-dry ports structuring in turkey- - unescap.org wgdp(2... · the evolution of dry ports concept in...
TRANSCRIPT
Ministry of Transport, Maritime Affairs and Communications
of the Republic of Turkey
2nd Meeting of the Working Group on Dry Ports
-Dry Ports Structuring in Turkey-
Bülent SÜLOĞLU
Head
DG for Dangerous Goods and Combined Transport
Bangkok, 14-15 November 2017
THE CONCEPT OF DRY PORTS
Rising container flows, Crowded terminals at sea-port areas,
Prolonged dwell times for containers, Neccessity to expand,
Expansion is too costly due to prices for land
UNECE Definition: a Dry Port is simply « an inland terminal which is directly linked
to a maritime port.»
The objectives of dry ports are to enhance the maritime business…
Another definition that captures the essence of the concept of Dry ports;
« An inland intermodal terminal directly connected to seaport with high capacity
transport mean, where customers can leave/pick up their standardised units
as if directly to a seaport.»
It is a maritime-centric issue!!!
THE EVOLUTION OF DRY PORTS CONCEPT IN TURKEY
A platform further promote rail-based freight operations (rail-centric)
The idea is to increase the share of rail transport services dedicated
to seaports
In 2016, total cargo transported via rail amounted to 29 million tons of
which 10 million tons were hauled in containers.
2023 Targets: 76 million ton cargo to be transported by rail.
LOGISTICS CENTERS/INTERMODAL FREIGHT TERMINALS
21 logistics centers with rail connections enabling freight shift from road to rail.
8 out of 21 are functioning for the time being.
Additionally 34 million ton capacity and 10 million m2 stocking and handling
area for container transport
NATIONAL TRANSPORT MASTER PLANHOW TO APPROACH DRY PORT CONCEPT
• National Transport Master Plan (NTMP) process started in October 2015 and isexpected to complete by the end of the current year 2017.
• How Dry Ports are being handled within the process of NTMP?
• Dry ports must be connected by rail.
• Dry ports are designed to handle unitized Cargo.
• Dry ports are Customs-bonded.
• Dry ports are inland container depots relieving container ports fromcongestion.
In Turkey, to optimize their use and create synergies for economic growth, theyshould be combined, where possible, with:
Existing OSB (Industrial zones)
Existing and future TCDD Logistic Centers
7
BOLOGNA FREIGHT VILLAGE BOLOGNA FREIGHT VILLAGE
Özel
Sektör
Kamu
BOLOGNA FREIGHT VILLAGE BOLOGNA FREIGHT VILLAGE
Özel
Sektör
KamuKamu SektörüHALEP
Güllük
Sincan Yerköy
Karasu
Ereğli
KartalSapancaHalkalı
Turgutlu
Torbalı
Manavgat
Alanya
Aliağa
Karkamış
HaburUlukışla
Boğazköprü
Polatlı
Gemlik
Nusaybin
Cizre
Narlı
Hanlı
Mürşitpınar
ANKARAESKİŞEHİR
KAYSERİ
KONYA
ERZİNCAN
İSTANBUL
İZMİR
BALIKESİR BURSA
AFYON
UŞAKMANİSA
KARAMANANTALYA
BARTIN
TRABZON
KARS
MALATYA
ELAZIĞ
DİYARBAKIR
MARDİN
GAZİANTEP
AYDIN
ADANA
MERSİN
ADAPAZARI
EDİRNE
ŞANLIURFA
SAMSUN
ERZURUM
BİLECİK
Kurtalan
Halkalı/İstanbulKöseköy/İzmit
Kemalpaşa
Yenice/Mersin
Türkoğlu/K.maraş
Yeşilbayır/İstanbul
Ambarlı Port Kocaeli Bay Ports
İzmir Port Çandarlı Port Mersin Port
8
BOLOGNA FREIGHT VILLAGE BOLOGNA FREIGHT VILLAGE
Özel
Sektör
Kamu
BOLOGNA FREIGHT VILLAGE BOLOGNA FREIGHT VILLAGE
Özel
Sektör
KamuKamu SektörüHALEP
Güllük
Sincan Yerköy
Karasu
Ereğli
KartalSapancaHalkalı
Turgutlu
Torbalı
Manavgat
Alanya
Aliağa
Karkamış
HaburUlukışla
Boğazköprü
Polatlı
Gemlik
Nusaybin
Cizre
Narlı
Hanlı
Mürşitpınar
ANKARAESKİŞEHİR
KAYSERİ
KONYA
ERZİNCAN
İSTANBUL
İZMİR
BALIKESİR BURSA
AFYON
UŞAKMANİSA
KARAMANANTALYA
BARTIN
TRABZON
KARS
MALATYA
ELAZIĞ
DİYARBAKIR
MARDİN
GAZİANTEP
AYDIN
ADANA
MERSİN
ADAPAZARI
EDİRNE
ŞANLIURFA
SAMSUN
ERZURUM
BİLECİK
KurtalanTürkoğlu/K.maraş
Mersin Port: ▪ 4 rail tracks with 550 meters long
▪ 33 RTG
▪ 14 Reach Stacker
TURKOGLU LOGISTICS CENTREIs this a good example to be assigned as dry port in the light of
criteria introduced in E/ESCAP/DP/WG(2)/4 ?
250 km.
190 km.
İskenderun Port: ▪ 3 rail tracks with 550 meters long
▪ 16 RTG
▪ 6 Reach Stacker
TURKOGLU LOGISTICS CENTRE (CONT’D)Is this a good example to be assigned as dry port in the light
of criteria introduced in E/ESCAP/DP/WG(2)/4 ?
❖ 22 rail tracks with maximum
length of 550 metres (?) (660 m.)
❖ Axle load : 22.5 tonnes (ok!)
❖ Double-carrigeway road
connection (ok!)
❖ Internal roads’ width are 17 m.
(ok!)
❖ Container Yard Capacity: 45.000
m2 (ok!)
❖ 1 RMG and 1 reach stacker
(handling capacity limited to 10.000
TEU)
• No customs clearance facilities
• Generally serving domestic transport with bulk commodities and textile
• Turkoglu logistics centre was built by public sector (Turkish State Railways).
However, outsourcing of operation through a contract would be an option for the
future.
TARGET: %30 of road freight over 300 km should shift to other modes such as
rail or waterborne transport by 2030, and more than 50% by 2050
TEN-T in Turkey - Railways Network