Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld Amy M. P. Oen Espen Eek Anita Whitlock Nybakk Audun Hauge

Upload: kenneth-wheeler

Post on 08-Jan-2018

218 views

Category:

Documents


1 download

DESCRIPTION

Dredging

TRANSCRIPT

Page 1: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Dredging 2012

THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne PettersenGijs D. BreedveldAmy M. P. OenEspen EekAnita Whitlock NybakkAudun Hauge

Page 2: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Remedial solutions in Oslo, a combination of several methods

• Dredging• Deposition of dredged material in deep water

disposal facility • Capping of deep water disposal facility by

sand• Capping of seabed with clay and sand

– The 4 R’s

Page 3: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Dredging

Page 4: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

photo by Viktor Jæger courtesy www.stopp-giftdumping.org

Page 5: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Deep water disposal facility near Malmøykalven

Page 6: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Placement of dredged material in deep water disposal facility at ~70 m water depth

Page 7: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Capping material: 0-8 mm sand

Page 8: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Capping of the deep water facility

Page 9: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Placing the cap by reversing a Hopper

Page 10: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Does the isolation cap work?

• Success criteria• Is the hole CAD area covered by

the required 0,4 m cap?• Is the cap mixed with the

underlying contaminated dredged material?

• The key is hands on control during construction

• Success criteria• Is the isolation cap clean?• Does the cap prevent

contaminant migration to the overlaying watercolumn?

• Is it tick enough to prevent animals from bioturbate into the dredged material? What is status on the recolonisation?

Page 11: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

SPI after first layer of cap

Page 12: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Map based on SPI

Map based on multibeamecho sounder

Page 13: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Geotechnical control after first layer of cap• Further capping in

layers to 0,4 m thickness is OK (safety factor of 2)

Page 14: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Control by sediment corer

Page 15: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Control by sediment corer

Page 16: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Control by measuring rods

• On the basis of the conducted measurements of cap thickness it is concluded that the requirement of 0,4 m cap is met in the entire CAD.

Page 17: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

0

4

8

12

16

20

Deponi Nord for deponi Bekkelagsbasseng Utenfor tersklene

20052009

PAH (mg/kg)

Sediment quality in the CAD area (0-5 cm)Hg Cd Pb PAH-16 PCB-7 TBT

mg/kg mg/kg mg/kg mg/kg µg/kg µg/kgConsentration

Before establishing the CAD 0,80±0,49 1,39±0,97 94±50 3,58±1,38 28±20 112±92

After capping of CAD 0,03±0,03 0,06±0,06 5,2±2,7 0,30±0,58 < 18 2,4±2,5Change in sediment quality

Persent -96 % -95 % -94 % -92 % > -47 % -98 %Statistical signifikan Yes Yes Yes Yes No Yes

Cap quality

Page 18: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Controlling the sediment to water flux of contaminants

• NGI flux chamber– Sits on seabed for ~2

months– SPMD membrane– Allow calculation of flux of

organic hydrophobic compounds

• Recommended reading: Espen Eek et. al “Field measurement of diffusional mass transfer of HOCs at the sediment-water interface”. Environ. Sci. Technol. (2010)

Page 19: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Reduction in contaminant flux after the isolation capping of the CAD by 0,4 m sand

0

500

1000

1500

2000

2500

3000

PAH-16

Flux

(ng/

m2/

day)

0

20

40

60

80

100

PCB-7

Flux

s (n

g/m

2/da

y)

Page 20: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Summary

• Deep water disposal facility is environmental efficient, especially when a contaminated area is used.

• Control during construction was important to achieve the required cap.

• For monitoring of effect, sufficient pre remedial data are important.

• Time series in monitoring after complete work to ensure the longtime effect.

Page 21: Dredging 2012 THE SUCCESSFUL USE OF AQUATIC DEPOSITION FOR 450 000 M 3 CONTAMINATED SEDIMENTS FROM OSLO HARBOR, Norway. Arne Pettersen Gijs D. Breedveld

Thank you for your attention