drawing samples 1063, 1670, 1673, 1674 solidworks acad
TRANSCRIPT
TURRET (RoHS)
TERMINAL CONTACT: MACHINED C36000 BRASS 1/2 HARDTERMINAL PLATING: SOFT NICKEL THEN SILVERDIMENSIONS APPLY AFTER PLATINGPRODUCTION BODY: BLACK NYLON 6/6 PER ASTM D4066PRODUCTION BODY MOLDED OVER CONTACT
PROTOTYPE BODY: SOMOS NEXT STEREOLITHOGRAPHY RESIN
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
ROTHENBUHLER ENGINEERING. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
ROTHENBUHLER ENGINEERING IS
PROHIBITED.
NEXT ASSY USED ON
APPLICATION
DIMENSIONS ARE IN INCHES
TOLERANCES:
LINEAR- X.X =
X.XX =
X.XXX =
ANGULAR- =
MATERIAL
FINISH
--
--
DRAWN
CHECKED
MECH.
ELEC.
APPROVED
DATE
SIZE DWG. NO. REV
SHEET 1 OF 1SCALE: 4:1
REVISIONS
DESCRIPTION DATE APPROVEDLTR
UNLESS OTHERWISE SPECIFIED:
524 RHODES ROAD, SEDRO WOOLLEY, WA 98284
BREAK ALL SHARP EDGESALL DIMENSIONS TO USAS Y14.5'66125 FINISH ALL MACHINED SURFACES
JACK, CUSTOM BANANA, BLACK
1674-22-20-2-B5B
10/7/2013Tom Jacobson
±0.010
A REMOVED DRAIN SLOTS - NO ECO
J300-167-40
CHANGED CONTACT LOCK-IN FEATURE - NO ECOB
5/16-32 UNEF-2A
A
A 00.031
0.1320.215
0.2340.2600.313
0.857
100.000°
ø 0.203ø 0.161
0.010
ø 0.142ø 0.122
0.031
0.031 0.181
0.313
0.857
0.969
ø 0.435
ø 0.098
ø 0.125
ø 0.161
ø 0.203
ø 0.225
R0.025 R0.025
0.719
SECTION A-A
9/23/14 RTREFER ECO 3706C9/23/14 RT9/23/14 RT
Gary McCoy 9/23/14
9/23/14Rich Taft
Technical Service Number: TSB-0016
Bulletin (TSB) Page: 1 of 5
TITLE: 1064-2-1 & 1072-3-2-1 RECEIVER “L7” INDUCTOR REPLACEMENT
Rothenbuhler
Engineering
Rothenbuhler Engineering Proprietary Notice This document contains information which is the exclusive property of Rothenbuhler Engineering. Distribution, reproduction, or use by others is not permitted without the express written consent of Rothenbuhler Engineering.
Signature Date
Author Gary McCoy 4/23/15
Approved Rich Taft 4/23/15
Document #: TSB0016
File Name: TSB0016 1064-2-1, 1072-3-2-1 Receiver PCBA’s.doc
Technical Service Number: TSB-0016
Bulletin (TSB) Page: 2 of 5
TITLE: 1064-2-1 & 1072-3-2-1 RECEIVER “L7” INDUCTOR REPLACEMENT
Table of Contents
Table of Contents .............................................................................................................................. 2
Table of Figures ................................................................................................................................ 2
Replacement of Toko Inductor L7 ..................................................................................................... 3
Objective of Change .......................................................................................................................... 3
Background ....................................................................................................................................... 3
Required Parts .................................................................................................................................. 4
Required Items .................................................................................................................................. 4
1064-2-3 Installation .......................................................................................................................... 4
Table of Figures
Figure 1 1064-2-3 PCB, Inductor, Adapter, Assembly View ............................................................ 4
Figure 2 1064-2-3 PCB, Inductor, Adapter, Assembly Installed ............................................................ 5
Technical Service Number: TSB-0016
Bulletin (TSB) Page: 3 of 5
TITLE: 1064-2-1 & 1072-3-2-1 RECEIVER “L7” INDUCTOR REPLACEMENT
Replacement of Toko Inductor L7
Objective of Change
The objective of this change is to replace obsolete through hole Toko Inductor p/n 5PNR-T1021Z placed as designator L7 with an adapter PCB designed to accommodate a replacement surface mount Toko Inductor p/n 614AN-9561Z.
Background
When a suitable replacement for original L7 Toko Inductor was found the mounting style changed from through hole to surface mount with a value change from 680uH to 560uH. This change resulted in necessary modifications to place L7 on current and existing 1064-2-1 and 1072-3-2-1 PCBA’s. New Toko Inductor concurrently. To correct this issue the 1064-2-3 PCB, Inductor, Adapter, Assembly was created as a drop-in replacement to fit existing Inductor L7 mounting location while necessitating the change in value for capacitor C21 from 180pH to 220pH on all 1064-2-1 and 1072-3-2-1 Receiver PCBA’s. The 1064-2-3 PCB, Inductor, Adapter will ultimately extend the maintenance life of existing units.
Technical Service Number: TSB-0016
Bulletin (TSB) Page: 4 of 5
TITLE: 1064-2-1 & 1072-3-2-1 RECEIVER “L7” INDUCTOR REPLACEMENT
Warning: The circuit board assemblies of the Receiver are susceptible to damage from Electro Static Discharge (ESD). Observe proper ESD procedures while performing this update.
Warning: Ensure power is disconnected form the Receiver while performing the upgrade.
Required Parts
(1) 1064-2-3 PCB, Inductor, Adapter, Assembly (1) (C110-220-00) Capacitor, 220pf NPO, SMD
(1.5”) #24AWG, Buss-wire
Required Items
• Soldering equipment w/ Rosin Core Solder • Clear 732 RTV Sealant.
1064-2-3 Installation
1. After the 1064-2-1 or 1072-3-2-1 Receiver PCBA has been removed from the unit following cautions and warning outlined above perform the following procedure to install the 1064-2-3 PCB, Inductor, Adapter, Assembly.
2. De-solder “L7” 680µH Inductor on the 1064-2-1-1 any Revision PCB and discard.
3. De-solder “C21” Capacitor, 180pf and discard.
4. Ensure solder is removed from all through holes of “L7” and then hand clean PCB using MEK where work has been done
5. Solder new “C21” Capacitor, 220pf in place.
6. Apply small dab of clear RTV 732 sealant to bottom side of 1064-2-3 under “L1” installed inductor prior to soldering buss wire keeping “J1” and “L7” mounting holes free of RTV.
7. Align “J1” of 1064-2-3 assembly over L7 as shown pressing firmly to set the RTV.
8. Feed #24AWG buss-wire through mounting holes “J1” and “L7” and solder buss-wire in place, then cut buss-wire and repeat for each of (7) mounting holes. Ensure buss-wire is soldered (7places) on top of 1064-2-3 PCBA and bottom side of 1064-2-1-1 PCB.
Figure 1 1064-2-3 PCB, Inductor, Adapter, Assembly View
SOLDER #24 Buss-wires BOTH SIDES
1064-2-3 PCB, Inductor, Adapter, Assembly
Clear 732 RTV SEALANT
L1 J1
L7
1064-1-1-1 PCB All Revisions
Technical Service Number: TSB-0016
Bulletin (TSB) Page: 5 of 5
TITLE: 1064-2-1 & 1072-3-2-1 RECEIVER “L7” INDUCTOR REPLACEMENT
9. Hand clean all solder joints and mask inductor L7 before using a brush to apply Humiseal 1B73 Conformal Coating to all rework areas.
Figure 2 1064-2-3 PCB, Inductor, Adapter, Assembly Installed
L7
Technical Service Number: TSB-0012 Bulletin (TSB) Page: 1 of 5
TITLE: 1072 RECIEVER
Rothenbuhler
Engineering
Rothenbuhler Engineering Proprietary Notice This document contains information which is the exclusive property of Rothenbuhler Engineering. Distribution, reproduction, or use by others is not permitted without the express written consent of Rothenbuhler Engineering.
Signature Date
Author Gary McCoy – Signature on File 2/13/14
Approved Rich Taft – Signature on File 2/13/14
Document #: TSB0012 Rev A File Name: TSB0012 REV A – 1072 Interconnect Board.PDF
Technical Service Number: TSB-0012 Bulletin (TSB) Page: 2 of 5
TITLE: 1072 RECIEVER
REVISION HISTORY SHEET
ISSUE
DATE
REASON FOR CHANGE REVISED BY PAST ISSUE
STATUS
A 2/13/14 Remove the Venting “NIB” from K1 (R050-083-00) and K2 (R050-085-00) after all spraying and/or washing is complete for all new and existing 1072 Receivers.
GM C
PAST ISSUE STATUS: C = CURRENT; O = OBSOLETE
Technical Service Number: TSB-0012 Bulletin (TSB) Page: 3 of 5
TITLE: 1072 RECIEVER
Table of Contents Revision History Sheet .......................................................................................................................... 2 Table of Contents .................................................................................................................................. 3
Table of Drawings ................................................................................................................................. 3
Objective of Change ............................................................................................................................. 4
Background ........................................................................................................................................... 4
Replacement Instruction ECO 3659 ...................................................................................................... 4
Rework Instructions from ECO 3659 ..................................................................................................... 4
Table of Drawings 1072-3-4-B0 Rev K Assembly .............................................................................................................. 5
Technical Service Number: TSB-0012 Bulletin (TSB) Page: 4 of 5
TITLE: 1072 RECIEVER
Rothenbuhler Engineering Service Center Information Packet 1072 Receiver
Objective of Change The objective of this change is to improve the performance and longevity of the 1072 Whistle Receiver relays on all new and existing 1072 Receivers.
Background Relay K1 has had ongoing issues with sticking contacts in the field. The relay manufacturer recommends that the venting “NIB” be removed to allow pressure relief and maximize electrical longevity. Relay K2 should also be vented.
Replacement Instruction ECO 3659 1) 1072-3-4 Interconnect Board Assembly
a. If replacing components K1 Relay, 5v, SPDT, 20A (T90S5D12-5) (R050-083-00) and/or K2 Relay, 12 VDC, mini (RoHS) (R050-085-00) remove and install new components.
b. After installation it is necessary to clean and spray work area with humiseal, making sure components are masked properly as described in notes on the 1072-3-4-B0 Rev K Assembly Figure 1 drawing.
c. After cleaning and spraying has been performed remove venting “NIB” with a sharp knife. Refer to 1072-3-4-B0 Rev K Assembly Figure 1 for “NIB” location.
Rework Instruction from ECO 3659 1) 1072-3-4 Interconnect Board Assembly
a. Remove venting “NIB” with a sharp knife on K1 Relay, 5v, SPDT, 20A (T90S5D12-5) (R050-083-00) and/or K2 Relay, 12 VDC, mini (RoHS) (R050-085-00) as units come in for repair or for routine service. Venting “NIB” is shown on 1072-3-4-B0 Rev K Assembly Figure 1 as a reference when removing.
Technical Service Number: TSB-0012 Bulletin (TSB) Page: 5 of 5
TITLE: 1072 RECIEVER
1072-3-4-B0 Rev K Assembly Figure 1
Number: AMP-126
Manufacturing Process Revision: C
Specification (AMP) Page: 1 of 6
TITLE: 1063-1-3 SWITCH ASSEMBLY
NAME FUNCTION SIGNATURE DATE
PREPARED BY: Gary McCoy Document Control Signature on File 6-18-15
AUTHORIZED BY: Rich Taft Engineering Manager Signature on File 6-24-15
Deborah Gregory Production Coordinator Signature on File 6-18-15
Steve Winters Operations Manager
Quality Manager Signature on File 6-24-15
Glenda Ransberger Production Supervisor Signature on File 6-18-15
Rothenbuhler Engineering Proprietary Notice
This document contains information which is the exclusive property of Rothenbuhler Engineering. Distribution, reproduction, or use by others is not permitted without the express written consent of Rothenbuhler Engineering.
Number: AMP-126
Manufacturing Process Revision: C
Specification (AMP) Page: 2 of 6
TITLE: 1063-1-3 SWITCH ASSEMBLY
REVISION HISTORY SHEET
ISSUE
DATE
REASON FOR CHANGE
REVISED BY
PAST ISSUE
STATUS
A 07/12/07 Initial Release NA O
B 6/8/09 Update instructions to clarify that the cork washer is used. Included lock washer is not used.
LLN O
C 6/26/15 Changed # of ties in assembly from 4 to 2. Specified orientation of wire routing for use in the 1100 assemblies. Updated Switch Illustration 1-1.
GMM C
PAST ISSUE STATUS: C = CURRENT; O = OBSOLETE
Number: AMP-126
Manufacturing Process Revision: C
Specification (AMP) Page: 3 of 6
TITLE: 1063-1-3 SWITCH ASSEMBLY
1. PURPOSE
1.1. This work procedure is for the preparation and assembly of the switch.
2. SCOPE
2.1. This work instruction procedure covers the tools required, drawings to be referenced, and instructions to be followed in the factory’s preparation and assembly of the switch.
3. RESPONSIBILITY
3.1. The Assembly Supervisor will update this work instruction as required.
3.2. The Production Supervisor, Quality Manager, Engineering Manager, and Operations Manager will approve any changes to this instruction by signing the cover sheet.
3.3. Document Control will maintain this instruction on the Quality drive such that only the most current version is available to all relevant workers.
3.4. The Production workers will reference this work instruction when preparing and assembling the sub-components of the switch.
4. DEFINITION
4.1. None
5. REFERENCES
5.1. Part Number: 1063-1-3
5.2. Description: Switch Assembly
5.3. Drawing Number: 1063-1-3-AO Revision: current revision
Number: AMP-126
Manufacturing Process Revision: C
Specification (AMP) Page: 4 of 6
TITLE: 1063-1-3 SWITCH ASSEMBLY
6. PROCEDURE
6.1. Special Tools and Supplies Required: (All tools should be calibrated as required per the calibration schedule)
6.1.1. needle nose pliers
6.1.2. dikes (diagonal cutters)
6.1.3. ruler
6.1.4. crimping tool # 90289-1
6.1.5. rosin core wire solder
6.1.6. solder iron
6.1.7. switch wiring jig
6.1.8. Paladin wire strippers (or equivalent)
6.2 Work Instructions (Per approved drawings, assemble sub-components as follows):
6.2.1 Cut 24 AWG wires to 7 ¼” lengths. WIRE LENGTH IS CRITICAL.
6.2.2 Strip wire insulation 1/8” on one end.
6.2.3 Use the 90289-1 crimping tool to attach a connector pin to each of the stripped ends. Have crimped pins inspected.
6.2.4 Insert the connector pins into housing as shown on drawing.
6.2.5 Strip the insulation on opposite end of wires ¼” and tin.
6.2.6 Cut 20 AWG buss wire to 2” lengths.
6.2.7 Place (2) switches into the switch wiring jig as oriented on drawing (terminal 2 is away from you, terminal 1 is towards you, terminal 3 is to the left, and terminal 4 is to the right).
6.2.8 Solder the 20 AWG buss wire between terminal 4 of left switch and terminal 3 of right switch as shown on drawing. The wire shall run through the hole in the terminal and be wrapped to contact both sides of the terminal. Solder the buss wire to the switches so that the wire has an “S” in it for stress relief. Do not completely fill the pin 3 hole with solder as you will need to solder the brown wire to this same pin.
Number: AMP-126
Manufacturing Process Revision: C
Specification (AMP) Page: 5 of 6
TITLE: 1063-1-3 SWITCH ASSEMBLY
6.2.9 Solder the 24 AWG wires to the appropriate terminals. These wires need to be attached in the same manner; the wire shall run through the hole in the terminal and be wrapped to contact both sides of the terminal.
Red = pin 3 of left switch
Brown = pin 3 of right switch
Orange = pin 4 of right switch
6.2.10 Attach (2) cable ties to switch assembly as shown in illustration below.
Illustration 1-1
Number: AMP-126
Manufacturing Process Revision: C
Specification (AMP) Page: 6 of 6
TITLE: 1063-1-3 SWITCH ASSEMBLY
6.2.11 Install the cork washer and a nut on each switch (hardware included; if lock washer is included it can be disposed of).
6.2.12 Deliver completed switch assemblies to inspection. Inspector will inspect and test switches then return them for conformal coating process.
6.2.13 Using cardboard switch holder jig located in cabinet; insert switches into holes wire side up and keep all the switch assemblies aligned in the same direction.
6.2.14 Place switches in conformal coating booth, push-button of switch facing down. Spray only the back side of switches with Humiseal 1B73 Conformal coating. Do not spray connector housing or push-button side of switch.
7. Attachments
7.1. None
NOTE(S) (UNLESS OTHERWISE STATED):
2. SKIVE FOAM FOR LOWER LAYER TO 0.500".3. USE REMAINING 2.000" FOR UPPER LAYER, THEN DIE CUT.
MATERIAL = 2.5" 1.7 CHARCOAL POLYETHYLENE FOAM.
1. CHAMFER CORNERS BEFORE SKIVING.
REFER ECO 3691A
7
D
C
B
AA
B
C
D
1234568
8 7 6 5 4 3 2 1
E
F
E
F
1678-18-1-D5SHEET 1 OF 5
4/22/13Gary McCoyUNLESS OTHERWISE SPECIFIED:
SCALE: 4:5 F300-322-00
REVDWG. NO.
DSIZE
TITLE:
DATE
APPROVED
ELEC.
MECH.
CHECKED
DRAWN
DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONAL ±ANGULAR: MACH ± BEND ±TWO PLACE DECIMAL ±THREE PLACE DECIMAL ±
APPLICATION
USED ONNEXT ASSY
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OFROTHENBUHLER ENGINEERING. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OFROTHENBUHLER ENGINEERING IS PROHIBITED.
A
ROTHENBUHLER ENGINEERINGRHODES ROAD - SEDRO WOOLLEY, WASHINGTON - 98284
BREAK ALL SHARP EDGESALL DIMENSIONS TO ASME Y14.5'94 ALL MACHINED SURFACES
ALL ANGLES AND BENDS 90 °
CONSTRUCT IN ACCORDANCE WITHIPC/IEA J-STD-001C CLASS IIIINSPECT IN ACCORDANCE WITHIPC-A-610C CLASS III
APPROVEDDATEDESCRIPTIONLTRREVISIONS
8 POSITION FOAM SET, UPPER LAYER0.010
0
0.75
01.
250
2.85
03.
450
7.87
58.
525
8.67
59.
150
9.27
59.
400
9.85
010
.039
15.5
5016
.450
16.6
6416
.789
16.8
2516
.907
16.9
8817
.113
17.2
0017
.428
18.0
8618
.725
18.7
7518
.925
19.0
1219
.137
19.2
1919
.300
19.4
7519
.675
20.5
75
26.1
0026
.275
26.7
2526
.850
26.9
7527
.450
27.6
0028
.250
32.1
7532
.775
34.8
75
35.6
25
00.6120.7191.674
2.6743.1123.4873.5693.6193.7374.2464.3754.4374.4876.9967.1257.1877.3007.7547.8268.2638.6198.9349.1269.2519.3269.826
10.50410.57610.70011.26311.45011.95012.26313.01313.625 R0.437
NOTE 14 PLACESR0.125
130 PLACES
0
2.000
Gary McCoy 6/25/14
Rich Taft 6/25/13
LOWER LAYER MATERIAL = 0.5" 1.7 CHARCOAL POLYETHYLENE FOAM.
1. DIE CUT WITH SKIVE SIDE DOWN.NOTE(S) UNLESS OTHERWISE STATED:
0.010
D
C
B
AA
B
D
12345678
8 7 6 5 4 3 2 1
E
F
E
F
1678-18-1-D5SHEET 2 OF 5
8 POSITION FOAM SET,LOWER LAYER
4/22/13Gary McCoyUNLESS OTHERWISE SPECIFIED:
SCALE: 4:5 F300-322-00
REVDWG. NO.
DSIZE
TITLE:
DATE
APPROVED
ELEC.
MECH.
CHECKED
DRAWN
DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONAL ±ANGULAR: MACH ± BEND ±TWO PLACE DECIMAL ±THREE PLACE DECIMAL ±
APPLICATION
USED ONNEXT ASSY
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OFROTHENBUHLER ENGINEERING. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OFROTHENBUHLER ENGINEERING IS PROHIBITED.
A
ROTHENBUHLER ENGINEERINGRHODES ROAD - SEDRO WOOLLEY, WASHINGTON - 98284
BREAK ALL SHARP EDGESALL DIMENSIONS TO ASME Y14.5'94 ALL MACHINED SURFACES
ALL ANGLES AND BENDS 90 °
CONSTRUCT IN ACCORDANCE WITHIPC/IEA J-STD-001C CLASS IIIINSPECT IN ACCORDANCE WITHIPC-A-610C CLASS III
APPROVEDDATEDESCRIPTIONLTRREVISIONS
C
00.500
00.612
1.674
2.5002.6743.112
4.4874.650
7.3007.826
8.9348.9759.1269.2519.826
10.07610.57610.70011.12511.20011.26311.45011.95012.26313.01313.625
0
1.00
0
3.45
0
8.52
58.
675
9.15
09.
400
9.85
0
16.4
5016
.789
16.8
2516
.907
16.9
8817
.113
17.2
0017
.428
18.0
8618
.775
18.9
2519
.012
19.1
3719
.219
19.3
0019
.675
26.2
7526
.725
26.9
7527
.450
27.6
00
32.1
75
35.6
25
R0.12578 PLACES
Gary McCoy 6/25/14
6/25/13Rich Taft
(2.00" PEAK, 0.75" VALLEY, 2.75" OVERALL)CASE TOP FOAM MATERIAL = CONVOLUTED POLYURETHANE CHARCOAL FOAM, PU90
0.010
A
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
E
F
1678-18-1-D5SHEET 3 OF 5
8 POSITION FOAM SET,TOP FOAM
4/22/13Gary McCoyUNLESS OTHERWISE SPECIFIED:
SCALE: 1:2 F300-322-00
REVDWG. NO.
DSIZE
TITLE:
DATE
APPROVED
ELEC.
MECH.
CHECKED
DRAWN
DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONAL ±ANGULAR: MACH ± BEND ±TWO PLACE DECIMAL ±THREE PLACE DECIMAL ±
APPLICATION
USED ONNEXT ASSY
PROPRIETARY AND CONFIDENTIAL
A
ROTHENBUHLER ENGINEERINGRHODES ROAD - SEDRO WOOLLEY, WASHINGTON - 98284
BREAK ALL SHARP EDGESALL DIMENSIONS TO ASME Y14.5'94 ALL MACHINED SURFACES
ALL ANGLES AND BENDS 90 °
CONSTRUCT IN ACCORDANCE WITHIPC/IEA J-STD-001C CLASS IIIINSPECT IN ACCORDANCE WITHIPC-A-610C CLASS III
APPROVEDDATEDESCRIPTIONLTRREVISIONS
THE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OFROTHENBUHLER ENGINEERING. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OFROTHENBUHLER ENGINEERING IS PROHIBITED.
0
35.3
75
0
13.604
Gary McCoy 6/25/14
6/25/13Rich Taft
USE MATERIAL FROM 2.0" CUT OUTS AND SKIVE FOR CORRECT SIZE1.OF INSERT. PRESERVE NON SKIVE SIDE.
NOTE(S) UNLESS OTHERWISE STATED:
0.010
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
E
F
1678-18-1-D5SHEET 4 OF 5
8 POSITION FOAM SET,INSERT
4/22/13Gary McCoyUNLESS OTHERWISE SPECIFIED:
SCALE: 2:1 F300-322-00
REVDWG. NO.
DSIZE
TITLE:
DATE
APPROVED
ELEC.
MECH.
CHECKED
DRAWN
DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONAL ±ANGULAR: MACH ± BEND ±TWO PLACE DECIMAL ±THREE PLACE DECIMAL ±
APPLICATION
USED ONNEXT ASSY
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OFROTHENBUHLER ENGINEERING. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OFROTHENBUHLER ENGINEERING IS PROHIBITED.
A
ROTHENBUHLER ENGINEERINGRHODES ROAD - SEDRO WOOLLEY, WASHINGTON - 98284
BREAK ALL SHARP EDGESALL DIMENSIONS TO ASME Y14.5'94 ALL MACHINED SURFACES
ALL ANGLES AND BENDS 90 °
CONSTRUCT IN ACCORDANCE WITHIPC/IEA J-STD-001C CLASS IIIINSPECT IN ACCORDANCE WITHIPC-A-610C CLASS III
APPROVEDDATEDESCRIPTIONLTRREVISIONS
5.700
1.50
0
R0.1254 PLACES
5.700
0.80
0
0.800
1.50
0
Gary McCoy 6/25/14
6/25/13Rich Taft
1. CENTER UPPER LAYER SKIVE SIDE DOWN ON TO LOWER LAYER SKIVE SIDE DOWN AND HEAT WELD LAYERS TOGETHER.THEN CHAMFER AT A 45° ANGLE SO THAT EACH BOTTOM EDGE HAS 0.500" REMOVED.
2. PLACE INSERT 1 WITH SKIVE SIDE DOWN AND WELD.
NOTE(S) UNLESS OTHERWISE STATED:
3. RETAIN BLOCKS WITH SKIVE SIDE DOWN. DO NOT WELD.
0.010
4. AFTER ASSEMBLY MAKE FINAL CUT AS SHOWN IN SECTION A-A.
D
C
B
AA
B
C
D
12345678
8 7 6 5 4 3 2 1
E
F
E
F
1678-18-1-D5SHEET 5 OF 5
8 POSITION FOAM SETASSEMBLY
4/22/13Gary McCoyUNLESS OTHERWISE SPECIFIED:
SCALE: 1:2 F300-322-00
REVDWG. NO.
DSIZE
TITLE:
DATE
APPROVED
ELEC.
MECH.
CHECKED
DRAWN
DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONAL ±ANGULAR: MACH ± BEND ±TWO PLACE DECIMAL ±THREE PLACE DECIMAL ±
APPLICATION
USED ONNEXT ASSY
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OFROTHENBUHLER ENGINEERING. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OFROTHENBUHLER ENGINEERING IS PROHIBITED.
A
ROTHENBUHLER ENGINEERINGRHODES ROAD - SEDRO WOOLLEY, WASHINGTON - 98284
BREAK ALL SHARP EDGESALL DIMENSIONS TO ASME Y14.5'94 ALL MACHINED SURFACES
ALL ANGLES AND BENDS 90 °
CONSTRUCT IN ACCORDANCE WITHIPC/IEA J-STD-001C CLASS IIIINSPECT IN ACCORDANCE WITHIPC-A-610C CLASS III
APPROVEDDATEDESCRIPTIONLTRREVISIONS
4.65
0
2.15
0
4.65
0
2.15
0
AA
0.30
0
1.000
SECTION A-A
SCALE 1 : 1
NOTE 4
NOTE 3
NOTE 38 PLACES INSERT 1
NOTE 24 PLACES
12
34
56
78
0.50
0
0.500
NOTE 1
Gary McCoy 6/25/14
6/25/13Rich Taft