Are we safe from reservoir flooding?
Duncan Faulkner
Head of Hydrology, JBA Consulting
![Page 2: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/2.jpg)
A confession
![Page 3: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/3.jpg)
![Page 4: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/4.jpg)
Date Location % of estimated PMP
28 Jul 1917 Bruton, Somerset 102%
18-19 Aug 1924 Cannington, Somerset 103%
19 Jul 1955 Martinstown, Dorset 117%?
7 Oct 1960 Horncastle, Lincs 101%
19 May 1989 Halifax, W. Yorkshire 119%
Going over the top… rainfall
Source: Stewart, E. J., Jones, D. A., Svensson, C., Morris, D. G., Dempsey, P., Dent, J. E., Collier, C. G., and Anderson,
C. A. (2013) Reservoir Safety – Long Return Period Rainfall. R&D Technical Report WS 194/2/39/TR, Defra.
![Page 5: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/5.jpg)
Date Location Catchment size
(km2)
% of estimated
PMF
17 Aug 1917 Red-a-ven, Devon 4.0 141%
12 Aug 1948 Stobshiel, East Lothian 4.1 111%
08 Aug 1967 Claughton, Lancashire 2.3 200%
16 Aug 1970 Dorback, Morayshire 365 139%
13 Jun 1980 Caldwell Burn, Dumfriesshire 5.7 381%
12 Jul 1982 Chulmleigh, Devon 1.7 270%
Going over the top… flood flows
Source: Acreman, M.C. (1989) Extreme historical UK floods and maximum flood estimation. J. IWEM 3, 404-12.
![Page 6: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/6.jpg)
Upward trends in the uplands
1938 1943 1948 1953 1958 1963 1968 1973 1978 1983 1988 1993 1998 2003 2008 2013
Leven
Eamont
![Page 7: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/7.jpg)
A look under the bonnet
![Page 8: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/8.jpg)
1. PMP dated
![Page 9: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/9.jpg)
Timeline of rainfall frequency models
1970s 1980s 1990s 2000s 2010s
Return periods up to 1000 years: fluvial flooding and drainage design
FSR rainfalls
FEH rainfalls
FEH13
10,000-year return period
FSR rainfalls
FEH13
PMP
FSR rainfalls
![Page 10: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/10.jpg)
2. Flood Studies Report model superseded
![Page 11: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/11.jpg)
3. Rapid response
![Page 12: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/12.jpg)
3. Rapid response
![Page 13: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/13.jpg)
3. Rapid response
The consequence of the observed nonlinearity in
response time is to increase design peak flow by … up
to 80% when considering the probable maximum flood.
Kjeldsen et al. (2016), Journal of Hydrologic Engineering
![Page 14: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/14.jpg)
4. Snowmelt
![Page 15: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/15.jpg)
5. Frozen ground
![Page 16: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/16.jpg)
6. Errors in % runoff for some soil types
![Page 17: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/17.jpg)
7. No allowance for climate change
![Page 18: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/18.jpg)
Summary
![Page 19: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/19.jpg)
![Page 20: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/20.jpg)
![Page 21: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/21.jpg)
![Page 22: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/22.jpg)
![Page 23: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/23.jpg)
![Page 24: Duncan Faulkner Head of Hydrology, JBA Consulting we safe from reservoir flooding? Duncan Faulkner Head of Hydrology, JBA Consulting](https://reader033.vdocuments.mx/reader033/viewer/2022052207/5ab067e67f8b9a59478e8f51/html5/thumbnails/24.jpg)
Duncan Faulkner and Jeremy Benn (2016). Reservoir Flood Estimation: Time for a Re-think. Proceedings of the British Dam Society Conference: Dams – Benefits and Disbenefits; Assets or Liabilities? ICE Publishing / British Dam Society.