concurrence.

Working pile started at Lowery School, Hoody Circle and Visvesvaraya Station, total 103 numbers of Piles has

been completed, out of which 60 numbers at station locations (K.R Puram station and Visvesvaraya Industrial

area station ) and 43 No’s for viaduct portion near Hoody Circle.

Two lateral pile load test completed. One at Lowery School on 29.07.2017 and another at Visvesvaraya

Station on 30.08.2017.

Road widening work is in progress in section 3 from BP-130 to BP-138 (RHS 211 m & LHS 231 m) BP-123 to

BP-120 (RHS 30m & LHS 40 m).

Road widening work is in progress in section 4 from BP-187 to BP-198 (RHS 220 m & LHS 220 m).

Road widening work is in progress in section 5 from BP-228 to BP-223 (RHS 125 m & LHS 125 m) and

BP-252 to BP-268 (RHS 150 m & LHS 125 m).

REACH WISE PROGRESS OF PHASE-2

Page 6: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Reach-1B:

M/s. ITD Cementation India limited –ITD (JV) Vide LOA No BMRCL/Phase2/Reach1B/VIA-WTF/

Via&Stn/2016/15/LOA/3978dated 28.04.2017. R1B Contract agreement was signed on 09.06.2017.

Test pile (4 Nos) for initial vertical pile load test and lateral pile load test are completed at Hope Farm and

Lesso location. One initial vertical and one lateral load test has been completed.

32 no’s working pile have been completed in viaduct portion.

1 no. working pile has been completed at Ujawala Vidhyalaya Station.

Road widening work is in progress at various locations all along the alignment from BP-271 to BP-471.

REACH WISE PROGRESS OF PHASE-2

Piling, Barricading & Road widening works are in progress at

Page 7: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

REACH-2Extension-Reach-2A:- Construction of Elevated Structures of Length 3.945 kms (approx)

from Mysuru Road Station dead end to Pattanagere Station including 4 Nos. of Elevated Metro

Stations viz Nayandahalli Station, Rajarajeshwarinagar Station, Jnanabharathi Station and

Pattanagere Station in the extension on west side of East-West Corridor of Bangalore Metro

Rail Project, Phase-2.

Name of the Contractor :- M/s IL&FS Engineering Construction Company Limited

Total Cost of the Project :- Rs. 327.00 Crores

Shifting of Water Supply Lines & Underground Drainage (UGD) Lines:- The affected water supply line and

Underground Drainage line are identified along with the concerned BWSSB Engineers for the entire stretch. The

drawings are prepared and submitted to BWSSB for shifting the identified utilities to the new location of utility

corridor.

BWSSB has submitted the estimate. According to that BMRCL deposited the estimated amount to BWSSB. The

work has been taken up by BWSSB and completed at Jnanabharathi, Rajarajeshwarinagar Station and

Nayandahalli Station in all respects .

Road Widening Works:- Road Widening works from Nayandahalli to Rajarajeshwarinagar both side

completed and Jnanabharathi station and Pattanagere station all the road works has been completed. In Stations

both side drain work with Road widening/diversion work is in Progress. Retaining wall work is under construction.

The Estimate for road widening from Jnanabharathi to Pattanagere has been submitted by National Highway

PWD Karnataka to BMRCL. The required amount has been deposited by BMRCL for Road widening purpose to

National Highway, PWD. Road widening work from Jnanabharathi to R.V. College is completed by the National

Highway, PWD, Karnataka.

Viaduct & Stations:-

The construction of 3.945 KM Viaduct and Four stations has been awarded to M/s IL&FS construction Pvt Ltd.

and the work is in progress. Uncharted Utility checking, Piling, Pile Cap, Pier and Pier Cap works are under

progress. Segment Erection for Thirty one spans is completed.

In Stations– Pile, Pile Cap, Column– Up to Concourse Level and Portal Beam at Concourse Level casting

work is in progress. Column from Concourse Level to Platform Level and Cross Beam at platform and rail

level is under progress at Nayandahalli, BGUC and Jnanabharathi Stations. Portal Cross Beam at BGUC

Station is completed at Concourse Level and nine numbers at Pattanagere Station casting is completed, three

numbers Portal Beam at Concourse Level casted at Nayandahalli Station and six numbers at

Rajarajeshwarinagar Station.

Phase-1 incomplete Portal Pier number 438B Pier has been casted. 220 kV High tension Tower line has been

shifted from P457 & P473 and Piling work also completed for this pier.

Precast concrete works of Segment Casting, I Girder Casting is under Progress at casting Yard. Parapet

Casting work is under progress at casting yard. Piling work 100% is completed in all the four stations.

Nayandahalli, Rajarajeshwari, Jnanabharathi and Pattanagere Stations.

Page 8: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Physical progress completed as on August 2017 is as below :

Sl

No

Description

Viaduct

Stations

Total

Nos Nayandahalli

(NYH)

Rajarajeshwarinagar

(RRN)

Jnanabharathi

(JNB)

Pattanagere

(PTN)

1 Test Pile 2 1 1 1 1 6

2 Initial Vertical Pile load test

2 1 1 1 1 6

3 Pile-1200 mm dia 591 108 108 90 108 1005

4 Pile-600 mm dia —- 95 88 81 91 355

5 Pile Cap-Viaduct 119 25 25 27 27 223

6 Pile Cap-Off Road — 20 2 16 04 42

7 Pier—Viaduct 93 31 31 33 36 224

8 Portal beam at concourse level

1

3

6

11

9

30

9 Column at Concourse Level

—-

12

32

22

66

10 Portal beam at Platform Level

— —- —-

3 —-

3

11 Crash Barrier 63 3 5 — — 71

12 Segment Erection 45 — — — — 45

13 Segment 626 — —- — — 626

14 Parapet 644 — — —- — 644

15 I-Girder Pre Tension (Concourse Level)

— — 76 42 37 155

16 I-Girder-Pre Tension (Platform Level)

— —- 40 29 08 77

17 I-Girder Post Tension —- 25 —- — —- 25

18 I-Girder Erection — — — 3 — 3

I-Girder erection work is in progress at Reach-2A

of Phase-2

Page 9: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

LG-1 Segment erection work is under progress and 24 numbers of spans erected.

LG-2 Segment erection work is under progress and 21 numbers of spans erected from P-571.

At Jnanabharathi (JNB), Pattanagere (PTN) and Rajarajeshwari Stations 100% Piling Works are completed.

View of Viaduct work is in progress at Reach-2B of

View of Pier Staging, Shuttering and

Reinforcement work is in progress at Viaduct

at Reach-2B of Phase-2

Page 10: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

View of Pier Arm Reinforcement work is in progress at Kengeri Station at Reach-2B of Phase-2

View of Retaining wall shuttering work is in progress at Mailasandra Station at Reach-2B of Phase-2

Page 11: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

REACH-2Extension-Reach-2B:- Construction of Elevated Structures (Viaduct) of length of

4.869 Kms. (approx.) from Pattanagere Station (excluding) to beginning of Challagatta Depot

including 2 Nos of Elevated Metro Stations viz. Mailasandra Station and Kengeri Station in the

extension on west side of E-W Corridor on Bangalore Metro Rail Project, Phase – 2

Name of the Contractor :- M/s Soma Enterprise Limited,

Total Cost of the Project :- Rs. 332.00 Crores

Land Acquisition:- The land acquisition for Reach-2B from Pattanagere Station to Kengeri Arch Bridge is

complete and the land is in position with BMRCL. From Kengeri Arch Bridge to Challaghatta Depot the preliminary

notification for acquisition has been issued for Joint Measurement is in progress.

Building Condition Study & Structural Analysis:- The work has been awarded to M/s Civil Aid Techno

Clinic Pvt Ltd. and the work has been completed from Pattanagere Station to Kengeri Arch Bridge from Kengeri

Arch Bridge to Challaghatta the work is in progress.

Demolition of Buildings / Structures Identified for Acquisition:- The work has been awarded M/s Binyas

Contech Pvt Ltd and M/s Sai Retro Fabs. The work has been completed from Pattanagere station to Kengeri Arch

Bridge from Kengeri Arch Bridge the work will commence after acquisition of properties.

Road Widening Works:- From Pattanagere Station to NICE Road the Road Widening work has been

started by National Highway PWD Karnataka. 97% of the work is completed.

Viaduct & Stations:- The construction of 4.869 KMs Viaduct and Stations has been awarded to M/s SOMA

Enterprises Limited and the work is in progress.

Test Pile :- Two numbers of Initial Vertical Pile Load test is completed for the Viaduct. Barricading work is

in progress. Working Pile:- The work is in progress.

Casting Yard at Kanminike near Bidadi:- Two numbers of Batching Plant, Segment Casting Bed is in

progress. The site office for field work has been established at Deepanjalinagar, Property Development area. All

other preliminary works is under progress.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Segment curing work is in progress at Casting Yard in

Reach-2B of Phase-2

Page 12: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Physical progress for the month of August 2017 is as below:

REACH-3Extension-Reach-3C:- Extension line of Reach-3b of Phase-1 on Northern Corridor from

Hessaraghatta Cross to Bangalore International Exhibition Centre (BIEC) viz

Manjunathanagara Stn., Jindal Stn., & BIEC Stn. The section length is 3.77 Kms with

3 Stations and fully Elevated Section.

Name of the Contractor :- M/s Simplex Infrastructures Limited.

Total Cost of the Project :- ` 298.65 Crores, Letter of Acceptance is issued on 27.02.2017.

Land Acquisition:- Payment of compensation towards acquired land and taking over of land by KIADB is

under progress. Handing over of land to the Engineering section part by part is under progress. Out of 62 private

properties, 37 Nos. of properties are handed over to Engineering section for execution of work. 27 properties are

clear from any issues.

Demolition of Buildings / Structures Identified for Acquisition:- The work of demolition of buildings has

been awarded to M/s. SAI Retro Fabs for entire stretch. Out of 54 properties to be demolished. 10 properties have

been demolished & 1 is under progress.

Viaduct & Stations (including Road Widening works):- Issue of GFC drawings is in progress from the

Design wing of BMRCL. The process for obtaining permission for use of NHAI service road/ROW for construction

of viaduct and stations of Bangalore Metro Rail is under progress, with NHAI.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Sl No

Particulars

Unit

Viaduct

Stations

Total Nos Mailasandra Kengeri

1 Barricade Erection Nos 2300 80 140 2520

2 Initial Vertical Pile Load Test Nos 2 — — 2

3 Initial Lateral Pile Load Test Nos 2 — — 2

4 Piles Nos 562 — 60 622

5 Pile Cap Nos 83 — 9 92

6 Segment Casting Nos 518 — — 518

7 Secant Piles Nos —- 101 — 101

8 Pier & Pier Cap Nos 44 —- 8 52

9 Raft foundation concrete Rmt — 135 — 135

10 Upper Basement Slab Rmt — 135 — 135

11 Ground Floor Slab Rmt — 90 — 90

12 I-Girder Casting (Post Tension) Nos 6 13 — 19

13 Parapet Casting Nos 53 — — 53

14 Segment Erection Span 7 — — 7

Page 13: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Notice to proceed to start the work has been issued on 27.04.2017 to the contractor, M/s. Simplex Infrastructures

Limited.

Development of casting yard is under progress. Project office of Simplex is ready at casting yard. Set up of

quality lab completed and calibration of equipment's is under progress. Erection of one number of batching

plant is complete and its calibration is under progress. Bed preparation for gantry is complete and gantry

(15MT) erection is under progress.

Fabrication and erection of barricading boards is in progress.

Trial trenches for identifying utilities over Pile Cap location is in progress at Manjunatha Nagar Station.

Construction of drain at Manjunatha Nagar station in progress.

4 nos. of Test pile and 1 Working Pile at Manjunatha Nagar Station is casted so far.

Initial Vertical Pile load testing arrangements of 2 No’s of test pile is under progress.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Batching Plant set up at Casting Yard Barricading work is in Progress

Working Pile work is in Progress at Manjunathnagar Station Utility Trial Trenching work is in Progress

Page 14: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

REACH-4Extension-Reach-4B:- Construction of Elevated Structures of length 6.524 km (approx)

from Puttenahalli Cross Station to Anjanapura Township Station and further viaduct

including 5 Nos. of Elevated Metro Stations Viz. Anjanapura Road Cross Station, Krishna

Leela Park Station, Vajrahalli Station, Thalaghattapura Station and Anjanapura Township

Station.

Name of the Contractor :- M/s Nagarjuna Constructions Company Limited.

Total Cost of the Project :- Rs. 508.86 Crores.

Viaduct & Stations:-

The work of Construction of this Project is awarded to M/s Nagarjuna Constructions Company Limited and the

work is in progress.

All Works like Barricading, Cross trenching, Piling, Pile caps, Piers and Pier caps, Road widening, Drain works

etc. are in progress along Viaduct.

Works like Drain works, Service Road and Foundation works are in progress at Anjanapura Cross Road

Station, Krishna Leela Park Station, Vajarahalli Station, Thalaghattapura Station & Anjanapura Township

Station.

603 nos of Piles out of 1028 piles are completed for Viaduct structures.

739 nos of Piles out of 830 piles are completed for Station locations.

126 nos of Pile caps out of 222 nos are completed for Viaduct structures.

129 nos of Pile caps are completed out of 320 nos for Off-road structures at Station locations.

45 nos of Pile caps are completed out of 50 nos for C-Grid at Station locations.

111 nos of Piers are completed out of 222 nos for Viaduct structures.

45 nos of Pier Arm for Concourse level are completed out of 50 nos at Station locations.

32 nos of Piers up to Concourse level are completed out of 50 nos at Station locations.

23 numbers of Pier Arm for Platform Level is completed out of 50 numbers at Station locations.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Sl No

Launching Activities (Viaduct) Launching Activities (Stations)

1 LG-01 15 Segmental Spans are erected from

EP-128 to EP-143

Anjanapura Road Cross Station-52 I-Girder erection

has been completed out of 133 Numbers.

2 LG-02 17 Segmental Spans are erected from

EP-183 to EP-200

Vajarahalli Station- 5 I-Girder erection has been

completed out of 133 Numbers.

3 LG-03 6 Segmental Spans are erected from

EP-252 to EP-258

Page 15: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Casting Yard:- NCCL has set up their Casting Yard on 20 Acres of land near Agara Cross (near Tataguni

village), 4km away from EP344 (last pier of R4B Project)

The following activities are in progress at the Casting Yard:

Setting up of Batching plants, 60cum/hr & 30cum/hr.

Segment and PSC I-Girder casting beds.

Setting up of site office, stores, QA/QC lab, etc.

3 nos of 20T, 1 no. of 80T& 1 no of 120T Gantries are erected & commissioned.

5 Long line & 5 Short line Beds are commissioned for Segment casting (One Bed for Curved Span).

8 Beds are commissioned for I-girder casting (Pre-tensioned I-Girders).

8 Beds are commissioned for I-girder casting (Post-tensioned I-Girders).

Reinforcement works for Piles, Pile caps, Piers, Pier caps, I-Girders, Segments and drains are in progress.

Pre-Casting of Segments, I-Girders, Parapets and drains are in progress.

Casting of Segments 964 nos are completed out of 1914 numbers.

Casting of Pre-Tensioned I-Girders 260 nos are completed out of 425 numbers.

Casting of Post-Tensioned I-Girders 57 numbers out of 240 numbers are completed.

Casting of Parapets 37 numbers out of 4018 numbers are completed.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Anjanapura Road Cross Station: Column work is in

progress above Concourse Level at Reach-4B of

Launching Girder 03–Segment Lifting & Stressing work

completed from EP-252 to EP-258 at Reach-4B of

Page 16: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

Abstract of Progress of Reach-4B as on 31.08.2017

REACH WISE PROGRESS OF WORKS OF PHASE-II

Sl No Item Unit Total

Qty

Work done till

July 2017

Progress for the

Month of Aug 2017 Progress

upto date Till Last

week

For this

week

I VIADUCT WORKS

1 Piling 1200 mm dia Nos. 1028 543 48 12 603

2 Pile caps Nos. 222 116 8 2 126

3 Piers & Pier caps Nos. 222 98 11 2 111

4 Crash Barrier Nos. 222 58 3 — 61

5 Segment Casting Nos 1914 866 85 13 964

6 Segment Erection Span 209 34 3 1 38

7 Parapet Casting Nos 4018 37 — — 37

8 Drain Rmt 10930 5196 — — 5196

9 Bearing Installation Spans 210 — — 2 2

II STATION WORKS

1 Piling 1200 mm dia Nos. 470 441 — — 441

2 Piling 600 mm dia Nos. 360 298 — — 298

3 Pile caps off Road Structures Nos. 320 127 2 — 129

4 Pile caps C-Grid Structures Nos. 50 45 — — 45

5 Pier up to Concourse Level (C-Grid) Nos. 50 44 1 — 45

6 Pier Arm for Concourse Level Nos. 50 32 — — 32

7 Pier above Concourse Level (C-Grid) Nos 50 25 4 — 29

8 Pier Arm for Track Level Nos. 50 14 8 1 23

9 Pre-Tension I-Girder casting (For Concourse level)

Nos. 245 146 4 — 150

10 Pre-Tension I-Girder casting (For Platform Level)

Nos. 180 102 4 4 110

11 Post-Tension I-Girder casting (For Track Level)

Nos. 180 36 8 5 49

12 Post Tension I-Girder casting (for Transition Level)

Nos. 60 6 1 1 8

13 I-Girder Erection (For Concourse Level) Nos 245 14 8 3 25

14 I-Girder Erection (For Platform Level) Nos 180 12 4 — 16

15 I-Girder Erection (For Track Level) Nos 180 — 12 4 16

16 Drain Rmt 2850 1501 — — 1501

Page 17: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

REACH-5 (New Line) R V Road Station to Bommasandra Station viz. R V Road Stn., Ragigudda Stn., Ja-

yadeva Hospital (Interchange) Stn., BTM Layout Stn., Central Silk Board Stn., HSR

Layout Stn., Oxford College Stn., Muneshwaranagar Stn., Chikkabegur Stn., Basa-

pura Road Stn., Hosa Road Stn., Electronic City-1 Stn., Electronic City-2 Stn.,

Huskur Road Stn., Hebbagodi Stn., Bommasandra Stn. The section length is

18.82 Kms with 16 Stations fully Elevated Section. R V Road Station is on

existing North-South Corridor with passenger interchange.

Building Condition Study & Structural Analysis:- The work has been awarded to M/s. Civil Aid Techno

Clinic Pvt Ltd., Bangalore.

The BCS work for the stretch between Muneshwaranagar to Bommasandra is completed.

The BCS for the section between Central Silk Board to RV Road stretch is in progress.

Demolition of Buildings / Structures Identified for Acquisition:- The work of demolition of buildings has

been awarded to M/s. B.R. Chawla for the entire stretch. The demolition work is in progress.

Shifting of Water Supply Lines & Underground Drainage (UGD) Lines :- The affected water supply lines

and Underground Drainage lines are identified along with concerned BWSSB Engineers for the entire stretch.

Tenders for shifting of Water supply pipe lines and Underground Drainage lines for the stretch between RV Road

Junction and Central Silk Board have been called by BWSSB. The work has been awarded and Letter of

Acceptance (LOA) is issued to the agencies. The work for shifting of water supply and Underground Drainage

works between Central Silk Board and Bommasandra is awarded and LOA is issued to the agencies.

BWSSB will carry out the work once the land acquisition and demolition works are completed.

BMRCL has proposed modifications in location of service road to the extreme western edge along NH on Hosur

Road. This proposal is already presented to NHAI. The present utility corridor will not be disturbed resulting in

minimum shifting of existing UG utilities wherever there is infringement with metro structures. Trial trenches are

being taken for identification of UG utilities for confirming infringement with metro structures.

Valuation of Building Structures:-

The valuation of buildings to be demolished between Central Silk Board to Muneshwaranagar is completed for

this section.

The valuation of buildings to be demolished between Muneshwaranagar to Bommasandra is completed.

The work of valuation for the stretch between Central Silk Board and RV Road is in progress. 66/113

properties valuation of buildings/properties are completed and submitted to land section.

Viaduct & Stations (Including Road Widening works):-

The General Arrangement drawing and land plans have been prepared.

The permission for use of NHAI service road for construction of viaduct and stations by NHAI of Bangalore

Metro Rail between Central Silk Board and Bommasandra is obtained from NHAI. The MOU (Memorandum of

Understanding) has been entered between NHAI & BMRCL.

The Detailed Design Consultancy work is already awarded to M/s. Systra for the entire section from RV Road

to Bommasandra.

The Detailed Design and Drawings of viaduct and stations are in progress. The Road widening plan has been

prepared and submitted to Traffic police and permission letter is obtained from Addl. Commissioner of Police

(Traffic).

REACH WISE PROGRESS OF WORKS OF PHASE-II

Page 18: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

The proposed traffic diversion plan along Marenahalli road/ORR has been shown to the concerned Traffic

police. The approval for the same is expected shortly.

Road widening work along ORR will be taken up in consultation with Traffic police, BBMP etc.

The Tenders are awarded for Package –1, Package-2 & Package-3 of Reach 5 Line for Construction of

Viaduct and Stations of packages between

Bommasandra to Hosa Road of 6.4 Kms length (Package-1) :- The work of construction of viaduct and

stations between Bommasandra-Hosa Road of 6.4Km length is awarded. The casting yard is being

established by the agency at Chandapura Road. Casting and testing of test piles is completed. The trial

trenching work is completed for identification of UG utilities for confirmation of infringement with metro

structures. The drain work has commenced in available land stretches.

Hosa Road to HSR Layout of 6.4 Kms length (Package-2) :- The work of construction of viaduct and

stations between Hosa Road - HSR Layout of 6.4Km length is awarded. The casting yard is being established

by the agency at Chandapura Road. Casting and testing of test piles is completed. The trial trenching work is

completed for identification of UG utilities for confirmation of infringement with metro structures. The drain

work has commenced in available land stretches.

HSR Layout to R V Road of 6.34 Kms length (Package-3):- The work of construction of viaduct and

stations between HSR Layout to RV Road of 6.34Km length is awarded. The casting yard is being established

by the agency at Hommadevanahalli on Banneraghatta Road-. Road widening work in the stretch between

RV Road to Ragigudda is in progress. Tree Transplantation work is in progress.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Drain Construction work is in progress at

Reach-5 of Phase-2

Road Widening work is in progress at Reach-5 of Phase-2

Page 19: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

REACH WISE PROGRESS OF WORKS OF PHASE-II

Pile Load Test work is in progress at Reach-5 of Ph-2 Casting Yard establishment at Chandapura

Batching Plant establishment at Chandapura Tree Transplanting work is in Progress

Page 20: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

AUGUST 2017

Page 21: Durga Shanker Mishra, IAS · Namma Metro email us at bmrcl@dataone.in or travelhelp@bmrc.co.in You can also call on Platform and Rail level Cross Beam Staging in Reach-2A of Phase-2

The entire Network Map of Namma Metro Phase-1, at total length of 42.30 Kms, Phase-2 at total length of 72.095

Kms (13.79 km Underground) and 61 Stations with 12 Underground Stations & Phase-2A at total length of

17.00 Kms. Each line can be traced along with the Station Names in the Map below.