dult 28 march nmt
DESCRIPTION
CBD Bicycle infrastructure presentation to DULT Bangalore from Praja.inTRANSCRIPT
For the NMT task force
NMT enablement of the MG road area & surroundings
8 kilometers of pedestrian + bicycle tracks
many more NMT friendly kilometers
Safe route to public transport
Network map
Separated Track
Lane/Mixed traffic
Distance – 3 kmJunctions - 6Metro stations - 3 Bus stands - 1
MG Road Segment
Sidewalk fairly well defined in most stretches except near webbs jn & metro construction areas, utility & bus stand obstructions
Define zebra Xing & align sidewalk to xing
Move zebra xing left of pillar
Straight traffic lane definition +Pelican Zebra Crossing
Junctions
Trinity Circle
Mayo Hall Jn
Webbs Jn
Sidewalk width – Between 2 & 3 meters
Non existent near metro station
Church street to connect st marks road track & lavelle road to cubbon park
Obstructions
SBI/India Garage jn has very good traffic island, sidewalk good too
Distance – 2 kmJunctions - 9TTMC - 1
St Marks Road Segment
NMT friendly jn3 meter Concrete sidewalkNeed small ramps at corners
Bollard seperated cycle track
Residency Road Segment
Distance – 1.5 kmJunctions - 7Bus stands - 3
Sidewalk width uneven & junctions badly formed
Ashirvadam jn
- Redundant island- People forced to walk on the street
4 meters
Brigade road jn
Mayo hall jn
Open the access inside the mayo hall compound for NMT
Richmond Road Segment
Distance – 1.5 kmJunctions - 7Bus stands - 3Very wide road with very bad sidewalks
Try Honge
Narrower than rain trees
Cross Section
MG RoadSt Marks Road
Markings
Seperators
Before metro opensMonth 1
Month 2Residency RoadRichmond Road
Next steps