Page 1: Drainage masterplan for delhi  - recommendations

Drainage Master plan for Delhi

UTTIPECSupported by OASIS Design

VisionPresented to Indian Flood Control Department

Page 2: Drainage masterplan for delhi  - recommendations

Issues…• No segregation between sewerage and storm water infrastructure. • Monsoon rains lead to water logging and inundation in the city. Water not

harvested and allowed to go waste, even when city faces water paucity. • Increase % of paved surfaces, reducing water percolation and increasing run

off. • Colonies situated in low lying areas experience acute drainage congestion

and backwater flow. • Drains flow from adjoining states (UP and Haryana) increasing pressure on

Delhi’s drainage system. • Unauthorised colonies adding to pressure on infrastructure. Sewerage, solid

waste, stormwater all dumped together in a single drain.• Pollution of River Yamuna, which is also a major source of water supply for

the city, by drains that carry sewage, solid waste, industrial waste etc.• Contaminated ground water.

Page 3: Drainage masterplan for delhi  - recommendations

Water Strategies

Implement “Zero Run-off” on Roads & Parks

Manage Storm water & Sewage/ Waste Water Locally & Naturally.

Create City level Watershed Management Plan and Urban Drainage Masterplan

Protect & Restore Natural Water Systems through bio-remediation.

WATER

Masterplan Policies for Natural Water Systems:

Page 4: Drainage masterplan for delhi  - recommendations

PERMEABLE SURFACES

IMPERMEABLE SURFACES Roads

Parking lotsBuilding

Pavements30 %

EVAPORATION

75%- 100% IMPERMEABLE

SURFACE

55 % RUNOFF

15% DEEPINFILTRATION

40 % EVAPORATION

10 % RUNOFF

50% DEEPINFILTRATION

75%- 100% PERMEABLE SURFACE

Idea : Federal Interagency Stream Restoration Working Group (FISRWG) US.

Impact of Urbanization

Page 5: Drainage masterplan for delhi  - recommendations

Only Roads & Open Greens provide opportunity for Storm Water catchment & Infiltration.

Page 6: Drainage masterplan for delhi  - recommendations

Storm water falling on road surface

Quickly collected in roadside drains

To the Naalas

To the river

Current Scenario

Page 7: Drainage masterplan for delhi  - recommendations

Drainage system in the city

As per MPD-2021:“ZERO RUN OFF”

DRAINAGE SHOULD BE ADOPTED”

At Present drainage system, we are doing“100% RUN OFF”

Page 8: Drainage masterplan for delhi  - recommendations

All the stormwater falls on road and it is diverted towards the closest Naala or

drain.

Page 9: Drainage masterplan for delhi  - recommendations

PRESENT Storm water management facility in the city

Storm water from road goes

to near by drain and then

to river.

Evaporation

To Nearby Drain

Page 10: Drainage masterplan for delhi  - recommendations

Most of the time, the existing system is clogged up

Page 11: Drainage masterplan for delhi  - recommendations

1: Treat at Source (streets, parks)

2: Natural Conveyance (minimal piping)

3: Natural Storm Water Treatment

• Utilize Parks and Open Spaces for Natural Storm Utilize Parks and Open Spaces for Natural Storm Water Management.Water Management.

• Adopt a 3-Tier Approach:Adopt a 3-Tier Approach:

To avoid Delhi Flash Floods

Reduced FLASH FLOODS Recharge of Ground Water

Less pressure and reduced sizing for Municipal Storm Water Treatment Plants.

PREVENT POLLUTING THE YAMUNA!11

Replenish Ground Water by minimizing Runoff & increasing local infiltration/ Recharge of Ground Water.

Minimize Runoff; Catch Storm Water locally.

Page 12: Drainage masterplan for delhi  - recommendations

CONVENTIONAL ROAD SECTION:

PROPOSED ROAD SECTION:

Page 13: Drainage masterplan for delhi  - recommendations

INSERT SWALE or PLANTER HERE

STREETS-EXISITNG

Page 14: Drainage masterplan for delhi  - recommendations

GREEN STREETS-RETROFIT OPTION-Showing storm water collection on streets

Page 15: Drainage masterplan for delhi  - recommendations

RAIN GARDEN

Roadside Greens should become Storm Water Filters & Conveyers.

Page 16: Drainage masterplan for delhi  - recommendations

Parks & Open Spaces should be zero run-off.

Parking structures should not be allowed under Parks.

Integrate Parking within buildings, or Restrict through Pricing.

Parking under parks makes them

dysfunctional as storm water catchments.

Page 17: Drainage masterplan for delhi  - recommendations

Create City level Watershed Management Plan and Urban Drainage Masterplan

Typical Watershed Map of a City, with multiple watershedsTypical Watershed Map of a City, with multiple watersheds

Watershed map using Digital Watershed map using Digital Elevation Model (DSSDI)Elevation Model (DSSDI)

Page 18: Drainage masterplan for delhi  - recommendations

• Integrated Watershed Management Plan (WMP) – is to

be prepared for Delhi so that Natural drainage systems can be

restored.

• At present IIT Delhi has been hired by IFCD for the preparation of

drainage Master Plan. However the Drainage Master Plan cannot

be an engineering project. Environment department is to be included in the preparation of the

plan.

Create City level Watershed Management Plan and Urban Drainage Masterplan

Page 19: Drainage masterplan for delhi  - recommendations

Protect & Restore Natural Water Systems through bio-remediation.

BEFOREAFTER© morphogenesis

Page 20: Drainage masterplan for delhi  - recommendations

Watershed mapping and catchment areas identification in GIS using DEM.

Integrated Storm water management strategy of each catchment, planning for working landscapes and street retrofitting to enable decentralization.

segregated sewage infrastructure, solid waste management and monitoring to ensure pollution free storm water drains.

Mandatory rainwater harvesting at micro level.

Way Forward…