dtcp demo3

30
DTCP – Layout / Building Plan - Application Online Entry Details Applicant Details Layout / Building Plan - Application Details District / Taluk / Revenue Village / Survey No. Details Ownership Document Details (Sale Deed etc.) EC Details Patta / Chitta / Adangal Details Thasildar NOC Details GPA Details Approach Road Details Check List Details

Upload: lastechsystems

Post on 11-Apr-2017

229 views

Category:

Software


7 download

TRANSCRIPT

Page 1: Dtcp Demo3

DTCP – Layout / Building Plan - Application Online Entry Details

Applicant Details

Layout / Building Plan - Application Details

District / Taluk / Revenue Village / Survey No. Details

Ownership Document Details (Sale Deed etc.)

EC Details

Patta / Chitta / Adangal Details

Thasildar NOC Details

GPA Details

Approach Road Details

Check List Details

Page 2: Dtcp Demo3

Online Application Processing System for Layouts & Building Plans

Processing Stages

1. Online Submission of Application by Applicant/LBS

2. Application Processing by LPA/NTDA/RO

3. Application Processing by DTCP Head Office

Page 3: Dtcp Demo3

Applicant / Surveyor

Online Submission

Printout of Application

Submission of Document & Printout to

Local Body

1. Online Submission of Application by Applicant / LBS

Resubmission Intimation

Demand Notice by LPA / RDD

Pays the charges submits the challan to

LPA / RDD

OnlineResubmission of Documents

A1

A2

Approval Intimation

Rejection Intimation

LPA/RDD

Page 4: Dtcp Demo3

Tapal Entry

2. Application Processing by LPA/NTDA/RDD

Within LPA / RDD powers

Technical Clearance by

DTCP HO

Approval Intimation

Tapal Clerk

Document Verification

Document Scrutiny

AD/DD

Site Inspection

Resubmission / Rejection Intimation

Site Inspection

Report

Yes

Yes

No

Local Body

A1

A2

Supervisor

Submission of Documents

Yes

No

No

Page 5: Dtcp Demo3

ApplicationTapal Entry

3. Application Processing by DTCP Head Office

Technical Clearance

Tapal Clerk

Document Verification

Supervisor

Is ScrutinyCleared ?

AD/DD/JD

Site Inspection

Is SiteInspection Cleared ?

Yes

Document Scrutiny

LPA / RDD

Resubmission / Rejection Intimation

No

Yes

No

Page 6: Dtcp Demo3

Master Plan – Area Summary

Master Plans Area in sq.km

CMDA 1 1,189

DTCP - Planned Area 27 LPA13 NTDA82 SLPA/12 R.O

122 6,950

DTCP - Non-Planned Area 12 R.O - 1,27,060

Total 1,35,199

Page 7: Dtcp Demo3

District

Taluk

Revenue Village

Corporation / Municipality /

Town Panchayat / Cantonment

Ward

Block

Survey No Town Survey No

How to specify the survey no ?

Village Survey No Town Survey No

Page 8: Dtcp Demo3

Panchayat Union (Blocks)

Panchayat Village

How to specify the Local Body ?

Corporation / Municipality /

Town Panchayat / Cantonment

RURAL URBAN

Page 9: Dtcp Demo3
Page 10: Dtcp Demo3
Page 11: Dtcp Demo3
Page 12: Dtcp Demo3
Page 13: Dtcp Demo3
Page 14: Dtcp Demo3
Page 15: Dtcp Demo3
Page 16: Dtcp Demo3
Page 17: Dtcp Demo3
Page 18: Dtcp Demo3
Page 19: Dtcp Demo3
Page 20: Dtcp Demo3
Page 21: Dtcp Demo3
Page 22: Dtcp Demo3
Page 23: Dtcp Demo3
Page 24: Dtcp Demo3
Page 25: Dtcp Demo3
Page 26: Dtcp Demo3
Page 27: Dtcp Demo3
Page 28: Dtcp Demo3
Page 29: Dtcp Demo3
Page 30: Dtcp Demo3