(drups) and its integration in "uptime institute tier"
TRANSCRIPT
IT & INFRASTRUCTURE DATACENTERS CONGRESS
Brussels, 13th of October 2016
Yves Jansen
DIESEL ROTARY UPS (DRUPS) AND ITS INTERGRATION IN
« UPTIME INSTITUTE TIER » ARCHITECTURE BASED DATA
CENTRES
EURO‐DIESEL SADRUPS : NO‐BREAK KSTIER STANDARDNO‐BREAK KS AND THE TIER STANDARD
HQ EURO‐DIESEL SA, Belgium, Liege
EURO‐DIESEL SA
Holland
Belgium
Established in 1989
HQ Liège, Belgium
Consolidated revenue : 103 million EUR
Total number of employees : 250
Subsidiaries in Germany, UK, France, USA, Singapore, Brazil, Middle East, United Arab Emirates, Turkey, Mexico and Russia
Worldwide distributor network
Focus on power quality solutions: DRUPS
France
The Netherlands
Belgium
Luxemburg
BrusselsLiège
World Largest DRUPS Testing Facility
• 6300 M²
• Production capacity > 200 systems
• 18 Test stands
• Indoor enclosure assembly
• 50 & 60 Hz testing
• Load banks > 18 MW
• Load banks & recordings, software operated
The Facility built in 2009:
Power Quality
Building a NO‐BREAK KS® System
Stato‐Alternator Side View
ACCU‐ROTOR < 3000 RPM
MAIN SHAFT 1500 OR 1800 RPM
100 kVA to 2750 kVA (50Hz); 3000 kVA (60Hz)
NO‐BREAK KS® Conditioning Mode
NO‐BREAK KS® Conditioning Mode
•Voltage regulator •Harmonics filter•Improvement of Power factor•Elimination of Microcuts
NO‐BREAK KS® Independent Mode
NO‐BREAK KS® SYSTEM CONFIGURATIONS
FOR DATA CENTRES
UPTIME Institute Tier Standard: Topology
• The functionality
• The capacity
• The availability ( or performance)
Tier Standard Topology is an objective basis for comparing:
of a particular site infrastructure design topology against other sites
UPTIME Institute Tier Standard: Topology
• The functionality
• The capacity
• The availability ( or performance)
Tier Standard Topology is an objective basis for comparing:
of a particular site infrastructure design topology against other sites
Tier Standard describes criteria four differentiate classifications of site infrastructure
System Configurations for Data Centres
Tier I
Active Capacity Components to Support the IT Load N
Distribution Paths 1
Concurrently Maintainable No
Fault Tolerance No
Compartmentalization No
Diesel Engine Function Engine Limited on Consecutive Hours of Operation
Uptime Institute Design Criteria
System Configurations for Data Centres
Tier I Tier II
Active Capacity Components to Support the IT Load N N+1
Distribution Paths 1 1
Concurrently Maintainable No No
Fault Tolerance No No
Compartmentalization No No
Diesel Engine Function Engine Limited on Consecutive Hours of Operation
Engine Limited on Consecutive Hours of Operation
Uptime Institute Design Criteria
System Configurations for Data Centres
Tier I Tier II Tier III
Active Capacity Components to Support the IT Load N N+1 N+1
Distribution Paths 1 1 1 Active and 1 Alternative Path
Concurrently Maintainable No No Yes
Fault Tolerance No No No
Compartmentalization No No No
Diesel Engine Function Engine Limited on Consecutive Hours of Operation
Engine Limited on Consecutive Hours of Operation
Engine NO Limit on Consecutive Hours of Operation
Uptime Institute Design Criteria
System Configurations for Data Centres
Tier I Tier II Tier III Tier IV
Active Capacity Components to Support the IT Load N N+1 N+1 N: After a failure
Distribution Paths 1 1 1 Active and 1 Alternative Path 2 Simultaneously Active
Concurrently Maintainable No No Yes Yes
Fault Tolerance No No No Yes
Compartmentalization No No No Yes
Diesel Engine Function Engine Limited on Consecutive Hours of Operation
Engine Limited on Consecutive Hours of Operation
Engine NO Limit on Consecutive Hours of Operation
Engine NO Limit on Consecutive Hours of Operation
Uptime Institute Design Criteria
NO‐BREAK KS® Single System – Tier I design
• Active capacity element to support active load : N
• Distribution path: 1
• Concurrently Maintainable: NO
• Fault Tolerant: NOTIER 1
NO‐BREAK KS® LV Parallel – Tier II Design
TIER 2
Critical load
• Active capacity :
• Distribution path:
• Concurrently Maintainable:
• Fault Tolerant:
N+1
1
NO
NO
NO‐BREAK KS® LV Parallel – Tier II Design
TIER 2
Critical load
• Active capacity :
• Distribution path:
• Concurrently Maintainable:
• Fault Tolerant:
N+1
2
NO
NO
NO‐BREAK KS® LV Parallel – Tier III Design
TIER 3
Critical load
• Active capacity :
• Distribution path:
• Concurrently Maintainable:
• Fault Tolerant:
N+1
2
YES
NO
NO‐BREAK KS® LV Parallel – Tier III Design
TIER 3
Critical load
• Active capacity :
• Distribution path:
• Concurrently Maintainable:
• Fault Tolerant:
N+1
2
YES
NO
NO‐BREAK KS® LV Parallel – Tier 3 Design
TIER 3
Critical load
• Active capacity :
• Distribution path:
• Concurrently Maintainable:
• Fault Tolerant:
N+N
2
YES
YES
subject to interpretation TIER 4
NO‐BREAK KS® LV Parallel – Tier IV Design
2 NO-BREAK KS ® of 1000 kVA+ 2 NO-BREAK KS ® of 2000 kVA
ECMWF READING UK:
NO‐BREAK KS® LV Parallel – Tier IV Design
TIER 4
Critical load
• Active capacity :
• Distribution path:
• Concurrently Maintainable:
• Fault Tolerant:
N+N
2 Active
YES
YES
NO‐BREAK KS® LV Parallel – Tier IV Design
TIER 4
PROXIMUS GAM EVERE :
PROXIMUS MECHELEN:
PROXIMUS SURFHOUSE EVERE:
4+4 NO-BREAK KS ® of 1000 kVA
2+2 NO-BREAK KS ® of 1600 kVA
2+2 NO-BREAK KS ® of 1000 kVA
NO‐BREAK KS® MV Parallel – Tier IV Design
TIER 4
PROXIMUS MACHELEN: 5+5 NO-BREAK KS ® of 1700 kVA
NO‐BREAK KS® LV Parallel – Tier IV Design
TIER 4
Critical load
50%
• Active capacity :
• Distribution path:
• Concurrently Maintainable:
• Fault Tolerant:
N+N
2 Active
YES
YES
50%
Load repartition
NO‐BREAK KS® Distributed Redundant
66% 66% 66%
Load repartition
NO‐BREAK KS® Distributed Redundant
TIER 4
• Active capacity element to support active load : N+N
• Distribution path: 2 active
• Concurrently Maintainable: YES
• Fault Tolerant: YES
SOME OF OUR MAJOR REFERENCESIN DATA CENTRES
NO‐BREAK KS®5 16 x 2500 kVA, 400V
Etisalat Data Centre, Khalifa City A, Abu Dhabi, UAE
NO‐BREAK KS®5 10 x 1600 kVA, 415 V
Meeza Data Center, Qatar
NO‐BREAK KS®5 SB 18 X 1650 kVA, 400V
Standard Bank of South Africa , Samrand, Midrand
NO‐BREAK KS®5SB 2 x 2500 kVA, 13.8 kV
Telus Modular data center, Rimouski , Canada
Ascenty Data Center, Jundiaí, Brazil
NO‐BREAK KS®5SB 9 x 1700 kVA, 13,8 kV
Ascenty Data Center, Hortolândia, Brazil
NO‐BREAK KS®5SB 9 x 1700 kVA, 480 V
KEPPEL DATAHUB T27, Singapore
NO‐BREAK KS®5 6 x 2000 kVA, 415V
Cisco Systems TX‐DC2, Dallas, USA
NO‐BREAK KS®5 SB 8 x 2100 kW, 4.16 kV
NO‐BREAK KS®5 SB 16 x 2500 kVA, 400V
Natixis, France
Global Switch, London, UK
NO‐BREAK KS®5 26 x 2000 kVA, 11 kV
NO‐BREAK KS®5 8 x 2250 kVA, 11 kV
Global Switch, Sydney, Australia
Global Switch, Hong Kong
NO‐BREAK KS®7 12 x 2625 kVA, 11 kV
For More Information • Please See Us ......
Thank You For Your Attention • With Compliments
Speaker • EURO‐DIESEL SA