duct numbering for ee-

13
Duct numbering for EE- Wolfgang Funk - CERN CMS 23/09/2003 06.B 06.A 07.B 07.A 08.B 08.A 09.B 09.A 10.B 10.A 11.B 11.A 12.B 12.A 13.B 13.A 14.B 14.A 1

Upload: megan-douglas

Post on 03-Jan-2016

34 views

Category:

Documents


4 download

DESCRIPTION

Duct numbering for EE-. 06.B. 07.B. 06.A. 07.A. 08.B. 08.A. 09.B. 09.A. 10.B. 10.A. 11.B. 11.A. 12.B. 12.A. 13.A. 13.B. 14.A. 14.B. 23/09/2003. Wolfgang Funk - CERN CMS. 1. View towards I.P. for EE+. View from I.P. for EE-. LV 6*7.4 (259) HV 1*15.3 (184) OF 2*4.3X2 (18) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Duct numbering for EE-

Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

06.B

06.A07.B

07.A

08.B

08.A09.B

09.A

10.B

10.A

11.B

11.A

12.B 12.A

13.B13.A

14.B14.A

1

Page 2: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 05.A

Duct 05.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 2*9 (128)

LV 6*7.4 (259)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 2*9 (128)

Bret

OF 15*4.3X2 (129)HV 37*3 (262)Sniff 1*6 (29)

P F

14/23

Pret

LV 10*12.2 (1169)CO 1*14 con (154)Signal 2*10 (158)

CO 1*14 is (314mm**2)CO 1*14 con (154)

N2 1*8 (51)

snN2

Sum: (2070)

Sum: (1528)

Similar to Duct 03.B

Similar to Duct 03.A

View towards I.P. for EE+

View from I.P. for EE-

Duct 06.B

Duct 06.A

2

Page 3: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 04.A

Duct 04.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 4*4.3X2 (35) signal 2*9 (128)

LV 12*7.4 (518)HV 2*15.3 (368) signal 4*9 (256)

P FP ret

HV 37*3 (262)CO 1*14 is (314)

OF 15*4.3X2 (129)

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

P F Sum: (1847)

Sum: (2008)

Similar to Duct 02.A

Similar to Duct 02.B

Duct 07.B

Duct 07.A

3

Page 4: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 03.A

Duct 03.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 4*4.3X2 (35)signal 2*9 (128)

LV 6*7.4 (259)HV 1*15.3 (184)OF 2*4.3X2 (18)Signal 2*9 (128)

OF 15*4.3X2 (129)HV 37*3 (262)

LV 10*12.2 (1169)CO 1*14 con (154)Signal 2*10 (158)

CO 4*10 is (804mm**2)CO 1*14 is (314)CO 1*12 is (255)CO 1*14 con (154)

OESR

P FP ret

BF BF BF BF OESF

FES F

Sum: (2070)

Sum: (2532)

Similar to Duct 05.B

Similar to Duct 05.A

Duct 08.B

Duct 08.A

4

Page 5: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 02.A

Duct 02.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 2*9 (128)

LV 12*7.4 (518)HV 2*15.3 (368)OF 3*4.3X2 (27)signal 4*9 (256)

P FP ret

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

CO 2*14 is (628)Laser 1*10 (79)

OF 15*4.3X2 (129)Co 1*14 (154)

P F

MEM 12*2.2 (46)MEM 2*1.5X2 (6)

HV 37*3 (262)

Note: additional cables between MEM and balconies: LV 4*5 (88), Ving 1*5 (22), OF 2*4.3X2 (128) MEM cables (MEM 12*2.2 (46) and MEM 2*1.5X2 (6) are only between MEM and Dees

Sum: (2473)

Sum: (2659)

Sum: (2153)

Similar to Duct 04.B

Similar to Duct 04.A

DCS 1*11 (95)DCS 1*7.2 (41)DCS 1*5.8 (26)

Duct 09.B

Duct 09.A

5

P F retB ret

Page 6: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 01.A

CO 1*71 (3960)

Duct 10.B

6

Page 7: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 01.B

CO 1*71 (3960)

Duct 10.A

7

Page 8: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 18.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 2*4.3X2 (18)signal 2*9 (128)

P FP ret

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

Sum: (2153)

Similar to Duct 16.B

Duct 11.A

Duct 18.A

CO 2*14 is (628)Co 1*14 (154)

P F

HV 37*3 (262)OF 15*4.3X2 (129)

Sum: (2351)

Similar to Duct 16.A

Duct 11.B

8

P F

LV 12*7.4 (518)HV 2*15.3 (368)OF 4*4.3X2 (36)signal 4*9 (256)

DCS 1*11 (95)DCS 1*7.2 (41)DCS 1*5.8 (26)

retB ret

Page 9: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 17.A

LV 6*7.4 (259)HV 1*15.3 (184)OF 2*4.3X2 (18)Signal 2*9 (128)

LV 10*12.2 (1169)CO 1*14 con (154)Signal 2*10 (158)

P FP ret Sum: (2070)

Similar to Duct 15.A

Duct 12.B

Duct 17.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 4*4.3X2 (35)signal 2*9 (128)

CO 4*10 is (804mm**2)CO 1*14 is (314)CO 1*12 con (113)CO 1*14 con (154)

OESRBF BF BF BF OES

FSum: (2382)

Similar to Duct 15.B

Duct 12.A

FES R

9

OF 15*4.3X2 (129)HV 37*3 (262)

Page 10: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 16.A

LV 12*7.4 (518)HV 2*15.3 (368) signal 4*9 (256)

P F Sum: (1847)

Similar to Duct 18.A

Duct 13.B

Duct 16.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 4*4.3X2 (35) signal 2*9 (128)

P FP ret

LV 10*12.2 (1169mm**2)CO 1*14 con (154)

Signal 1*10 (79)

Sum: (2008)

Similar to Duct 18.B

Duct 13.A

10

HV 37*3 (262)CO 1*14 is (314)

OF 15*4.3X2 (129)

Page 11: Duct numbering for EE-

Wolfgang Funk - CERN CMS23/09/2003

Duct 15.A

LV 6*7.4 (259)OF 2*4.3X2 (18)signal 2*9 (128)

14/23

Pret

LV 10*12.2 (1169)CO 1*14 con (154)Signal 2*10 (158)

Sum: (1886)

Similar to Duct 17.A

Duct 14.B

Duct 15.B

LV 6*7.4 (259)HV 1*15.3 (184)OF 1*4.3X2 (18)signal 2*9 (128)

Bret

HV 37*3 (262)OF 15*4.3X2 (129)

Sniff 1*6 (29)

P F

CO 1*14 is (314mm**2)CO 1*14 con (154)

N2 1*8 (51)

snN2 Sum: (1641)

Similar to Duct 17.B

Duct 14.A

N2/sniff 1*12 (113)

N2

Note: ES N2 pipe is input on one Dee and output on other Dee (same diameter)

11

Page 12: Duct numbering for EE-

History

Wolfgang Funk - CERN CMS23/09/2003 12

1. Move ES services out of 10B-/10A- into 9A-/11B- (no space in ducts with ES pipes).2. Move PF from 7A- to 9A- and from 13B- to 11B- to avoid crossing of cooling pipe over

ring flange bean.3. Move half of OF from 6B-/8B-/13B-/11B- to 7A-/9A-/14A-/12A- to have less crossings.4. Move half of HV from 7A-/9A-/14A-/12A- to 6B-/8B-/13B-/11B- to have less crossings.5. Change of DCS scheme: no DCS cable anymore in 7B-/13A-, but 3 DCS cables in

9B-/11A-, no overall cross section increase.

New version 14/7/03 to avoid crossing of services at EE patch panel area according to Justin’s proposal of patch panel design of spring ’03:

New version 6/8/03 to increase LV cable sets to 20/Quadrant (before 18/Quadrant) because of new “EE-mechatronics’’ design of Tony:

1. 2 more LV EE cables each in ducts 7B-,9B-,11A-,13A- .

New version 11/8/03 to increase space in ducts for ES cooling pipes.

1. Move EE backplate return pipes from 10B-/10A- into 9A-/11B- .

Page 13: Duct numbering for EE-

History(2)

Wolfgang Funk - CERN CMS23/09/2003 13

1. Remove one OF from of 9A-.2. Remove separate LV cables for controls 14A- (are part of standard LV system)

New version 23/9/03 to adapt latest version of ES services: