drawing index jblm - mcchord express image … · cover and drawing index jblm - mcchord express...

14
PROJECT LOCATION DRAWN BY: DRAWN BY: DRAWN BY: DRAWN BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: DESIGN TYPE: DESIGN TYPE: DESIGN TYPE: DESIGN TYPE: DESIGN PHASE: DESIGN PHASE: DESIGN PHASE: DESIGN PHASE: DATE SUBMITTED: DATE SUBMITTED: DATE SUBMITTED: DATE SUBMITTED: PROJECT: PROJECT: PROJECT: PROJECT: DRAWING TITLE: DRAWING TITLE: DRAWING TITLE: DRAWING TITLE: DESIGN SIZE: DESIGN SIZE: DESIGN SIZE: DESIGN SIZE: SCALE: SCALE: SCALE: SCALE: S S SH H HE E EE E ET T T: : : EXCHANGE Project Team Signatures 3/16" = 1'-0" LAW KJM 100% BID DOCUMENTS SEPTEMBER 19, 2014 G-001 COVER AND DRAWING INDEX JBLM - McCHORD EXPRESS IMAGE UPGRADE BUILDING 545 PN: 4915-12-006 JBLM - McCHORD EXPRESS IMAGE UPGRADE BUILDING 545 PN: 4915-12-006 100% BID DOCUMENTS SEPTEMBER 19, 2014 OWNER - ARMY AND AIR FORCE EXCHANGE SERVICE (AAFES) CONTACT - GUS HAMSHO 3911 S. WALTON WALKER BLVD. DALLAS TX, 75236-1598 214.312.6215 [email protected] www.aafes.com ALSC ARCHITECTS, P.S. CONTACT - LESA A. WEBB / KEN MURPHY 203 NORTH WASHINGTON, SUITE 400 SPOKANE, WA 99201 509.838.8568 PHONE 509.458.3710 FAX [email protected] [email protected] www.alscarchitects.com RIVERSIDE ENGINEERING, PLLC CONTACT - MICHAEL HUBBARD 816 W. FRANCIS AVE., #381 SPOKANE, WA 99205 509.343.6963 [email protected] www.nwme.net DEI ELECTRICAL CONSULTANTS, INC. CONTACT - ERIC SHIRLEY 2205 N WOODRUFF RD, SUITE 5 SPOKANE VALLEY, WA 99206 509.747.5139 [email protected] www.deicorp.com DRAWING INDEX GENERAL G-001 COVER AND DRAWING INDEX G-002 ABBREVIATIONS / SYMBOLS AND MATERIAL LEGEND ARCHITECTURAL A-100 PHASING PLAN A-101 DEMO PLAN A-102 FLOOR PLAN - DOOR SCHEDULE - DETAILS A-103 PHOTO SHEET A-104 PHOTO SHEET A-251 INTERIOR ELEVATIONS, FINISH LEGEND & FINISH SCHEDULE A-401 ENLARGED PLANS, ELEVATIONS & SCHEDULES MECHANICAL M-001 LEGENDS, ABBREVIATIONS AND GENERAL NOTES M-101 SCHEDULES M-201 FLOOR PLAN ELECTRICAL E-100 SYMBOLS / NOTES / SCHEDULES E-101 SNACK AVENUE - POWER PLAN VICINITY MAP BASE MAP EXCHANGE - CO EXCHANGE - PM GENERAL CONTRACTOR ARCHITECT / ENGINEER SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Revision Schedule Revision # Revision Description Revision Date

Upload: buidieu

Post on 28-Apr-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

PROJECT LOCATION

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

EXCHANGE

Project Team

Signatures

3/16" = 1'-0"

LAW

KJM

100% BID DOCUMENTS

SEPTEMBER 19, 2014

G-001

COVER AND DRAWINGINDEX

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

JBLM - McCHORD EXPRESSIMAGE UPGRADEBUILDING 545

PN: 4915-12-006100% BID DOCUMENTSSEPTEMBER 19, 2014

OWNER - ARMY AND AIR FORCE EXCHANGE SERVICE (AAFES)CONTACT - GUS HAMSHO3911 S. WALTON WALKER BLVD.DALLAS TX, [email protected]

ALSC ARCHITECTS, P.S.CONTACT - LESA A. WEBB / KEN MURPHY203 NORTH WASHINGTON, SUITE 400SPOKANE, WA 99201509.838.8568 PHONE509.458.3710 [email protected]@alscarchitects.comwww.alscarchitects.com

RIVERSIDE ENGINEERING, PLLCCONTACT - MICHAEL HUBBARD816 W. FRANCIS AVE., #381SPOKANE, WA [email protected]

DEI ELECTRICAL CONSULTANTS, INC.CONTACT - ERIC SHIRLEY2205 N WOODRUFF RD, SUITE 5SPOKANE VALLEY, WA [email protected]

DRAWING INDEX

GENERAL

G-001 COVER AND DRAWING INDEX

G-002 ABBREVIATIONS / SYMBOLS AND MATERIAL LEGEND

ARCHITECTURAL

A-100 PHASING PLAN

A-101 DEMO PLAN

A-102 FLOOR PLAN - DOOR SCHEDULE - DETAILS

A-103 PHOTO SHEET

A-104 PHOTO SHEET

A-251 INTERIOR ELEVATIONS, FINISH LEGEND & FINISHSCHEDULE

A-401 ENLARGED PLANS, ELEVATIONS & SCHEDULES

MECHANICAL

M-001 LEGENDS, ABBREVIATIONS AND GENERAL NOTES

M-101 SCHEDULES

M-201 FLOOR PLAN

ELECTRICAL

E-100 SYMBOLS / NOTES / SCHEDULES

E-101 SNACK AVENUE - POWER PLAN

VICINITY MAP

BASE MAP

EXCHANGE - CO

EXCHANGE - PM

GENERAL CONTRACTOR

ARCHITECT / ENGINEER

SIGNATURE DATE

SIGNATURE DATE

SIGNATURE DATE

SIGNATURE DATE

Revision Schedule

Revision #

Revision

Description Revision Date

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

LAW

KJM

100% BID DOCUMENTS

SEPTEMBER 19, 2014

G-002

ABBREVIATIONS /SYMBOLS ANDMATERIAL LEGEND

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

CLCL

LEGENDS & SYMBOLS

UNRATED WALL

FIRE RATED WALL RATING BASED ON TYPE

THERMAL OR ACOUSTICAL

WALL LEGEND

CONCRETE WALL C.I.P.C/P.C.C.

CMU WALL

EXISTING CONCRETE OR CMU

WALL REFERENCE

COLUMN REFERENCE/GRID BUBBLES

MATCHLINE

SECTION REFERENCE

ELEVATION REFERENCE

DETAIL & ENLARGED PLAN REFERENCE

WINDOW REFERENCE

DOOR REFERENCE

ROOM NAME & NUMBER REFERENCE

FINISH/MATERIAL REFERENCE

ELEVATION INDICATORS

REVISION INDICATOR & NORTH ARROW

PROPERTY LINE

CENTER LINE

CONTOUR LINES

SIGNAGE SYMBOL

KEYNOTE SYMBOL

SPECIALTY EQUIPMENT

REFERENCE SYMBOL LEGEND

MATCHLINE - SEE SHEET A100

ICON LEGEND

FLOOR DRAIN

FIRE EXTINGUISHER & HOSE CABINET

FIRE EXTINGUISHER CABINET

FIRE SPRINKLER HEAD

RETURN/EXCHANGE AIR GRILL 2' x 2'

SUPPLY AIR GRILL 2' x 2'

RECESSED FLUORESCENT 2' x 2'

RECESSED FLUORESCENT 2' x 4'

RECESSED FLUORESCENT 1' x 4'

SURFACE MOUNTED FLUORESCENT

RECESSED CAN

1

A100

SHEET REFERENCE1

A100

SHEET REFERENCE

1

A100

1

A100

SHEET REFERENCE

WINDOW ALPHA DESIGNATION1t

DOOR NUMBER

ROOM NAME

101

ROOM NAME

ROOM NUMBER

SQUARE FOOTAGE

MM 101 REFERENCE NUMBER

FINISH TYPE

NAME

TYPE

HEIGHT

1

NORTH

PR

OJE

CT

300 WALL TYPE

SECTION REFERENCE

ELEVATION REFERENCE

24

3

EXTERIOR INTERIOR

CALLOUT REFERENCE

150 SF

ELEVATIONSECTION/ELEVATION/FLOOR PLAN

A VARIES

FLOOR/CEILING PLAN

TRUE

FD

FEHC

FEC

EARTHWORK CONCRETE & MASONRY WOOD

METAL

EARTHWORK - UNMOVED

INSULATION

EARTHWORK - BACKFILLED

GRAVEL/POROUS FILL

FINISH

ROUGH

BLOCKING

PLYWOOD

PRECAST/CAST IN PLACE

STEEL

SAND/MORTAR/PLASTER

BATT/LOOSE FILL

RIGID

CONCRETE BLOCK

BRICK

A

1 2NUMBERS FOR VERTICAL GRIDSLETTERS FOR HORIZONTAL GRIDS

NEW

EXISTING

76

72

203B

1

1

XXX

SIGN DESIGNATION PER SPECIFICATIONS

SIGN DESIGNATION PER SPECIFICATIONS

ARCHITECTURAL ABBREVIATIONS& AND

ANGLE@ ATC CENTER LINEO DIAMTER or ROUND┴ PERPENDICULAR# POUNDS or NUMBERx TIMES or BYP PROPERTY LINE

'A'AB ANCHOR BOLTABC AGGREGATE BASE COURSEABV ABOVEAC ASPHALTIC CONCRETEA/C AIR CONDITIONINGACC ACCESSACFL ACCESS FLOORACID RES ACID RESISTANTACP ACOUSTICAL PANELACT ACOUSTICAL TILEAD AREA DRAINADD ADDENDUMADH ADHESIVEADJT ADJUSTABLEAF ACCESS FLOORAFF ABOVE FINISH FLOORAFG ABOVE FINISH GRADEAFS ABOVE FINISH SLABAGGR AGGREGATEALT ALTERNATEALUM ALUMINUMANOD ANODIZEDAP ACCESS PANELAPC ACOUSTICAL PANEL CEILINGAPPROX APPROXIMATE(LY)ARCH ARCHITECT(URAL)ASB ASBESTOSASKLR AUTOMATIC SPRINKLERASPH ASPHALTASSY ASSEMBLYASTM AMERICAN SOCIETY for TESTING

& MATERIALSATC ACOUSTICAL TILE CEILINGATF ATHLETIC FLOORINGAUTO AUTOMATICAWP ACOUSTICAL WALL PANEL

'B'BALC BALCONYBB BULLETIN BOARDBD BOARDBEL BELOWBET BETWEENBITUM BITUMINOUSBKG BACKINGBJT BED JOINTBLDG BUILDINGBLKG BLOCKINGBLTN BUILT-INBM BEAMBOD BOTTOM OF DECKBOF BOTTOM OF FOOTINGBOH BACK OF HOUSEBOJ BOTTOM OF JOISTSBOT BOTTOMBPL BEARING PLATEBR BEDROOMBRCG BRACINGBRG BEARINGBRK BRICKBRZ BRONZEBS BOTH SIDESBSMT BASEMENTBUR BUILT-UP ROOF(ING)BVL BEVELBW BOTH WAYS

'C'CAB CABINETCB CATCH BASIN, CORNER BEADCAN CANOPYCANTIL CANTILEVERCBB CEMENTITIOUS (BACKER)

BOARDCEM CEMENTCER CERAMICCF CONTRACTOR FURNISHEDCF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLEDCF/OI CONTRACTOR FURNISHED/

OWNER INSTALLEDCFE CONTRACTOR FURNISHED

EQUIPMENTCFLG COUNTERFLASH(ING)CFT CUBIC FOOTCG CORNER GUARDCH BD CHALKBOARDCHFR CHAMFERCHT CEILING HEIGHTCI CAST IRONCIP(C) CAST-IN-PLACE (CONCRETE)CIR CIRCLE/CIRCULARCIRC CIRCUMFERENCECJ CONTROL JOINT,

CONSTRUCTION JOINGCK CAULK(ING)CLG CEILINGCLL CONTRACT LIMIT LINECLR CLEAR(ANCE)CLRM CLASSROOMCLS CLOSURECMT CERAMIC MOSAICCMU CONCRETE MASONRY UNIT(S)CMPST COMPOSITECNTR COUNTERCO CLEANOUT, CASED OPENING,

CUTOUTCOL COLUMNCOMB COMBINE/COMBINATIONCOMP COMPRESS(ED/ION/IBLE)COMPO COMPOSITION/COMPOSITECOMPT COMPARTMENTCONC CONCRETECONF CONFERENCECONN CONNECTCONST CONSTRUCTIONCONT CONTINUE/CONTINUOUSCONTR CONTRACTORCOR CORRIDORCORR CORRUGATEDCOTG CLEANOUT TO GRADECPLP CEMENT PLASTER (PORTLAND)CPR COPPERCPT CARPETCR CLOSET RODCRG CROSS GRAINCRS COURSECRT YD COURTYARDCSK COUNTERSINK(SUNK)CSMT CASEMENTCST CAST STONECSWK CASEWORKCT CERAMIC TILECTB CERAMIC TILE BASECTR CENTERCU FT CUBIC FEETCU YD CUBIC YARD(S)CW COLD WATER

'D'D DEEP, DEPTHDBL DOUBLEDEG DEGREEDEMO DEMOLISH/DEMOLITIONDET DETAILDEP DEPRESSEDDF DRINKING FOUNTAINDH DIAGONAL HUNGDIA DIAMETERDIAG DIAGONAL, DIAGRAMDIAM DIAMETERDIM DIMENSIONDISP DISPENSERDIV DIVISIONDL DEAD LOADDMPF DAMPROOF(ING)DMT DEMOUNTABLEDN DOWNDP DAMP PROOFINGDPR DAMPERDR DOOR, DINING ROOM,

DRESSING ROOM, DRIVEDRN DRAINDRST DOOR STOPDS DOWNSPOUTDSP DRY STANDPIPEDSPL DISPOSALDT DRAIN TILEDTA DOVETAIL ANCHORDTL DETAILDTS DOVETAIL ANCHOR SLOTDW DUMBWAITERDWG DRAWINGDWR DRAWER

'E"E EAST(E) EXISTINGEA EACHEHD ELECTRIC HAND DRYEREIFS EXTERIOR INSULATION

FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELEC ELECTRIC(AL)

ELEV ELEVATOREMER EMERGENCYENCL ENCLOSUREENGR ENGINEERENTR ENTRANCEESMT EASEMENTEP ELECTRICAL PANELEQ EQUALEQUIP EQUIPMENTEST ESTIMATEEW EACH WAYEWC ELECTRICAL WATER COOLEREXCA EXCAVATE(ION)EXH FN EXHAUST FANEXH HD EXHAUST HOODEXIST EXISTINGEXP EXPANSION, EXPOSED,

EXPOSUREEXP BT EXPANSION BOLTEXT EXTERIOREXT LT EXIT LIGHT

'F'FA FIRE ALARM, FRESH AIRFACP FIRE ALARM CONTROL PANELFAS FASTEN(ER)FB FLAT BARFBD FIRE BOARDFBRK FIRE BRICKFBO FURNISHED BY OTHERSFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDTN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FACTORY FINISHFF EL FINISH FLOOR ELEVATIONFF&E FURNITURE, FIXTURE &

EQUIPMENTFFL FINISHED FLOOR LINEFGL FIBERGLASSFH FIRE HYDRANTFHC FIRE HOSE CABINETFIN FINISH(ED)FIN FLR FINISH FLOORFIN GR FINISH GRADEFJT FLUSH JOINTFLA FLASHINGFLCO FLOOR CLEAN OUTFLG FLASHINGFLR FLOOR, FILLERFLUOR FLUORESCENTFND FOUNDATIONFO FINISH OPENINGFOB FACE OF BRICKFOC FACE OF CONCRETEFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF STUD(S)FP FIREPROOFFPL FLOOR PLATEFRMG FRAMINGFR FRAME(D)/FRAMINGFRA FRESH AIRFRC FIRE-RESISTANT COATINGFRP FIBER REINFORCED POLYESTERFRR FIRE-RESISTANCE RATINGFRTW FIRE RETARDENT

TREATED WOODFRZ FREEZERFS FULL SIZE, FULL SCALEFT FOOT or FEET, FIRE TREATEDFTD FACIAL TISSUE DISPENSERFTG FOOTINGFUR FURR(ED/ING)FUT FUTUREFWC FABRIC WALLCOVERING

'G'GA GAUGEGALV GALVANIZED, GALVANICGB GRAB BARGC GENERAL CONTRACTORGD GRADE, GRADINGGDR GUARD RAILGEN GENERAL, GENERATORGF GROUND FACEGFCI GROUND FAULT

CIRCUIT INTERRUPTERGFRC GLASS FIBER REINFORCED

CONCRETEGI GALVANIZED IRONGKT GASKT(ED)GL GLASS/GLAZINGGL BLK GLASS BLOCKGLU LAM GLU-LAMINATED BEAM/WOODGP GALVANIZED PIPEGPDW GYPSUM DRYWALLGPL GYPSUM LATHGPPL GYPSUM PLASTERGR FL GROUND FLOORGR LN GRADE LINEGRN GRANITEGSB GYPSUM SHEATHING BOARDGSM GALVANIZED SHEET METALGSS GLAZED STRUCTURAL SHEETGST GLAZED STRUCTURAL TILEGT GROUTGUT GUTTERGV GALVANIZEDGVL GRAVELGYM GYMNASIUMGYP GYPSUMGYP BD GYPSUM BOARD

'H'HB HOSE BIBBHBD HARDBOARDHC HANDICAP, HOLLOW COREHD HAND DRYER, HEAVY DUTYHDR HEADERHDW HARDWAREHDWD HARDWOODHES HIGH EARLY STRENGTH CEMENTHK HOOKHM HOLLOW METALHNDRL HANDRAILHO HOLD-OPENHORIZ HORIZONTALHT HEIGHTHTG HEATINGHVAC HEATING VENTILATING

AIR CONDITIONINGHW HOTWATERHWT HOTWATER TANKHEX/HX HEXAGONAL

'I'ID INSIDE DIAMETER,

INSIDE DIMENSIONINCANDINCANDESCENTINCIN INCINERATORINCL INCLUDEDINSUL INSULATIONINT INTERIORINTM INTERMEDIATEINV INVERT(ED)IPS IRON PIPE SIZEIS ISLAND, INSECT SCREENISO ISOMETRICIWH INSTANTANEOUS

WATER HEATER

'J'J JOISTJC JANITOR'S CLOSETJF JOINT FILLERJT JOINTJ-BOX JUNCTION BOX

'K'KO KNOCK OUTKIT KITCHENKPL KICKPLATE

'L'L LENGTHLAB LABORATORYLAD LADDERLAM LAMINATELAV LAVATORYLB POUNDLBL LABELLC LIGHT CONTROLLD BRG LOAD BEARINGLGT LIGHT(ING)LH LEFT HANDEDLIB LIBRARYLINO LINOLEUMLKR LOCKERLKR RM LOCKER ROOMLL LIVE LOAD, LOWER LEVELLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLMS LIMESTONELOC LOCATIONLOUV LOUVERLP LIGHT POLELPT LOW POINTLPG LIQUID PETROLEUM GASLRG LARGELT LIGHTLT SW LIGHT SWITCHLTG LIGHTINGLTL LINTEL

LT LIGHT(ING)LVR LOUVERLW LIGHTWEIGHTLWC LIGHTWEIGHT CONCRETE

'M'M METERMAINT MAINTENANCEMAS MASONRYMATL MATERIALMAX MAXIMUMMB MACHINE BOLT, MAIL BOXMBR MEMBERMC MEDICINE CABINET,

MANHOLE COVER, METAL-CLADMECH RM MECHANICAL ROOMMECH MECHANICALMED MEDIUM, MEDICALMEL MELAMINEMEMB MEMBRANEMET METALMFD METAL FLOOR DECKINGMEZZ MEZZANINEMFR MANUFACTURE(R)MFR REC MANUFACTURER'S

RECOMMENDATIONMH MANHOLEMIN MINIMUMMIRR MIRRORMISC MISCELLANEOUSMLDG MOLDING (MOULDING)MLWK MILLWORKMMB MEMBRANEMO MASONRY OPENING,

MOTOR OPERATEDMOD MODIFYMOD MODULARMOPR MOP RACKMOV MOVABLEMR MAP RECEPTORMRB MARBLEMRD METAL ROOF DECK(ING)MS MOP SINK, MACHINE SCREWMT MOUNT(ED/ING)MTFR METAL FURRINGMTHR METAL THRESHOLDMTL METALMTLR METAL ROOFMULL MULLIONMVBL MOVABLEMWK MILLWORK

'N'N NORTHNAT NATURALNCOMBL NONCOMBUSTIBLENIC NOT IN CONTRACTNL NIGHT LIGHTNMT NONMETALLICNO NUMBERNOM NOMINALNR NOISE REDUCTIONNRC NOISE REDUCTION COEFFICIENTNS NO SCALENTS NOT TO SCALE

'O'OA OVERALL, OUTSIDE AIROBS OBSCUREOC ON CENTEROCC OCCUPYOD OUTSIDE DIAMETER,

OUTSIDE DIMENSIONOF OUTSIDE FACEOF/CI OWNER FURNISHED/

CONTRACTOR INSTALLEDOF/OI OWNER FURNISHED/

OWNER INSTALLEDOFD OVERFLOW DRAINOFF OFFICEOFS OUTSIDE FACE OF STUDOGL OBSCURE GLASSOH OVER(HANG/HEAD)OH DR OVERHEAD (COILING) DOOROPNG OPENINGOPH OPPOSITE HANDOPP OPPOSITEOPS OPPOSITE SURFACEOPT OPTIONALORD OVERFLOW ROOF DRAIN

'P'P PAINTPA PUBLIC ADDRESSPAR PARALLELPAT PATTERNPB PANIC BAR, PANELBOARDPBD PARTICLE BOARDPCC PRECAST CONCRETEPCF POUNDS PER CUBIC FOOTPE PEDESTALPED PEDESTALPEND PENDANTPERF PERFORATE(D)PERIM PERIMETERPERM PERMANENTPFB PREFABRICATEDPFL POUNDS PER LINEAR FOOTPFM PREFINISHEDPG PLATE GLASSPH PHASEPIL PILASTERPK GAR PARKING GARAGEPK LOT PARKING LOTPL PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTICPLST PLASTERPLY PLYWOODPNL PANELPNT PAINT(ED)POL POLISH(ED)PORC PORCELAINPR PAIR, PIPE RAILPRCST PRECASTPREFAB PREFABRICATE(D)PREFIN PREFINISHEDPRELIM PRELIMINARYPRF PREFORMEDPRKG PARKINGPROP PROPERTYPSC PRE-STRESSED CONCRETEPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPSL PIPE SLEEVEPT PRESSURE TREATEDPTD PAPER TOWEL DISPENSERPTDR PAPTER TOWEL DISPENSER

& RECEPTACLEPTN PARTITIONPTR PAPER TOWEL RECEPTACLEPV PAVE(D)PVC POLYVINYL CHLORIDEPVMT PAVEMENTPWR POWER

'Q'QT QUARRY TILEQTB QUARRY TILE BASEQTR QUARTERQTY QUANTITYQUAD QUADRANTQUAL QUALITY

'R'R RADIUS, RISER, RANGERA RETURN AIRRAD RADIUSRB RUBBER BASERB HK ROBE HOOKRBL RUBBLE STONERBT RUBBER TILERCP REFLECTED CEILING PLANRCPTN RECEPTIONRD ROOF DRAIN, ROADREBAR REINFORCING STEEL BARSREC RECESSEDRECPT RECEPTACLEREF REFERENCEREFG REFRIGIRATORREFL REFLECTEDREG REGISTERREINF REINFORCE(D)REM REMOVE(ABLE)REQD REQUIREDRESIL RESILIENTREST RESTROOMREV REVISED, REVISIONRF RESILIENT FLOORINGRFG ROOFINGRFH ROOF HATCHRFL REFLECT(ED/IVE/OR)RH RIGHT HANDEDRH ROOF HATCHRL RAIL(ING)RM ROOMRO ROUGH OPENINGROW RIGHT OF WAYRT RIGHTRTF RUBBER TILE FLOORRVS REVERSERWL RAIN WATER LEADERRWR RECESSED WASTE RECEPTACLE

'S'S SOUTHSA SUPPLY AIRSAN SANITARYSC SOLID CORESCD SEAT COVER DISPENSERSCHED SCHEDULESCP SCUPPERSCR SHOWER CURTAIN RODSCRN SCREENSCT STRUCTURAL CLAY TILESD SMOKE DETECTOR,

STORM DRAIN,SOAP DISPENSER

SDG SIDINGSECT SECTIONSF SQUARE FOOT (FEET)SFGL SAFETY GLASSSG SHEET GLASSSGD SLIDING GLASS DOORSH SHELFSHFT SHAFT (ELEVATOR)SHO SHORE(D/ING)SHR SHOWERSHT SHEETSHTHG SHEATHINGSHV SHELVINGSIM SIMILARSKLT SKYLIGHTSL SIDELIGHTSLNT SEALANTSM SHEET METAL, SMALL, SMOOTHSMP SUMP PUMPSND SANITARY NAPKIN DISPENSERSND INS SANITARY NAPKINDISPOSAL UNITSOV SHUTOFF VALVESP STANDPIPE, SUMP PITSPC SPACE(R)SPM SOLID PLASTIC MATERIALSPEC SPECIFICATIONSPKLR SPRINKLERSPKR SPEAKERSPRT SUPPORTSPL SPECIALSQ SQUARESS SANITARY SEWER, STORM SEWERSSK SERVICE SINKSST STAINLESS STEELST STAIR(S), STREETSTA STATIONSTC SOUND TRANSMISSION CLASSSTD STANDARDSTG SEATINGSTL STEELSTL LNTL STEEL LINTELSTL PL STEEL PLATESTL RF DK STEEL ROOF DECKSTOR STORAGESTR STRAIGHT, STRINGER(S)STRUCT STRUCTURALSUB FL SUB FLOORSUSP SUSPEND(ED)SV SHEET VINYLSW SIDEWALK, SWITCHSYMM SYMMETRICALSYN SYNTHETICSYS SYSTEM

'T'T TREADT&B TOP & BOTTOMT&G TONG & GROOVET/S TUB / SHOWERTB TOWEL BAR, THROUGH BOLTTBD TO BE DETERMINEDTD TRENCH DRAINTDR TOWEL DISPENSER &RECEPTACLETEL TELEPHONETEMP TEMPORARYTER TERRAZZOTFF TOP OF FINISH FLOORTHK THICK(NESS)THR THRESHOLDTHRU THROUGHTK BD TACKBOARDTKS TACK STRIPTO TOP OFTOB TOP OF BEAMTOC TOP OF CONCRETE/CURBTOC FTG TOP OF CONCRETE FOOTINGTOC WALL TOP OF CONCRETE WALLTO FDN TOP OF FOUNDATIONTOL TOLERANCETOM TOP OF MASONRYTOP TOP OF PARAPET,

TOP OF PAVEMENTTOPO TOPOGRAPHYTOS TOP OF SLAB, TOP OF STEELTOT TOP OF TRUSSTOW TOP OF WALLTP TELEPHONE POLETPD TOILET PAPER DISPENSERTPH TOILET PAPER HOLDERTPTN TOILET PARTITIONTR TOWEL RACKTRANS TRANSOM, TRANSPARENTTRTD TREATEDTS TUBE STEELTSTAT THERMOSTATTTB TELEPHONE TERMINAL BOARDTV TELEVISIONTYP TYPICAL

'U'UC UNDERCUTUGND UNDERGROUNDUL UNDERWRITERS

LABORATORIESUNFIN UNFINISH(ED)UNIF UNIFORMUNO UNLESS NOTED OTHERWISEUR URINALUTIL UTILITY

'V'V VOLTVAR VARIES, VARIATIONVB VINYL BASEVCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVF VINYL FABRICVG VERTICAL GRAINVIF VERIFY IN FIELDVIN VINYLVJ V-JOINT(ED)VNR VENEERVOLT VOLTAGEVP VENEER PLASTERVR VAPOR RETARDERVRM VERMICULITEVRFY VERIFYVT VINYL TILEVWC VINYL WALLCOVERING

'W'W WEST, WIDE, WASTE, WATTW/ WITHW/O WITHOUTWB WOOD BASEWC WATER CLOSET,

WALL COVERINGWD WOODWDW WINDOWWGL WIRED GLASSWH WATER HEATER, WEEP HOLE,

WALL HYDRANT, WALL HUNGWHB WHEEL BUMPERWHSE WAREHOUSEWI WROUGHT IRONWIN WINDOWWLD WELDEDWM WIRE MESHWO WHERE OCCURS, WITHOUTWP WATERPROOF(ED/ING)WPT WORKING POINTWPM WATERPROOF MEMBRANEWR WEATHER RESISTANTWS WEATHER STRIPWSCT WAINSCOTWT WEIGHT, WATERTIGHTWW WINDOW WALLWWF WELDED WIRE FABRICWWM WELDED WIRE MESH

'X'XFMR TRANSFORMER

'Y'YH YARD HYDRANT

'Z'Z ZEBRA

L

L

Revision Schedule

Revision #

Revision

Description Revision Date

1

2

3

4

5

6

A B C D E F

PH.5

SUBWAYNO WORKTHIS AREA

PH.2

PH.1

MPANO WORKTHIS AREA

EXIT

EXIT

RETAIL SALES

103

BREAKROOM

105

HALL

104

STORAGE

108

OFFICE/MANAGER

107

TOILET

106

FREEZERCOOLER

JANITOR

109

PH.4

PH.3

PH.1a

PH.1a

WEEK 1

PRE-CON / MOBILIZATION / NTP -10 DAYS

Ph 1 - 15 DAYS

CONSTRUCTION - 75 DAYS

WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8

MONTH 1 MONTH 2

EXPRESS REMODEL

TOTAL CONSTRUCTION : 75 DAYSCLOSEOUT: 10 DAYS

Ph 1A (SUBWAY) - 15 DAYS

Ph 2 - 10 DAYS Ph 3 - 10 DAYS Ph 4 - 10 DAYS Ph 5 - 20 DAYS Closeout - 10 DAYS

WEEK 9

PHASE 1A AT SUBWAY AND MAIN ENTRY TO RUN CONCURRENTLY WITH PHASE 1. ALL PHASE 1A WORK MUST BE PERFORMED

AFTER HOURS, WITH CLEAN UP PRIOR TO NEXT BUSINESS DAY TO ALLOW ACCESS FOR DAILY ON-GOING SALES ACTIVITY.

WEEK 10 WEEK 11

GENERAL NOTES

EXPRESS SALES SERVICE WILL CONTINUE OPERATIONTHROUGHOUT CONSTRUCTION PERIOD. COORDINATEWITH EXPRESS MANAGER REGARDING HOURS OFOPERATION, AND MAINTAIN PUBLIC ACCESS TO STORE ATALL TIMES.

CONTRACTOR TO CONSTRUCT FULLY SEALEDTEMPORARY CONSTRUCTION BARRIER BETWEEN PHASEDCONSTRUCTION AND SALES OPERATIONS. PROVIDESUPPLEMENTAL UTILITIES AND HVAC VENTILATION ASREQUIRED TO ACCOMMODATE BUSINESS OPERATIONSDURING CONSTRUCTION. REFERENCE DETAIL 2/A-101.

CONTRACTOR TO TRANSPORT DEMOLISHED MATERIALSOFF BASE AND LEGALLY DISPOSE OF THEM.

PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN AND ITEMS TO BE SALVAGED.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONSTO CONFIRM THE EXTENT OF DEMOLITION, TYPES OFCONSTRUCTION & MATERIALS USED AND CRITICALDIMENSIONS PRIOR TO BID.

CONTRACTOR TO MAINTAIN CONTINUOUS ACCESS TO ALLSIGNED EXITS WHEN THE STORE IS OPEN.

CONTRACTOR TO MAINTAIN PUBLIC ACCESS TO SUBWAYDURING NORMAL BUSINESS HOURS.

MAINTAIN CONTINUOUS EMPLOYEE ACCESS TOADMINISTRATION AREA AND MERCHANDISE PROCESSINGAREAS (MPA) AT ALL TIMES.

CONTRACTOR TO COORDINATE WITH EXCHANGEMANAGER AND FACILITIES MAINTENANCE OPERATIONS(FMO), REGARDING PHASING SCHEDULE

EXISTING FIXTURES, EQUIPMENT, CASEWORK, CASHREGISTER STANDS AND AUDIO/VISUAL EQUIPMENT TO BEREMOVED / RELOCATED BY THE EXCHANGE.

FMO REQUIRES 3 DAYS NOTICE PRIOR TO THE START OFEACH PHASE TO RELOCATE FIXTURES.

REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL DEMOLITION REQUIREMENTS THAT MAY NOTBE SHOWN ON ARCHITECTURAL SHEETS.

COORDINATE LOCATIONS OF WALL REMOVAL WITH NEWCONSTRUCTION PLANS.

PATCH ALL WALLS AND FLOORS ADJACENT TO DEMOLITIONOR EQUIPMENT REMOVAL. PREP FOR NEW FINISHES ASNOTED IN DRAWINGS.

PATCH / REPAIR EXISTING WALLS AS REQUIRED TO LEVEL 4FINISH AND BE FLUSH WITH ADJACENT WALL SURFACESWITH NO VISIBLE SEAMS.

VERIFY STRUCTURAL SHORING OF BEARING MEMBERSPRIOR TO DEMOLITION.

DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS.

DIMENSIONS ARE TO FACE OF FINISH, GRID LINES, ANDCENTERLINE OF COLUMNS U.N.O.

FIXTURES & EQUIPMENT SHOWN ARE EF/EI UNLESS NOTEDOTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULESFOR INSTALLATION RESPONSIBILITY.

CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL &MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREXCHANGE FURNISHED/EXCHANGE INSTALLED FIXTURESAND EQUIPMENT. REFERENCE ELECTRICAL ANDMECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.

VERIFY ALL EQUIPMENT MEASUREMENTS AND PLACEMENTWITH EXCHANGE.

REFERENCE MECHANICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL FLOOR DRAINS, SINKS AND PLUMBINGCONNECTIONS.

REFERENCE ELECTRICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL POWER OUTLETS AND CONNECTIONS.

PROVIDE SOLID BLOCKING IN ALL WALLS WHERE FIXTURESAND EQUIPMENT WILL BE WALL MOUNTED.

REFER TO FINISH SCHEDULE/LEGEND ON DRAWING SHEETA-251 & A-401 FOR ADDITIONAL INFORMATION ONFLOOR/WALL/CEILING FINISHES.

REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.

CONTRACTOR TO FURNISH AND INSTALL QUANTITY OF (2)TEMPORARY TOILET FACILITIES AND (1) TEMPORARY HANDWASHING STATION FOR USE BY PUBLIC AND STAFF DURINGRENOVATION OF EXISTING PUBLIC TOILET ROOM. LOCATEFACILITIES TO ALLOW EASY ACCESS BY PUBLIC AND STAFF.COORDINATE LOCATION WITH STORE MANAGER.

EXCHANGE VENDOR TO PROVIDE ALL REFURBISHMENTWORK ASSOCIATED WITH COOLER/FREEZER UNITS.

CONTRACTOR RESPONSIBLE TO REMOVE AND REINSTALLALL CEILING MOUNTED SPEAKERS.

EXCHANGE LP ONLY TO BE RESPONSIBLE FOR REMOVALAND REINSTALLATION OF ALL SECURITY CAMERAS ANDSECURITY SYSTEMS INCLUDING CABLING. CONTRACTORTO PROVIDE ELECTRICAL WIRING AS NEEDED.

REFERENCE PHOTO SHEETS FOR ADDITIONALINFORMATION.

E = EXCHANGEV = VENDORC = CONTRACTOR

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

SCOPE & SEQUENCE OVERVIEW

RETAIL SALES:CONTRACTOR TO REMOVE EXISTING VCT FLOOR FINISH,WALL BASE AND WALL FINISHES. EXCHANGE TO REMOVE /RELOCATE / REINSTALL ALL FIXTURES, EQUIPMENT, & DECOR.

NEW WALL BASE, WALL & CEILING FINISH. EXISTINGCONCRETE SLAB TO BE DIAMOND POLISHED FINISH. OPENSTRUCTURE CEILING, MECHANICAL & ELECTRICAL ELEMENTSTO BE PAINTED. NEW FIXTURES, CASEWORK ANDEQUIPMENT FURNISHED AND INSTALLED BY EXCHANGE.

SNACK AVENUE:EXCHANGE TO REMOVE EXISTING CASEWORK & EQUIPMENT.

NEW WALL FINISH, EF/EI CASEWORK & EQUIPMENT.

TOILET ROOM:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, PLUMBINGFIXTURES AND ACCESSORIES.

NEW PORCELAIN TILE FLOOR FINISH, TILE BASE, WALL TILE,CEILING FINISH, PLUMBING FIXTURES, AND ACCESSORIES.NEW PLUMBING FIXTURES TO BE INSTALLED IN EXISTINGLOCATIONS.

BREAK ROOM:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, ANDCASEWORK. REMOVE EXISTING ACOUSTICAL PANEL CEILINGTILES. EXISTING CEILING GRID TO REMAIN. CREATE OPENINGFOR DOOR TO NEW EMPLOYEE TOILET ROOM.

NEW FLOOR FINISH. WALL BASE, WALL FINISH, ANDACOUSTICAL CEILING PANELS. CLEAN / PAINT EXISTINGCEILING GRID. NEW 3-COMPARTMENT SINK, WALL SHELVINGAND WORK TABLE FOR SNACK AVENUE PREP TO BEFURNISHED BY EXCHANGE. CONTRACTOR TO INSTALL SINKAND WALL SHELVING. NEW DOOR AND FRAME FOR ENTRY TOEMPLOYEE TOILET ROOM.

JANITOR ROOM:REMOVE EXISTING HOT WATER HEATER AND REPLACE WITHNEW. REFERENCE MECHANICAL DRAWINGS.

PHASE 1

OFFICE & STORAGE:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, ANDACOUSTICAL PANEL CEILING TILES. EXISTING CEILING GRID TOREMAIN, AND BE REVISED FOR NEW TOILET ROOM ADDITION.REMOVE DOOR AND FRAME TO STORAGE ROOM, OPENINGTO REMAIN. EXCHANGE TO REMOVE / RELOCATE / REINSTALLALL FIXTURES, EQUIPMENT & DECOR.

GRIND AND SEAL EXISTING CONCRETE SLAB, NEW WALL BASEAND PAINTED WALL FINISH. REPAIR OPENING TO STORAGEROOM. PAINT GYP BD CEILING IN STORAGE ROOM. NEWACOUSTICAL CEILING TILES IN OFFICE.

NEW CONSTRUCTED TOILET ROOM:

NEW TILE FLOOR FINISH, TILE BASE, WALL TILE AND PAINTEDGYP BD. CEILING. NEW PLUMBING FIXTURES ANDACCESSORIES.

NOTE: REFERENCE GENERAL & KEY NOTES, ELEVATIONSAND SCHEDULES ON INDIVIDUAL DRAWING SHEETS FORADDITIONAL INFORMATION.

PHASE 5

LEGEND

NO WORK THIS AREA

PHASE 1a

PHASE 2 PHASE 3 PHASE 4

MAIN ENTRY & SUBWAY FRONT CUSTOMER AREA:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, WALLFINISH AND DECOR. EXCHANGE TO REMOVE / RELOCATE /REINSTALL FIXTURES AND EQUIPMENT.

NEW WALL BASE AND PAINTED WALL FINISH. EXISTINGCONCRETE SLAB TO BE DIAMOND POLISHED. PAINT GYP BDCEILING IN ENTRY, AND OPEN STRUCTURE IN RETAIL SALES.

NOTE: WORK IN THIS AREA TO BE PERFORMED AFTERHOURS. DATE AND DURATION TO BE DETERMINED. THISAREA MUST BE CLEANED UP PRIOR TO START OF BUSINESSEACH DAY TO ALLOW ACCESS FOR DAILY SALES ACTIVITY.

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

As indicated

LAW

KJM

100% BID DOCUMENTS

SEPTEMBER 19, 2014

A-100

PHASING PLAN

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

3/16" = 1'-0"A-100

1 PHASING PLANNORTH

Not to ScalePHASING SCHEDULE

Revision Schedule

Revision #

Revision

Description Revision Date

GENERAL NOTES1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

EXPRESS SALES SERVICE WILL CONTINUE OPERATIONTHROUGHOUT CONSTRUCTION PERIOD. COORDINATEWITH EXPRESS MANAGER REGARDING HOURS OFOPERATION, AND MAINTAIN PUBLIC ACCESS TO STORE ATALL TIMES.

CONTRACTOR TO CONSTRUCT FULLY SEALED TEMPORARYCONSTRUCTION BARRIER BETWEEN PHASEDCONSTRUCTION AND SALES OPERATIONS. PROVIDESUPPLEMENTAL UTILITIES AND HVAC VENTILATION ASREQUIRED TO ACCOMMODATE BUSINESS OPERATIONSDURING CONSTRUCTION. REFERENCE DETAIL 2/A-101.

CONTRACTOR IS RESPONSIBLE FOR PROPERLYREMOVING AND DISPOSING OF EXISTING BUILDINGMATERIOAL THAT MAY CONTAIN ASBESTOS ORHAZARDOUS FIBERS. SEE ASBESTOS MITIGATIONREPORT FOR PROCEDURES AND LOCATIONS.

CONTRACTOR TO TRANSPORT DEMOLISHED MATERIALSOFF BASE AND LEGALLY DISPOSE OF THEM.

COORDINATE LOCATIONS OF SLAB REMOVAL WITH NEWCONSTRUCTION PLANS, ELECTRICAL AND MECHANICALDRAWINGS. CONCRETE CUTS SHOULD OCCUR ATCENTERLINES OF WALLS WHEREVER POSSIBLE.

PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN AND ITEMS TO BE SALVAGED.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONSTO VERIFY THE EXTENT OF DEMOLITION, TYPES OFCONSTRUCTION & MATERIALS USED AND CRITICALDIMENSIONS PRIOR TO BID.

CONTRACTOR TO MAINTAIN CONTINUOUS ACCESS TO ALLSIGNED EXITS WHEN THE STORE IS OPEN.

CONTRACTOR TO MAINTAIN CONTINUOUS EMPLOYEEACCESS TO ADMINISTRATION AREA AND MERCHANDISEPROCESSING AREAS (MPA) AT ALL TIMES.

CONTRACTOR TO COORDINATE WITH EXCHANGEMANAGER AND FACILITIES MAINTENANCE OPERATIONS(FMO), REGARDING PHASING SCHEDULE.

EXISTING FIXTURES, EQUIPMENT, CASEWORK, CASHREGISTER STANDS AND AUDIO / VISUAL EQUIPMENT INRETAIL SALES AREA TO BE REMOVED / RELOCATED BYTHE EXCHANGE.

FMO REQUIRES 3 DAYS NOTICE PRIOR TO THE START OFEACH PHASE TO RELOCATE FIXTURES.

REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL DEMOLITION REQUIREMENTS THAT MAY NOTBE SHOWN ON ARCHITECTURAL SHEETS.

PATCH ALL WALLS AND FLOORS ADJACENT TODEMOLITION OR EQUIPMENT REMOVAL. PREP FOR NEWFINISHES AS NOTED IN DRAWINGS.

PATCH / REPAIR EXISTING WALLS AS REQUIRED TO LEVEL4 FINISH AND BE FLUSH WITH ADJACENT WALLSURFACES WITH NO VISIBLE SEAMS OR BLEMISHES.

VERIFY STRUCTURAL SHORING OF BEARING MEMBERSPRIOR TO DEMOLITION.

DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS.

DIMENSIONS ARE TO FACE OF FINISH, GRID LINES, ANDCENTERLINE OF COLUMNS U.N.O.

FIXTURES & EQUIPMENT SHOWN ARE EF/EI UNLESSNOTED OTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULESFOR INSTALLATION RESPONSIBILITY.

CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL& MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREXCHANGE FURNISHED/EXCHANGE INSTALLED FIXTURESAND EQUIPMENT. REFERENCE ELECTRICAL ANDMECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.

VERIFY ALL EQUIPMENT MEASUREMENTS ANDPLACEMENT WITH EXCHANGE.

CONTRACTOR TO VERIFY THAT ALL CEILING ELEMENTS,LIGHT FIXTURES AND ELECTRICAL EQUIPMENT IN THECEILING MEET SEISMIC BRACING REQUIREMENTS. ANYISSUES SHOULD BE REPORTED TO AE IMMEDIATELY.

REFERENCE MECHANICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL FLOOR DRAINS, SINKS ANDPLUMBING CONNECTIONS.

REFERENCE ELECTRICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL POWER OUTLETS AND CONNECTIONS.

PROVIDE SOLID BLOCKING IN ALL WALLS WHEREFIXTURES AND EQUIPMENT WILL BE WALL MOUNTED.

REFER TO ELEVATIONS, FINISH SCHEDULE AND FINISHLEGEND ON DRAWING SHEETS A-251 & A-401 FORADDITIONAL INFORMATION AND LOCATION OF NEWFINISHES.

REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.

CONTRACTOR TO FURNISH AND INSTALL QUANTITY OF (2)PORTABLE CHEMICAL TOILETS AND QUANTITY OF (1)HAND WASHING STATION FOR USE BY PUBLIC AND STOREEMPLOYEES DURING RENOVATION OF EXISTING PUBLICTOILET ROOM. LOCATE SO AS TO PROVIDE EASY ACCESSBY PUBLIC. COORDINATE LOCATION WITH STOREMANAGER.

EXCHANGE VENDOR TO PROVIDE ALL REFURBISHMENTWORK ASSOCIATED WITH COOLER/FREEZER UNITS.

CONTRACTOR RESPONSIBLE TO REMOVE AND REINSTALLALL CEILING MOUNTED SPEAKERS.

EXCHANGE LP ONLY TO BE RESPONSIBLE FOR REMOVALAND REINSTALLATION OF ALL SECURITY CAMERAS ANDSECURITY SYSTEMS INCLUDING CABLING. CONTRACTORTO PROVIDE ELECTRICAL WIRING AS NEEDED.

ALL FIRE EXTINGUISHERS AND CABINETS TO REMAINUNLESS NOTED OTHERWISE.

REFERENCE PHOTO SHEETS FOR ADDITIONALINFORMATION.

E = EXCHANGEV = VENDORC = CONTRACTOR

KEY NOTES

1

2

3

4

5

REMOVE EXISTING VCT FLOOR FINISH, AND WALL BASE.PREP SURFACES TO RECEIVE NEW BASE BID POLISHEDCONCRETE FLOOR FINISH, WALL BASE, WALL & CEILINGFINISH. REFERENCE SPECIFICATION SECTION 03 35 40 FORINFORMATION REGARDING SLAB REPAIR AND JOINT FILLERREPLACEMENT. EXCHANGE TO REMOVE / RELOCATE ALLEXISTING FIXTURES, CASEWORK, CASH REGISTERS, AUDIO /VISUAL, EQUIPMENT AND DECOR UNLESS NOTEDOTHERWISE.

REMOVE EXISTING VCT FLOOR FINISH, AND WALL BASE.PREP SURFACES TO RECEIVE NEW BASE BID POLISHEDCONCRETE FLOOR FINISH, WALL BASE, WALL AND CEILINGFINISH.

REMOVE EXISTING VCT FLOOR FINISH, WALL BASE,ACOUSTICAL PANEL CEILING TILES AND CASEWORK.EXISTING CEILING GRID TO REMAIN. EXISTINGREFRIGERATOR TO BE RELOCATED. EXCHANGE TORELOCATE EMPLOYEE LOCKERS. PREP FLOOR TORECEIVED SEALER ON EXISTING CONCRETE SLAB.

REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, WALLFINISHES, PLUMBING FIXTURES AND ACCESSORIES. NEWPLUMBING FIXTURES TO BE INSTALLED IN EXISTINGLOCATION. INFILL WALLS WHERE EXISTING RECESSEDACCESSORIES ARE LOCATED, TO BE FLUSH WITHADJACENT WALL SURFACE. PREP SURFACES FOR NEWFINISHES.

EXCHANGE TO REMOVE AND REINSTALL EXISTING SNACKAVENUE CASEWORK, EQUIPMENT AND DECOR.

REMOVE EXISTING WING WALL. VERIFY ELECTRICALCONNECTIONS AND RE-ROUTE OR ABANDON ASNECESSARY. PATCH/REPAIR ADJACENT FLOOR AND WALLFINISH.

REMOVE EXISTING HOT WATER HEATER AND REPLACEWITH NEW. REFERENCE MECHANICAL DRAWINGS FORINFORMATION.

EXCHANGE TO REMOVE EXISTING UPRIGHT COOLERS.

EXISTING SANDWICH COOLER AND DELI EXPRESS COOLERTO BE RELOCATED BY EXCHANGE. REFERENCE NEWEQUIPMENT PLAN FOR LOCATION.

REMOVE EXISTING DOOR AND FRAME. OPENING TOREMAIN. PATCH AND REPAIR OPENING TO BE FLUSH WITHADJACENT SURFACES.

REMOVE PORTION OF WALL TO PREPARE FOR NEW DOOR& FRAME.

EXISTING DOORS & HARDWARE TO BE REMOVED.REPLACE DOORS & HARDWARE WITH NEW IN EXISTINGFRAMES. ALL FRAMES TO BE REFURBISHED AND PAINTEDP-1 UNLESS NOTED OTHERWISE. EXTERIOR DOOR & FRAMETO BE PAINTED TO MATCH EXISTING.

RELOCATE FIRE EXTINGUISHER CABINET. REFERENCE NEWCONSTRUCTION PLAN FOR LOCATION.

REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, ANDACOUSTICAL PANEL CEILING TILES. EXISTING CEILING GRIDTO REMAIN, BUT BE REMOVED AND RECONFIGURED INAREA OF NEW TOILET ROOM CONSTRUCTION. EXCHANGETO REMOVE / REINSTALL ALL EQUIPMENT, FURNISHINGSAND SHELVING. GRIND EXISTING CONCRETE SLAB ANDSEAL.

NOT USED

EXCHANGE TO REMOVE ALL SHELVING AND FIXTURES.EXISTING UTILITIES PANELS/BOXES TO REMAIN. EXISTINGCEILING & LIGHT FIXTURE TO REMAIN. THIS ROOM WILLBECOME ENTRY TO NEW TOILET ROOM. PATCH/REPAIR ALLEXISTING SURFACES AND PREP FOR NEW FINISHES.

REMOVE EXISTING FLOOR FINISH, WALL BASE, WALLFINISHES AND ACOUSTICAL PANEL CEILING TILES. EXISTINGCEILING GRID TO REMAIN. EXISTING DRINKING FOUNTAIN TOREMAIN.

REMOVE EXISTING SLAT WALL. PATCH/REPAIR WALL TOLEVEL 4 FINISH AND PREP FOR PAINT.

CLEAN & REPAINT EXISTING DOORS & FRAMES. REPAIR ASNECESSARY. DO NOT PAINT METAL KICK PLATES.

6

7

9

LEGEND

NO WORKTHIS AREA

8

10

11

12

13

14

15

16

17

18

19

X/A-XXX PHOTO KEYINDICATOR

1

2

3

4

5

6

A B C D E F

SUBWAYNO WORKTHIS AREA

1

RETAIL SALES

103

BREAKROOM

105

HALL

104

TOILET

106

OFFICE/MANAGER

107

STORAGE

108

2

VESTIBULE

101

3

4

14

5

6

MPANO WORKTHIS AREA

FREEZER COOLER

JANITOR

109

7

ELEC.

6

REF.

8

9

10

11

12

19

19

19

13

15

16

17

FULL HEIGHT WALL TO REMAIN

WH

18

WALL FINISH THIS SIDE TO REMAIN

19

19

12

1/A-103

2/A-103

3/A-103

4/A-103 5/A-103 6/A-103

7/A-1038/A-103

9/A-103

1/A-104

2/A-104

3/A-104

4&5/A-104

6/A-104

7&8/A-104

CLG

CONST.SIDE

FL

WIRE TO GRID/SUPPORTPROTECT FINISH

VERT. 4'-0" O.C. MAX

6 MIL. POLY

MTL. STUD

TAPE

DIAGONAL/VERTICALBRACE. USE SANDBAGSAT FLOOR TO KEEP INPOSITION. NO ANCHORSINTO FLOOR ALLOWED

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

As indicated

LAW

KJM

100% BID DOCUMENTS

SEPTEMBER 19, 2014

A-101

DEMO PLAN

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

NORTH 3/16" = 1'-0"A-101

1 DEMO PLAN

3" = 1'-0"A-101

2 TEMPORARY DUST BARRIER

Revision Schedule

Revision #

Revision

Description Revision Date

ALCO SMALLTOOL TABLE

PE

PP

ER

IDG

E F

AR

MS

HO

CK

WA

VE

3'3'

25'-9"

6'

6'3'5'3'5'-31_2

"3'5'3'5'3'5'3'

6'

7'-71_2

"

7'-31_2

"

6'

6'-2"

6'

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MA

SS

DIS

PL

AY

PA

LL

ET

MA

SS

DIS

PL

AY

PA

LL

ET

MA

SS

DIS

PL

AY

PA

LL

ET

MA

SS

DIS

PL

AY

PA

LL

ET

MA

SS

DIS

PL

AY

PA

LL

ET

MA

SS

DIS

PL

AY

PA

LL

ET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

TOBA

CCO

ACC

91031

91

01

8

91007

91

01

8

91064

TOBACCOSINGLE PACKS

TO

BA

CC

OC

AR

TO

NS

SMOKELESS

TO

BA

CC

OC

AR

TO

NS

NE

WM

AN

CIG

AR

HU

MID

OR

IMPULSE

RACK w/

BEVERAGE

COO

LER

IMPULSE

RACK w/

BEVERAGE

COO

LER

MP

900

36

92501

92

08

6

92

017

5

92

02

3

92

00

9

92

01

4

92

02

4

92

07

4

92

08

3

98122

93

52

7

93

09

8

93

50

2

92

010

3

98718

92914

NO POG NO POG NO POG

NO POGNO POG90053

92

09

1

90

15

49

01

87

99

17

1

92

02

1

93

60

9

IMP

UL

SE

LEVEL 3

MINI SPIRITIMPULSE

12

EX

PR

ES

SC

AN

DY

16

EX

PR

ES

SC

HIP

S

8 EX

PR

ES

SM

EA

T S

NA

CK

S

8 EX

PR

ES

SB

RE

AK

FA

ST

FO

OD

S

4 EX

PR

ES

SM

EA

L S

OLU

TIO

NS

8 NU

TR

ITIO

NB

AR

S

8 SW

EE

T A

ND

SA

LT

Y S

NA

CK

S

4 CO

OK

IES

&C

RA

CK

ER

S

4

EXPRESSBARWARE

4 CL

EA

NIN

G &

LA

UN

DR

Y

12

EX

PR

ES

SH

BC

8 EX

PR

ES

S P

AP

ER

, TR

AS

H B

AG

SF

OO

D W

RA

PS

& C

UP

S

8 EX

PR

ES

SB

RE

AD

12

EXPRESSWARM SHELF

3

NEW FEATUREITEM ENDCAP

3

OPERATIONBE-FIT

3

EXPRESSSPECIAL

3

SPIRIT OFTHE MONTH

3

WINE OFTHE MONTH3

POSAPREPAID CARDS

24

WIN

E

24

SP

IRIT

S

24

SP

IRIT

S

8 MIX

ER

S

24

WIN

E

4 EX

PR

ES

SA

UT

O A

CC

ES

16

WA

RM

BE

ER

24

WIN

E

24

SP

IRIT

S

4 AU

TO

MO

TIV

EW

INT

ER

4 EX

PR

ES

S C

OO

LE

RS

INS

L B

OT

TLE

S/G

RIL

LS

4 EX

PR

ES

SD

RY

GR

OC

ER

IES

4 EX

PR

ES

SP

AP

ER

PR

OD

.

CA

SE

ST

AC

KIN

G A

RE

A A

LO

NG

WA

LL

WARM BEER AND DRINKS STACK-OUTS

f/TC

ST

AN

DA

RDTA

NDEM

f/TC

1S

Use EitherBeverage Air#MT12-C orTrue #GDM12

54" H

IGH

FIX

TU

RE

54" H

IGH

FIX

TU

RE

Use EitherBeverage Air#MT12-C orTrue #GDM12

72" H

IGH

FIX

TU

RE

72" H

IGH

FIX

TU

RE

72" H

IGH

FIX

TU

RE

72" H

IGH

FIX

TU

RE

4S

1S

54" H

IGH

FIX

TU

RE

1

2

3

4

5

6

A B C D E F

A-251

3

2

1

4RETAIL SALES

103

BREAKROOM

105

OFFICE/MANAGER

107

TOILET

106

HALL

104

STORAGE

108

VESTIBULE

101

SUBWAYNO WORKTHIS AREA

NO WORKTHIS AREA

7777

A-102A-102A-102A-102 A-401A-401A-401A-401

1111

A-102A-102A-102A-102 A-401A-401A-401A-401

1

2

3

4

FREEZER COOLER

CG-1

CG-1

CG-1

CG-1

CG-1

PAINT ALL COLUMNS P-1

JANITOR

109

108A

STAFFTOILET

110

1' - 3"

ALIGN

REF

4

5

6

CG-1

CG-1

END NEW WALL FINISH ATTHIS OUTSIDE CORNER

END NEW WALL FINISH ATEDGE OF SUBWAY CONCEPT

NO NEWFINISHTHIS SIDEOF WALL

END NEWFINISH ATTHIS OUTSIDECORNER

EXISTING WOODTOP CAP TO REMAIN

CG-1

WH

105A

106A

7

7

CG-1

CG-1

CG-1

8

GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN, AND ITEMS TO BE SALVAGED.

REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL CONSTRUCTION REQUIREMENTS THAT MAYNOT BE SHOWN ON ARCHITECTURAL SHEETS.

EXISTING FIXTURES, EQUIPMENT, CASEWORK, CASHREGISTER STANDS AND AUDIO / VISUAL EQUIPMENTLOCATED IN RETAIL SALES AREA TO BE REMOVED /RELOCATED BY THE EXCHANGE.

PATCH ALL WALLS AND FLOORS AS REQUIRED TO LEVEL4 FINISH AND TO BE FLUSH WITH ADJACENT WALLSURFACES WITH NO VISIBLE SEAMS.

SEE PHASING PLAN A-100 FOR SCHEDULE ANDINFORMATION..

PROTECT UNDERSLAB UTILITIES, LOCATED BELOW CONC.SLAB TO BE REMOVED THAT ARE TO REMAIN INSERVICE.

REFERENCE DEMO PLAN AND DOOR SCHEDULE FORINFORMATION ON DOORS/FRAMES TO REMAIN, AND NEWDOOR/HARDWARE INFORMATION.

ALL OUTSIDE CORNERS, ON WALLS AND COLUMNS, INRETAIL SALES AREA TO RECEIVE CORNER GUARDS CG-1.

PAINT ALL COLUMNS IN RETAIL SALES AREA P-1, UNLESSNOTED OTHERWISE ON DRAWINGS AND ELEVATIONS.

FIXTURES AND EQUIPMENT SHOWN ARE EF/EI UNLESSNOTED OTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULESFOR INSTALLATION RESPONSIBILITY.

CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL& MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREF/EI FIXTURES AND EQUIPMENT. REFERENCEELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.

REFER TO ROOM FINISH SCHEDULE, FINISH LEGEND ANDINTERIOR ELEVATIONS ON SHEETS A-251 & A-401 FORINFORMATION ON NEW FINISHES AND LOCATIONS.

ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.

E = EXCHANGEV = VENDORC = CONTRACTOR

KEY NOTES1 NEW STORE FIXTURES EF/EI.

NEW 3-COMPARTMENT SINK AND WORK TABLE.RELOCATE EXISTING REFRIGERATOR. EMPLOYEELOCKERS TO BE RELOCATED BY EXCHANGE.

NEW PLUMBING FIXTURES AND ACCESSORIES.

RELOCATED FIRE EXTINGUISHER

EXISTING SANDWICH COOLER TO REMAIN

EXISTING DELI EXPRESS COOLER TO REMAIN

NEW DOOR & HARDWARE IN EXISTING FRAME. REPAIRAND REPAINT FRAME P-1 UNLESS NOTED OTHERWISE.

NEW DOOR & FRAME

LEGEND

NO WORK THIS AREA

2

3

4

5

6

7

8

STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE.

GRAB BAR / RAILING with3 SCREWS at EACHCONNECTION

STEEL STUDS - REFERTO WALL TYPE DETAILS

6"x 18 GA STEEL BACKINGSTUD. NOTCH BACKINGSTUD AROUND WALLSTUDS.3 STUD MINIMUM SPAN.

(2) #8 SCREWS PERWALL STUD

NOTE: MAXIMUMWEIGHT SHALL BE 250LBS

1/2"

1/2"

LOCATION OF CLEAT orHANGER

STEEL STUDS - REFERTO WALL TYPE DETAILS

(2) #8 SCREWS PERWALL STUD

STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE.

6"x 18 GA STEEL METAL BACKING FOR ALLWALL MOUNTED ITEMS. 2 STUD MINIMUMSPAN. IF LENGTH OF CLEAT OR HANGERENDS BETWEEN STUDS, THE BACKING ISTO EXTEND TO THE NEXT STUD.

NOTE: MAXIMUMWEIGHT SHALL BE 150LBS

VERIFY HEIGHT with SUPPLIER

1/2"

1/2"

CENTERLINE OF CLEATor HANGER

STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE. 3 STUDMINIMUM SPAN.

BACKING PLATE: 12"WIDE X 18 GA. STEELPLATE FASTENEDFLUSH TO STUD WITH (2)#10 SHEET METALSCREWS PER STUD

STEEL STUDS - REFER TO WALLTYPE DETAILS

FOR STUD SPACING LARGER THAN16" O.C., USE 7/8" HAT CHANNEL FORINTERMEDIATE SUPPORT

NOTE: THIS DETAIL OCCURS AT WALL LOCATIONS THAT REQUIRE METAL BACKING.REFER TO SPECIFICATIONS.

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

As indicated

LAW

KJM

100% BID DOCUMENTS

SEPTEMBER 19, 2014

A-102

FLOOR PLAN - DOORSCHEDULE - DETAILS

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

3/16" = 1'-0"A-102

1 FLOOR PLANNORTH

DOOR SCHEDULE

ROOM NAME MARK

DOOR FRAME

HDW NOTESNO OF LEAFS

SIZE (NOM)

MATL MATLWIDTH HEIGHT THK

BREAKROOM 105A 1 3' - 0" 7' - 0" 2" WD - RED OAK HM - EXISTING 02 FIELD VERIFY FRAME OPENINGS PRIOR TO ORDERING NEW DOORS

TOILET 106A 1 3' - 0" 7' - 0" 2" WD - RED OAK HM - EXISTING 01 FIELD VERIFY FRAME OPENINGS PRIOR TO ORDERING NEW DOORS

STORAGE 108A 1 3' - 0" 7' - 0" 2" HM HM - EXISTING 01 FIELD VERIFY FRAME OPENINGS PRIOR TO ORDERING NEW DOORS

Revision Schedule

Revision #

Revision

Description Revision Date

1RETAIL SALES - WEST

REMOVE EXISTING

VCT FLOOR FINISH.

PREP FLOORS FOR

BASE BID POLISHED

CONCRETE.

LIGHT FIXTURES

TO REMAIN

PAINT EXPOSED

STRUCTURE AND

ALL MECHANICAL &

ELECTRICAL

ELEMENTS

ALL FIXTURES &

EQUIPMENT TO BE

REMOVED AND

RELOCATED BY

EXCHANGE

2SNACK AVENUE - SOUTHWEST

EXISTING SNACK

AVENUE EQUIPMENT

AND CASEWORK TO

REMAIN. EXCHANGE

TO REMOVE &

REINSTALL .

EXCHANGE TO REMOVE

& REINSTALL ALL

AUDIO/VISUAL

EQUIPMENT & DECOR

EXISTING DELI

EXPRESS & SANDWICH

COOLER TO BE REMAIN

IN THIS LOCATION

3SNACK AVENUE - WEST

REMOVE WING WALL.

RELOCATE FIRE

EXTINGUISHER CABINET.

REMOVE VCT FLOOR FINISH

REMOVE WALL BASE

PAINTED FINISHES

TO GO TO DECK

PAINTED FINISHES TO

GO TO DECK

4RETAIL SALES - SOUTH

5RETAIL SALES - SOUTHEAST

6RETAIL SALES - NORTH

7RETAIL SALES - SOUTHEAST

8RETAIL SALES - NORTHEAST

9RETAIL SALES - NORTH

EXCHANGE TO

REMOVE

EXISTING

FREEZERS

NEW PAINTED

FINISHES TO GO

TO DECKWALL TO REMAIN

COOLER & FREEZER

TO REMAIN. DO NOT

PAINT.

REMOVE & REPLACE

WALL BASE WITH

NEW

NEW PAINTED

FINISHES TO GO

TO DECK

LIGHT FIXTURES TO REMAIN

FIXTURES TO

BE REMOVED /

RELOCATED

BY EXCHANGE

AUDIO/VISUAL

EQUIPMENT TO BE

REMOVED /

REINSTALLED BY

EXCHANGE

PAINT COLUMNS P-1

SUBWAY - NO WORK

BEYOND THIS POINT

LINE DENOTING BEGINNING OF SUBWAY CONCEPT

REMOVE VCT FLOOR FINISH

REMOVE WALL BASE

NEW CORNER GUARDS

END NEW WALL &

FLOOR FINSH WORK

AT THIS POINT

STRUCTURE ABOVE SUBWAY TO BE PAINTED

ALL FINISHES, FIXTURES

& EQUIPMENT FOR

SUBWAY CONCEPT TO

REMAIN

PARTIAL HEIGHT

WALL AT SUBWAY TO

REMAIN. WALL

FINISH ON THIS SIDE

AND WOOD TOP CAP

TO REMAIN

REMOVE EXISTING SLATWALL

FULL HEIGHT WING WALL TO REMAIN

ADD TS-1

TRANSITION

STRIP. TILE TO

CONCRETE.

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1/4" = 1'-0"

LAW

Checker

100% BID DOCUMENTS

SEPTEMBER 19, 2014

A-103

PHOTO SHEET

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

Revision Schedule

Revision #

Revision

Description Revision Date

1RETAIL SALES - WEST

FULL HEIGHT WALL TO REMAIN

PARTIAL

HEIGHT WALL

TO BE

REMOVED.

VERIFY

ELECTRICAL

ELEMENTS.

2RETAIL SALES - NORTH

3BREAK ROOM - WEST

4TOILET ROOM - WEST

5TOILET ROOM - NORTH

6OFFICE - NORTH

7STORAGE - NORTH

8STORAGE - NORTH

FIXTURES TO

BE REMOVED /

RELOCATED BY

EXCHANGE

ELECTRICAL

ELEMENTS ON BACK

SIDE OF PARTIAL

HEIGHT WALL TO BE

REMOVED

CONTRACTOR TO

REMOVE EXISTING

COUNTERTOP &

CASEWORK.

REFRIGERATOR &

LOCKERS TO BE

RELOCATED BY

EXCHANGE.

CONTRACTOR TO

SUPPLY

ELECTRICAL

REQUIREMENTS

FOR NEW

REFRIGERATOR

LOCATION

EXCHANGE TO

REMOVE /

RELOCATE ALL

FIXTURES,

FURNISHINGS AND

DECORREMOVE VCT

FLOOR FINISH &

WALL BASE

REMOVE VCT FLOOR

FINISH, WALL BASE,

PLUMBING FIXTURES &

ACCESSORIES. NEW

TOILET & LAVATORY TO

BE INSTALLED IN SAME

PLACE. NEW

ACCESSORIES.

URINAL TO BE

REMOVED AND

REPLACED WITH

NEW IN SAME

LOCATION

EXISTING DOOR TO

STORAGE ROOM TO

BE REMOVED.

FRAME TO REMAIN

AREA OF NEW TOILET

ROOM CONSTRUCTION.

EXCHANGE TO REMOVE

ALL FURNISHINGS,

FIXTURES AND

EQUIPMENT. REMOVE

FLOOR FINISH, WALL

BASE AND MODIFY

ACOUSTICAL PANEL

CEILING AND GRID TO

ACCOMMODATE NEW

CONSTRUCTION

REQUIREMENTS.

EXISTING UTILITY

BOXES/PANELS TO

REMAIN.

EXCHANGE TO

REMOVE ALL

WALL FIXTURES

AND SHELVING

GRIND AND SEAL

EXISTING

CONCRETE

FLOOR

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1/4" = 1'-0"

LAW

Checker

100% BID DOCUMENTS

SEPTEMBER 19, 2014

A-104

PHOTO SHEET

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

Revision Schedule

Revision #

Revision

Description Revision Date

B C D

RB-1, TYP

P-1 P-1

P-1

P-1

P-1

ANGLED

P-1P-1

SUBWAY

NO WORK

THIS AREA

SUBWAY BULKHEAD

NO WORK BEYOND THIS POINT

SUBWAY

FINISH THIS

SIDE OF WALL

TO REMAIN

EXISTING WALL BUMPER RAIL TO

REMAIN. REPAIR / REPAINT P-1

PAINT WINDOW SILLS P-1, TYP CG-1 CG-1

2

3

4

SUBWAY

NO WORK THIS AREA

P-1 THIS SIDE OF WALL ONLY

RB-1CG-1 DO NOT PAINT COOLER

P-2 TO DECK

CG-1

END P-2 AT THIS

INSIDE CORNER

P-1

WRAP P-2 TO OUTSIDE

CORNER WHERE SUBWAY

FINISHES BEGIN

RB-1

B

CDE

RB-1, TYP NEW CASEWORK EF/EI

7'-0" P-3

P-4 TO DECK

P-2 TO DECK

WALL BEYOND PAINT P-1DO NOT PAINT COOLER, TYP DO NOT PAINT COOLER CG-1

HALL

BEYOND

P-1

WING WALL P-1 WRAP TO INSIDE CORNERS

P-3 & P-4 TO THIS INSIDE CORNER

RELOCATED FIRE

EXTINGUISHER

CABINET

1234

EXISTING CASEWORK TO REMAIN

P-1 WRAP TO

THIS INSIDE

CORNER

7'-0" P-3

TO DECK

P-4

RB-1 CG-1 RB-1 CG-1

P-1 P-1

CG-1

P-1

P-4P-4

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1/4" = 1'-0"

LAW

KJM

100% BID DOCUMENTS

SEPTEMBER 19, 2014

A-251

INTERIORELEVATIONS, FINISHLEGEND & FINISHSCHEDULE

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

1/4" = 1'-0"A-102 A-251

1 103 RETAIL SALES - NORTH

1/4" = 1'-0"A-102 A-251

2 103 RETAIL SALES - EAST

1/4" = 1'-0"A-102 A-251

3 103 RETAIL SALES - SOUTH

1/4" = 1'-0"A-102 A-251

4 103 RETAIL SALES - WEST

FINISH LEGENDSPEC ITEM REF. MANUFACTURER COLOR FINISH / DESCRIPTION

03 30 00 SEALED CONCRETE SC-1 - NATURAL -

03 35 10 POLISHED CONCRETE PC-1 - NATURAL DIAMOND POLISHED

06 64 00 FIBER REINFORCED PANELS FRP-1 MARLITE - STANDARD FRP S100-S2S SMOOTH TEXTURE

09 30 00 CERAMIC TILE CT-1 DAL TILE - SEMI GLOSS K175 BISCUIT TOILET ROOMS - 3" x 6" WALL TILE - STAGGERED BOND INSTALL

09 30 00 CERAMIC TILE BASE CTB-1 DAL TILE - SEMI GLOSS K175 BISCUIT TOILET ROOMS - A-3601 6" x 6" COVE BASE

09 30 00 GROUT GT-1 LATICRETE - EPOXY GROUT 78 STERLING SILVER FLOOR GROUT

09 30 00 GROUT GT-3 LATICRETE - SANDED GROUT 78 STERLING SILVER WALL GROUT

09 30 00 PORCELAIN TILE PT-1 DAL TILE - FABRIQUE P690 GRIS LINEN TOILET ROOMS - 12" x 12" UNPOLISHED - GRID PATTERN - QUARTERTURN BASKETWEAVE

09 30 00 PORCELAIN TILE PT-2 DAL TILE - LODGE P303 PICO BONITO OPTION 1 FLOORING - UNPOLISHED 12" X 12"

09 30 00 PORCELIAN TILE BASE PTB-1 DAL TILE - LODGE P303 PICO BONITO OPTION 1 BASE - S-36C9T 6" x 12" COVE BASE

09 30 00 TRANSITION STRIP TS-1 SCHLUTER SYSTEMS - RENO RAMP ANODIZED ALUMINUM TILE TO CONCRETE TRANSITION

09 51 23 ACOUSTICAL CEILING TILE ACT-1 USG - 562 FISSURED WHITE 2' x 4', CLASS A DONN/DXLA GRID, WHITE

09 65 13 RUBBER BASE RB-1 JOHNSONITE - 4" W/ TOE 179 STEEL -

09 65 13 RUBBER BASE RB-2 JOHNSONITE - 4" W/ TOE 48 GRAY -

09 91 00 PAINT P-1 SHERWIN WILLIAMS - HARMONY SW6127 IVORIE SATIN FINISH

09 91 00 PAINT P-2 SHERWIN WILLIAMS - HARMONY SW6531 INDIGO SATIN FINISH - SOFFIT ABOVE WALK-IN COOLER / FREEZER

09 91 00 PAINT P-3 SHERWIN WILLIAMS - HARMONY SW6314 LUXURIOUS RED SATIN FINISH - SNACK AVENUE - FLOOR TO 6'-6" AFF

09 91 00 PAINT P-4 SHERWIN WILLIAMS - HARMONY SW6601 TANAGER SATIN FINISH - SNACK AVENUE - 6'-6" AFF TO CEILING

09 91 00 PAINT P-5 SHERWIN WILLIAMS - HARMONY SW7043 WORLDLY GRAY TOILET ROOM WALLS - SEMI GLOSS FINISH

09 91 00 PAINT P-6 SHERWIN WILLIAMS - HARMONY SW7042 SHOJI WHITE CEILINGS - SEMI GLOSS FINISH

09 91 00 PAINT P-7 SHERWIN WILLIAMS - HARMONY SW6106 KILIM BEIGE SATIN FINISH

09 91 00 PAINT P-8 SHERWIN WILLIAMS - HARMONY SW6165 CONNECTED GRAY SATIN FINISH - EXPOSED CEILING

09 91 00 PAINT P-9 SHERWIN WILLIAMS - HARMONY SW7006 EXTRA WHITE SEMI-GLOSS FINISH

10 26 00 CORNER GUARDS CG-1 POLYCARBONATE CLEAR 1 1/2" x 1 1/2" TO 4'-0" A.F.F.

ROOM FINISH SCHEDULEROOM

NO NAME FLOOR BASE

WALL FINISH CEILINGFINISH

CEILINGHEIGHT COMMENTSNORTH EAST SOUTH WEST

101 VESTIBULE PC-1* RB-1 P-1 P-1 P-1 P-1 P-6 OPEN PAINT ALL CEILING STRUCTURE, MECHANICAL ANDELECTRICAL ELEMENTS

103 RETAIL SALES PC-1* RB-1 P-1 P-1 / P-2 P-1 / P-2 / P-3 / P-4 P-1 / P-3 / P-4 P-8 *BASE BID FLOORING: POLISHED CONCRETE. OPTION 1FLOORING PORCELAIN TILE PT-2 WITH PTB-1 BASE

104 HALL PC-1* RB-1 - P-1 P-1 P-1 ACT-1

105 BREAKROOM SC-1 RB-2 FRP-1 P-7 P-7 FRP-1 / P-7 ACT-1

106 TOILET PT-1 / GT-1 CTB-1 / GT-1 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-6

107 OFFICE/ MANAGER SC-1 RB-2 P-7 P-7 P-7 P-7 ACT-1

108 STORAGE SC-1 RB-2 P-9 P-9 P-9 P-9 ACT-1

109 JANITOR EXIST EXIST EXIST EXIST EXIST EXIST EXIST

110 STAFF TOILET PT-1 / GT-1 CTB-1 / GT-1 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-6 9'-0"

Revision Schedule

Revision #

Revision

Description Revision Date

PE

PP

ER

IDG

E F

AR

MS

HO

CK

WA

VE

6'

6'-2"

6'

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

MASS DISPLAY

PALLET

92009

8

2 DOORS

BAGGED

1S

3

4

5

A B

4 5

6 7

8

9

9B

12A

13

15C

15A

15B

22A

22B

25A

26

36 34

RETAIL SALES

103

BREAKROOM

105

A-4013

A-401

2

A-401

637 37

46A

24C

24A

24D

16B

66

EXISTING ICEE

MACHINE

EXIS

TIN

G C

OU

NTER

& C

ASEW

OR

K T

O R

EM

AIN

REF.

5

3

4

RELOCATEDREFRIGERATOR

90

5

75

42

46A

21

24B 64

24A

6424D24C

B

OPEN

CG-1 RB-1

TO

DEC

K

P-4

CASEWORK EF/EI

15C

15A

15B

P-1 WRAP TO

THIS INSIDE

CORNER

SOFFIT ABOVE

COOLER P-2

CG-1

FEC

12A

46A46A

3

13

9B

9 8 777

6

5

4

EXISTING CASEWORK TO REMAIN

P-1 WRAP TO THIS

INSIDE CORNER

7'-0

" P

-3P-4

TO

DEC

K

RB-1 CG-1

CG-1

24D

24A

24C

22B

22A

16B14A

25A

26

24B

64

24A

24C

24D

6

?

B

RB-2

FRP-1

36 34

37 37

RELOCATED

REFRIGERATOR

5

A B

A-401

8

11

10

9

TOILET

106

STORAGE

108

STAFFTOILET

110

JANITOR

109

OFFICE/MANAGER

107

DF

1' -

3"

ALIGN

A-40115

12

13

14

6" MTL. STUD TO DECKACOUSTICAL INSULATION

5/8" WATER RESISTANT GYP BD.(1) SIDE5/8" GYP BD. (1) SIDE

SUSPENDED GYP BD.CEILING AT 9'-0" AFF.

PAINT P-6

EXISTING CEILING TOREMAIN. PAINT P-6

108A

105A

CT-1/GT-2, TYP

CTB-1/GT-1, TYP

P-5, TYP

5

6

11

9

7

8

14

9

10

2

3

1

WALL MOUNT SINK - CF/CI

MIRROR 2'-0" X 3'-0" - CF/CI

SURFACE MOUNTED AUTOMATIC SOAP DISPENSERBATTERY OPERATED - EF/CI

FLOOR MOUNT TOILET - CF/CI

AUTOMATIC TOUCHLESS PAPER TOWEL DISPENSER - EF/CI

SEMI-RECESSED TRASH RECEPTACLE - CF/CI

TOILET PAPER DISPENSER - EF/CI

SANITARY NAPKIN DISPOSAL - CF/CI

HORIZONTAL & VERTICAL GRAB BAR - CF/CI

BABY CHANGING TABLE - EF/CI

SEAT COVER DISPENSER - EF/CI

1

TOILET FIXTURE LEGEND

2

3

4

6

7

8

9

13

14

5

3'-4

"

2'-1

0"

1'-6

"3'-4

"

6" 2'-0" 4'-0" 6"

3'-4"

3'-5

1/2

"

2'-1

"

2'-2

"

T.O

. LED

GE

2'-7

"

SIDESHORTBACK

3'-4

"

2'-3

"3'-7

"

2'-1

0"

1'-6

" AD

A

765 10321 8 9 9 13 14

6'-0"

P-7

RB-2, TYP

5

3

PAINT DOOR &

FRAME P-6

90

RB-2

FRP-1

4'-0"

P-7

OPEN

7'-0

" TYP

P-5, TYPCT-1 / GT-2,

TYP

CTB-1 / GT-1,

TYP

10

2

3

1

514

8

7

DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:

CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:

DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:

DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:

DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:

PROJECT:PROJECT:PROJECT:PROJECT:

DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:

DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:

EXCHANGE

SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

1111 2222 3333 4444 5555 6666

AAAA

BBBB

CCCC

DDDD

EEEE

As indicated

LAW

KJM

100% BID DOCUMENTS

SEPTEMBER 19, 2014

A-401

ENLARGED PLANS,ELEVATIONS &SCHEDULES

JBLM - McCHORDEXPRESSIMAGE UPGRADE

BUILDING 545

PN: 4915-12-006

NORTH

SNACK AVENUE EQUIPMENT SCHEDULE

ITE

M #

QT

Y

DESCRIPTION MANUFACTURER MODEL

SIZE ELECTRICAL PLUMBING

FU

RN

ISH

ED

INS

TA

LLE

D

REMARKSWID

TH

DE

PT

H

HE

IGH

T

VO

LT

S

PH

AS

E

AM

PS

CW

HW

WA

ST

E

4 2 STAINLESS STEEL 2.5 LITRE AIRPOT BUNN 32125.0000 6.3" 9" 14.6" E V

5 1 TWO-POSITION AIRPOT RACK BUNN UNIV-2 APR 7.5" 24.1" 14.1" E V

6 5 COFFEE SERVER BUNN TF 1.5 Gallon 9" 13.8" 14.8" A V

7 3 TF SERVER STAND BUNN 39795.0000 9.3" 12.9' 8.8" E V

8 1 TWIN INFUSION COFFEE BREWER BUNN ICB-TWIN 20" 25.3" 26.2" 120/240 1 25 3/8" E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

9 1 HOT BEVERAGE DISPENSER BUNN IMIX-14 19.2" 24" 32.6" 120 1 15 1/4" E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

9B 1 IMIX-14 HOT BEVERAGE DISPENSER BUNN 43800.0102 19.2 24 32.6 120 15 1/4" E V REFERENCE CUT SHEET FOR ADDITIONAL PLUMBING INFORMATION

12A 1 WUNDER-BAR VARIETY TEA DISPENSER COCA COLA WB-RT-4-N 10.7" 13.7" 19" 100-240 1.5 3/8" E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

13 1 ULTRA-2 HOPPER GOURMET ICE SYSTEM BUNN 34000.0000 16" 24.5" 31.9" 120 15 E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

14A 1 CARBONATED BEVERAGE DISPENSER - ICEE ICEE 563 - (3) HEAD 21.5 32.38 41.4 215-245 1 30 30PSI

E E 60 Hz - 3 WIRE, NEMA #L-620R

15A 1 POST MIX BEVERAGE DISPENSER LANCER IBD 4500 - 38-4530-GRNC 30" 30.5" 34" 115 1 15 3/8" 1.5" E V

15B 1 ICE MACHINE BIN ADAPTER LANCER FOR PART # 82-9999-010311 E V

15C 1 ICE MAKER FOR 15A - MODULAR CRESCENT CUBER HOSHIZAKI KMD-700MAH 30" 24.75" 28" 208-230 20 1.5" 3/4" E V INTEGRAL AIR-COOLER CONDENSER - REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

16B 1 MICROWAVE DELI EXPRESS RFS12MPS 21.75" 20.25" 14.25" 120 15.8 V E REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

21 1 WIRE RACK CHIP DISPLAYER STAR MFG. GOODWEST 7.75" 16" 20" V E 3 LEVEL BLACK WIRE RACK

22A 1 CHILI CHEESE DISPENSER STAR MFG. GOODWEST CHILI CHEESE DISPLAYER 9" 17" 23" 120 1.7 V E SINGLE-DISPENSER

22B 1 CHEESE DISPENSER STAR MFG. GOODWEST CHEESE DISPLAYER 9" 17" 23" 120 1.7 V E SINGLE-DISPENSER

24A 2 HOT DOG ROLLER GRILL APW WYOTT HRS-50S 34.75" 18.625" 11.25" 120 1 11 E E SLANTED SURFACE - REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

24B 1 HOT DOG BUN CABINET APW WYOTT BC-50 34.688" 18.625" 6.375" E E

24C 2 HOT DOG SNEEZE GUARD APW WYOTT SG-50 35.5" 19.5" 9" E E

24D 2 LG. GRILL EASEL WITH CHANNEL FOOD CONCEPTS FITS APW 50 COUNT GRILL 34.688" 6.375" V E

25A 1 INTERNATIONAL DELIGHT CREAM DISPENSER WHITE WAVE 210 13.75" 18" 27.5" V E

26 1 SUGAR MACHINE BUNN LS2 DUAL PORT 9.5" 14" 21" V E

34 1 STAINLESS STEEL WORK TABLE W/ SHELF 48 30 36 E E

36 1 3-COMPARTMENT SINK 90 31 34 E C

37 2 SMART WALL SYSTEM METRO SMARTWALL PLUS 48" 14" E C

42 1 BAG-IN-BOX (BIB) LANCER 85-1803-3512 39" 11" E E

46A 1 FROZEN BEVERAGE BLENDING BAR MINUS FOURTY TECH. CORP. FRLB5-2 44.5" 31" 56" 120 6.5 1/4" 5/8" V E REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS

64 2 ROLLER GRILL RISER FRITO LAY 1961402 E E

75 1 HIGH FLOW WATER FILTER EVERPURE EV9437-11 7" 16.2" 28.5" 208 1 19.2 0.25"

E C

90 1 HAND SINK EAGLE GROUP HSA-10-FA-P 17.25" 15.25" 42" .5" .5" 1.5" E C

1/4" = 1'-0"A-102 A-401

1 ENLARGED SNACK AVENUE PLAN

1/4" = 1'-0"A-401 A-401

2 SNACK AVENUE - SOUTH 1/4" = 1'-0"A-401 A-401

3 SNACK AVENUE - WEST 1/4" = 1'-0"A-401 A-401

6 105 BREAK ROOM - NORTH

1/2" = 1'-0"A-102 A-401

7 ENLARGED TOILET ROOM PLAN

1/4" = 1'-0"A-401 A-401

8 106 TOILET - NORTH 1/4" = 1'-0"A-401 A-401

9 106 TOILET - EAST 1/4" = 1'-0"A-401 A-401

10 106 TOILET - SOUTH 1/4" = 1'-0"A-401 A-401

11 106 TOILET - WEST

1/4" = 1'-0"

TYPICAL FIXTURE MOUNTING HEIGHTSNORTH

1/4" = 1'-0"A-401 A-401

4 105 BREAK ROOM - SOUTH 1/4" = 1'-0"A-401 A-401

5 105 BREAK ROOM - WEST

1/4" = 1'-0"A-401 A-401

12 110 TOILET - NORTH 1/4" = 1'-0"A-401 A-401

13 110 TOILET - EAST 1/4" = 1'-0"A-401 A-401

14 110 TOILET - SOUTH

1/4" = 1'-0"A-401 A-401

15 110 TOILET - WEST

Revision Schedule

Revision #

Revision

Description Revision Date