١ Chapter II Kitchen & Bath Drainage Drainage Syste Syste m m Drain Drain Syste Syste ms ms

Upload: wael-zmerly

Post on 25-May-2015

2.353 views

Category:

Business


3 download

TRANSCRIPT

Page 1: Drainage  Systems

١

Chapter II

Kitchen & Bath

Drainage Drainage SysteSystemm

Drain Drain SysteSystemsms

Page 2: Drainage  Systems

٢

٣

WCWCFlow of Drain: 1.5 L/S

Diameter: 110 mm

٤

WCWC –– SuspendedSuspendedFlow of Drain: 1.5 L/S

Diameter: 110 mm

Page 3: Drainage  Systems

٣

٥

WashWash--handhand basinbasinFlow of Drain: 0.7 L/S

Diameter: 50 mm

٦

BidetBidetDrain Flow : 0.4 L/S

Diameter: 50 mm

Page 4: Drainage  Systems

٤

٧

BathtubBathtubFlow of Drain: 0.8 L/S

Diameter: 50 mm

٨

Siphon Parquet Siphon Parquet floorfloorFlow of Drain: 0.8 L/S

Diameter: 125x75x50

Page 5: Drainage  Systems

٥

٩

Siphon Parquet Siphon Parquet floorfloorFlow of Drain: 0.8 L/S

Diameter: 125x75x50

١٠

BathroomBathroomFlow of Drain: 4.2 L/S

Diameter: 110 mm

Page 6: Drainage  Systems

٦

١١

SinkSinkDrain Flow : 0.8 L/S

Diameter: 50 mm

١٢

WashingWashing machinemachine’’s s SiphonSiphonDrain Flow : 0.8 L/S

Diameter: 40 mm

Page 7: Drainage  Systems

٧

١٣

DrawingDrawing EvacuationsEvacuations

١٤

DrawingDrawingof the Evacuationsof the Evacuations

Page 8: Drainage  Systems

٨

١٥

DrawingDrawing EvacuationsEvacuations

١٦

DrawingDrawingof the Evacuationsof the Evacuations

Page 9: Drainage  Systems

٩

١٧

FallsFalls

١٨

Fall DiagramFall Diagram

Page 10: Drainage  Systems

١٠

١٩

FallsFalls VentilationVentilation

٢٠

Single Single fallfall

Page 11: Drainage  Systems

١١

٢١

ExternalExternal draindrain

٢٢

Siphon Siphon InterceptorInterceptor

Page 12: Drainage  Systems

١٢

٢٣

Anti Return ValveAnti Return Valve

Normal Working Situation

Effective Anti-Flooding

٢٤

Anti Return ValveAnti Return Valve

Page 13: Drainage  Systems

١٣

٢٥

chamberchamber wwithith InspectionInspection ““GlanceGlance””

٢٦

Inspection Inspection chamberchamber

Page 14: Drainage  Systems

١٤

٢٧

EUROPEAN STANDARD NF IN 124EUROPEAN STANDARD NF IN 124

Zone pedestrian or cyclist.Charge 1.5 tons.

Group 1

A15

Pavements, spacesparking, carparks.

Charge 12.5 tons.

Group 2

B125

Devices intallés on the zone ofthe gutters.Charge 25 tons.

Group 3

C250

Devices installed on the lanesof the roads.Charge 40 tons.

Group 4

D400

Zones imposing of the loads on the

axle raised, for example docks.Charge 60 tons.

Group 5

E600

Zone imposing of the particularly

high loads on the axle.Charge 90 tons.

Group 6

F900

٢٨

GreaseGrease TrapTrap

Page 15: Drainage  Systems

١٥

٢٩

SepticSeptic tanktank

٣٠

SepticSeptic tanktank

Page 16: Drainage  Systems

١٦

٣١

BiologicalBiological pitpit

٣٢

CollectingCollecting stationstation

Page 17: Drainage  Systems

١٧

٣٣

MicrostationsMicrostations RisingRising

٣٤

RainRain waterwater

Page 18: Drainage  Systems

١٨

٣٥

GroundGround EquipmentEquipment

Point Drainage

Linear drainage

٣٦

GroundGround EquipmentEquipment

Page 19: Drainage  Systems

١٩

٣٧

BBaalconylcony DrainDrain

٣٨

Roof DrainRoof Drain

Page 20: Drainage  Systems

٢٠

٣٩

GuttersGutters

٤٠