Situation
Vertical drain stacks connecting to kitchensfrom the tenth floor to the first and into thebasement
Twenty-one 3 cast iron pipes
Pipe replacement was not feasible due to
elderly residents
Benefits of Nu Flow Solution
Pipes were cleaned and lined in 100
foot lengths with Pull-in-Placetechnology
Most stacks were lined ten floors at atime
Avoided the need to cut access points
Drain Stacks: Christian Care Communities
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
2/26
Situation
Basement drain line was experiencingfrequent backups
16 foot 3 drain located underneath
the elevator shaft
Benefits of Nu Flow Solution
Existing cleanouts were used for access
Cast pipe was cleaned and restored
Project completed faster and at less cost than
a pipe replacement project
Sanitary Drains: Trump Towers
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
3/26
Situation
10 roof drains encased in concrete pillars
Badly corroded and leaking
Multiple bends in the system
Benefits of Nu Flow Solution
Pipes were cleaned of all corrosion andrestored to original diameter
Roof Drains: Temple Emanu-El
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
4/26
Situation
Original pipes had almost entirelydisintegrated
Two 70 foot roof drains, each
containing a double 45 degree bend
Benefits of Nu Flow Solution
Pipes are protected from corrosionand other problems with a long-term
solution
Roof Drains: EEOB
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
5/26
Situation
Badly corroded pipe running underhospitals intensive care unit with
limited access
Re-piping would require demolitionand disruption to patients and staff
256 feet of 12 mainline with sevenconnections
Benefits of Nu Flow Solution
The system was cleaned and restored
to the pipes capacity
The process preserved the structure,avoided reconstruction and occupantdisplacement
Mainline: Shands Childrens Hospital
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
6/26
Situation
250 feet of 6-inch sanitary lineexperiencing infiltration and exfiltrationinto surrounding soil
Roots intruded the leaking andcorroded pipe
Benefits of Nu Flow Solution
System was cleaned of corrosion,buildup and roots
Lined from the building, under the golfgreens and to the entrance road
Trenchless technology preservedlandscape and hardscape
Sewer Main: Mar-A-Lago Resort
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
7/26
Situation
Over 100 feet of 30-year-old cast iron pipe withextensive corrosion
Digging was not an option since pipe waslocated under 100 feet of concrete
Benefits of Nu Flow Solution
The system was cleaned and
restored A high heat resistant epoxy was used
to safeguard the drains againstfurther damage
Sanitary Drains: Nestle Factory
http://images.google.com/imgres?imgurl=http://www.fromeuropewithlove.net/Pictures/nestle.gif&imgrefurl=http://www.fromeuropewithlove.net/no_more_nestle_good_life.htm&h=306&w=308&sz=9&hl=en&start=1&tbnid=ZxWNA0WXEGi86M:&tbnh=116&tbnw=117&prev=/images?q=nestle&gbv=2&svnum=10&hl=en -
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
8/26
Situation 100 feet of deteriorating 8 sanitary
pipe was had blockages
Two lateral connections 7 feet belowgrade needed to be rehabilitated
Benefits of Nu Flow Solution Restoration work with reinstatements of
laterals completed in 5 days
Plant avoided shut down with Nu Flowprocess
Sanitary Drains: General Motors
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
9/26
In 2003, Sarasota County wasforced to haul 1.4 milliongallons of excess ground waterthat had infiltrated their Sewagesystem at a single pump station.
Since lining that neighborhoods
mains and laterals the over flowproblem virtually disappeared.
The savings on overflow watertreatment is in the MILLIONS fora SINGLE PUMP STATION.
Sarasota County has between40 and 50 active pump stationsat any given time.
Sewer Main: Sarasota County
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
10/26
Situation More than a mile of cast iron vertical
stacks with 3 to 4 diameters were
increasingly experiencing more leaks
Management had been replacing thepipes as they broke, but it was a
messy, time-consuming and costlyprocess
Benefits of Nu Flow Solution
Technicians only opened up walls inside condos when there was a problem, otherwisethere wasnt any construction
Nu Flows structural liner is permanent and will protect the pipes to prevent future leaks
Customer saved time, money and hassle
Sanitary Drains: Beachplace Condos
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
11/26
Situation 228 feet of cast iron drain pipes with
diameters ranging from 3 to 6
Pipes ran from 7th floor to the 25th floorin a 27-story building
Corroded pipes obstructed flow andcaused back-ups in the sewer stacks
Benefits of Nu Flow Solution
Structural liner installation is trenchless, sothere wasnt any destruction or
reconstruction to the office building
Nu Flow installed a permanent solution toprevent future corrosion
Cost-effective compared to payingprofessionals to repeatedly clean the pipes
Sewer Stack: Columbia Center
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
12/26
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
13/26
Situation
2,400 feet of cast iron vertical drainstacks with diameters of 2, 3 and
4
22 cracked and about-to-failsanitary vertical stacks
Benefits of Nu Flow Solution
Majority of pipes were behind finisheddrywall or concrete, which makes NuFlows no-dig technology the bestchoice
Residents were not disturbed and nodestruction of the property took place
Structural liner will prevent futurecorrosion, saving the tenants time,money and hassle
Sanitary Stack: Princess Del Mar Condos
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
14/26
Situation 491 feet of cast iron sewer pipes
with diameters of 3, 4, 5, 6 and
8
Aged pipes had corrosion, causingsignificant cracking and leaking
Benefits of Nu Flow Solution
Nu Flows Pull-in-Place, trenchless
lining solution prevented destruction tothe building and disruption of normaloperations to the offices
Structural liner formed a permanent,protective barrier inside the host pipes
Sewer Stack: 101 West Broadway
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
15/26
Situation
The hotel sits at sea level with its parking
structure below the hotel. Drain lines arelocated below the parking structure, underthe water table
70 feet of 5-year-old cast iron sewer drainline with a 4 diameter was corroded and
had breaks, causing failures
Benefits of Nu Flow Solution
Nu Flows Pull-in-Place, trenchless
lining solution prevented unsightlyconstruction and inconvenience forhotel guests
Structural liner formed a permanent,protective barrier inside the host pipesto prevent future problems
Sewer Drain: Omni Hotel
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
16/26
Situation
Sorrento Towers, seven-story office buildings inSan Diego, had a courtyard fountain thatexperienced chronic corrosion, staining orangewater and leaks that dripped onto cars in theparking structure below
The pipes ranged from 2 to 12 in diameter
Benefits of Nu Flow Solution
Nu Flow was able to clean, reinstate and line theentire fountain drain system
The exposed pipes that hung from the
underground parking structures ceiling were notmoved for the lining installation, except for sometransition and elbow pipes
There was no destruction to the property orinconvenience to tenants
Fountain Drain System: Sorrento Towers
M i D i Li & St D i St k
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
17/26
Situation
Part of the 10 cast iron main line was missing
Vertical cast iron storm drain lines werecracked and leaking into units
Customer did not want a re-pipe because ofthe cost and the destruction it would cause
The luxury, waterfront condo is 15 stories
Benefits of Nu Flow Solution
Nu Flow was able to clean and line theentire main line and all storm drains byusing existing access points
There were no holes dug and theresidents were not inconvenienced
Weve been perfectly happy with
the job Nu Flow has done.
We would have had to dig up the
whole front end of the property to
replace the main line, had we
decided thats the way to go.
But this lining has done away with
all that.
-Dennis Brokaw, Property Manager,Las Flores Tower
Main Drain Line & Storm Drain Stacks:Las Flores High-Rise Condo
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
18/26
Situation
Cast iron kitchen, laundry and sanitary sewerdrain lines with diameters of 3 and 4 are located
under the concrete foundations and floors coveredwith ceramic tile or carpets
Pipes were cracked and leaked into some of the
waterfronts units Colony Point did not want to re-pipe the
underground sewer drain lines because of thedestruction it would cause
Benefits of Nu Flow Solution
Nu Flows no-dig technology allowed usto inspect, clean and line the pipesusing existing access points
No inconvenience, displacement, messyconstruction site for residents
We had a budget and we were
able to stay inside the budget. We
felt this process that Nu Flow
developed would be very
effective, not only from a cost
standpoint, but for the sake ofconvenience.
-David Baker, Colony Point,Resident and Member of Colony Points
Building Grounds Committee
Sewer Drains: Colony Point Condos
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
19/26
Situation
The 40-year-old horizontal cast iron sewerpipes located in 4- or 5-foot-thick concreteslabs in the parking garage were corrodedand leaking
The pipes, consisting of 3, 4, 6 and 8
diameters, were stuck inside the concrete
without protective sleeving, so the customeroriginally did not think there was a way to fixthe leaks
Benefits of Nu Flow Solution
Nu Flows trenchless technology allowed
us to inspect, clean and line the pipes
inside the concrete using existing accesspoints
Our patented structural lining covered thecracks and is a long-term solution againstfuture pipe problems
We cleaned and lined the aged 10 castiron main line to prevent future issues
Sewer Drains and Main: Cabrillo Tower
Nu Flow was the most
economically prudent and
practical solution to a problemthat could have cost thousands
upon thousands of dollars.
- Mark Tracy, Cabrillo Tower PropertyManager
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
20/26
Situation
Several thousand feet of sanitary drainpipes, ranging 1/5 to 6, experienced
backups and cracks, as a result of age andcorrosion.
Some of the sewer lines are located in hard-to-access areas, so a traditional re-pipe
would be a nightmare for the customer
Benefits of Nu Flow Solution
Nu Flow successfully installed ourstructural liner in the drain without havingto close the hospital or inconveniencing
the patients or employees
The structural liner cures in place andbecomes a new protective pipe within thehost pipe, which covers all holes andcracks, as well as prevents futureproblems from occurring
Sewer Drain: VA Long Beach Hospital
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
21/26
Situation
Serious root intrusion caused consistentbackups in the middle schools 6 sewer main
The 40-year-old clay pipes run under thefoundation from the schools kitchen to the
septic tank outside, beneath a paved area
The sewer main is 826 feet long
The customer spent thousands of dollars peryear in maintenance costs to routinely cleanthe drain pipes so the middle school lookedfor a long-term solution to save money
Benefits of Nu Flow Solution
Nu Flow was able to successfully get the work done within the customers strict timeline
Our patented Pull-in-Place structural liner was installed using existing access points, sothe floors were preserved and there was no damage to the property
Nu Flows seamless liner is an effective long-term solution against pipe movements at thejoints, which increase the likelihood of root intrusion
Sewer Main: Hesperia Junior High
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
22/26
Situation
12 PVC drain pipes that run from the corporateheadquarters large stone fountain to a pump
room were leaking
The 13-year-old return lines are 10 feet beneaththe outside fountain and surrounding sidewalk
A traditional re-pipe would cause destruction tothe fountain and sidewalk, which the customerwanted to avoid
Benefits of Nu Flow Solution
Nu Flows no-dig technology was the only feasible solution for the customer
Nu Flows Pull-in-Place structural liner was installed using existing access points,preventing any damage to the fountain or sidewalk
The 12 drain lines and several 90 degree and 45 degree bends were successfully lined, so
all leaks were covered and the pipes are protected to prevent future leaks and other
problems
Fountain Drain: Chick-Fil-A Corporate
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
23/26
Situation
This 3-story apartment complex has a 40-year-old shared sanitary waste system withcast iron pipes, ranging from 2 through 6 in
diameter
Some of the pipe lines run through walls andbeneath the ground
Corrosion reduced the pipes diameters by75%, which caused back-ups and floods
A traditional re-pipe would have been intrusiveand destructive
Benefits of Nu Flow Solution
Our technicians successfully broke through the thick sludge built inside the pipes andbrought the pipes back to their original diameter.
Nu Flows no-dig technology prevented resident displacement and offered maximumconvenience for the residents
Our pipe rehabilitation solution was about 40% cheaper than a re-pipes cost
Sanitary Drain System: First Ave Apartments
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
24/26
Situation
22-story busy office building in downtown SanDiego, California
8 sewer main was about 40 years old and had
corrosion and cracks, which caused failures
The sewer main is located under the parkinggarage and nearby streets
Benefits of Nu Flow Solution
Nu Flows trenchless technology preserved the
parking garage and streets, preventing disruption andinconvenience
Our Pull-in-Place structural liner forms a protectivepipe within a pipe to serve as a long-term solution toprevent future pipe failures
Sewer Main: 225 Broadway NBC Building
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
25/26
-
8/3/2019 Drain: Sanitary Pipes - Power Point Presentation
26/26
Situation
4" cast iron sewer pipes, locatedunderneath the mechanical rooms' floors inthe hospital's basement, are more than 50years old
These pipes became so corroded thatholes formed and leaked foul sewer gases
into the mechanical rooms and hallways The not-for-profit hospital wanted the pipes
fixed but did not want normal operationsdisturbed
Benefits of Nu Flow Solution
Nu Flow used existing access points toclean and line the aged sewer pipes sothere was no damage to the building
The 3 by 6 exposed pipe in the concrete
floor was also successfully lined
Nu Flow worked at night for minimumdisruption
Sewer Line: Hoag Hospital Newport Beach