    Situation

    Vertical drain stacks connecting to kitchensfrom the tenth floor to the first and into thebasement

    Twenty-one 3 cast iron pipes

    Pipe replacement was not feasible due to

    elderly residents

    Benefits of Nu Flow Solution

    Pipes were cleaned and lined in 100

    foot lengths with Pull-in-Placetechnology

    Most stacks were lined ten floors at atime

    Avoided the need to cut access points

    Drain Stacks: Christian Care Communities

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    2/26

    Situation

    Basement drain line was experiencingfrequent backups

    16 foot 3 drain located underneath

    the elevator shaft

    Benefits of Nu Flow Solution

    Existing cleanouts were used for access

    Cast pipe was cleaned and restored

    Project completed faster and at less cost than

    a pipe replacement project

    Sanitary Drains: Trump Towers

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    3/26

    Situation

    10 roof drains encased in concrete pillars

    Badly corroded and leaking

    Multiple bends in the system

    Benefits of Nu Flow Solution

    Pipes were cleaned of all corrosion andrestored to original diameter

    Roof Drains: Temple Emanu-El

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    4/26

    Situation

    Original pipes had almost entirelydisintegrated

    Two 70 foot roof drains, each

    containing a double 45 degree bend

    Benefits of Nu Flow Solution

    Pipes are protected from corrosionand other problems with a long-term

    solution

    Roof Drains: EEOB

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    5/26

    Situation

    Badly corroded pipe running underhospitals intensive care unit with

    limited access

    Re-piping would require demolitionand disruption to patients and staff

    256 feet of 12 mainline with sevenconnections

    Benefits of Nu Flow Solution

    The system was cleaned and restored

    to the pipes capacity

    The process preserved the structure,avoided reconstruction and occupantdisplacement

    Mainline: Shands Childrens Hospital

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    6/26

    Situation

    250 feet of 6-inch sanitary lineexperiencing infiltration and exfiltrationinto surrounding soil

    Roots intruded the leaking andcorroded pipe

    Benefits of Nu Flow Solution

    System was cleaned of corrosion,buildup and roots

    Lined from the building, under the golfgreens and to the entrance road

    Trenchless technology preservedlandscape and hardscape

    Sewer Main: Mar-A-Lago Resort

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    7/26

    Situation

    Over 100 feet of 30-year-old cast iron pipe withextensive corrosion

    Digging was not an option since pipe waslocated under 100 feet of concrete

    Benefits of Nu Flow Solution

    The system was cleaned and

    restored A high heat resistant epoxy was used

    to safeguard the drains againstfurther damage

    Sanitary Drains: Nestle Factory

    http://images.google.com/imgres?imgurl=http://www.fromeuropewithlove.net/Pictures/nestle.gif&imgrefurl=http://www.fromeuropewithlove.net/no_more_nestle_good_life.htm&h=306&w=308&sz=9&hl=en&start=1&tbnid=ZxWNA0WXEGi86M:&tbnh=116&tbnw=117&prev=/images?q=nestle&gbv=2&svnum=10&hl=en
  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    8/26

    Situation 100 feet of deteriorating 8 sanitary

    pipe was had blockages

    Two lateral connections 7 feet belowgrade needed to be rehabilitated

    Benefits of Nu Flow Solution Restoration work with reinstatements of

    laterals completed in 5 days

    Plant avoided shut down with Nu Flowprocess

    Sanitary Drains: General Motors

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    9/26

    In 2003, Sarasota County wasforced to haul 1.4 milliongallons of excess ground waterthat had infiltrated their Sewagesystem at a single pump station.

    Since lining that neighborhoods

    mains and laterals the over flowproblem virtually disappeared.

    The savings on overflow watertreatment is in the MILLIONS fora SINGLE PUMP STATION.

    Sarasota County has between40 and 50 active pump stationsat any given time.

    Sewer Main: Sarasota County

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    10/26

    Situation More than a mile of cast iron vertical

    stacks with 3 to 4 diameters were

    increasingly experiencing more leaks

    Management had been replacing thepipes as they broke, but it was a

    messy, time-consuming and costlyprocess

    Benefits of Nu Flow Solution

    Technicians only opened up walls inside condos when there was a problem, otherwisethere wasnt any construction

    Nu Flows structural liner is permanent and will protect the pipes to prevent future leaks

    Customer saved time, money and hassle

    Sanitary Drains: Beachplace Condos

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    11/26

    Situation 228 feet of cast iron drain pipes with

    diameters ranging from 3 to 6

    Pipes ran from 7th floor to the 25th floorin a 27-story building

    Corroded pipes obstructed flow andcaused back-ups in the sewer stacks

    Benefits of Nu Flow Solution

    Structural liner installation is trenchless, sothere wasnt any destruction or

    reconstruction to the office building

    Nu Flow installed a permanent solution toprevent future corrosion

    Cost-effective compared to payingprofessionals to repeatedly clean the pipes

    Sewer Stack: Columbia Center

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    12/26

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    13/26

    Situation

    2,400 feet of cast iron vertical drainstacks with diameters of 2, 3 and

    4

    22 cracked and about-to-failsanitary vertical stacks

    Benefits of Nu Flow Solution

    Majority of pipes were behind finisheddrywall or concrete, which makes NuFlows no-dig technology the bestchoice

    Residents were not disturbed and nodestruction of the property took place

    Structural liner will prevent futurecorrosion, saving the tenants time,money and hassle

    Sanitary Stack: Princess Del Mar Condos

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    14/26

    Situation 491 feet of cast iron sewer pipes

    with diameters of 3, 4, 5, 6 and

    8

    Aged pipes had corrosion, causingsignificant cracking and leaking

    Benefits of Nu Flow Solution

    Nu Flows Pull-in-Place, trenchless

    lining solution prevented destruction tothe building and disruption of normaloperations to the offices

    Structural liner formed a permanent,protective barrier inside the host pipes

    Sewer Stack: 101 West Broadway

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    15/26

    Situation

    The hotel sits at sea level with its parking

    structure below the hotel. Drain lines arelocated below the parking structure, underthe water table

    70 feet of 5-year-old cast iron sewer drainline with a 4 diameter was corroded and

    had breaks, causing failures

    Benefits of Nu Flow Solution

    Nu Flows Pull-in-Place, trenchless

    lining solution prevented unsightlyconstruction and inconvenience forhotel guests

    Structural liner formed a permanent,protective barrier inside the host pipesto prevent future problems

    Sewer Drain: Omni Hotel

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    16/26

    Situation

    Sorrento Towers, seven-story office buildings inSan Diego, had a courtyard fountain thatexperienced chronic corrosion, staining orangewater and leaks that dripped onto cars in theparking structure below

    The pipes ranged from 2 to 12 in diameter

    Benefits of Nu Flow Solution

    Nu Flow was able to clean, reinstate and line theentire fountain drain system

    The exposed pipes that hung from the

    underground parking structures ceiling were notmoved for the lining installation, except for sometransition and elbow pipes

    There was no destruction to the property orinconvenience to tenants

    Fountain Drain System: Sorrento Towers

    M i D i Li & St D i St k

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    17/26

    Situation

    Part of the 10 cast iron main line was missing

    Vertical cast iron storm drain lines werecracked and leaking into units

    Customer did not want a re-pipe because ofthe cost and the destruction it would cause

    The luxury, waterfront condo is 15 stories

    Benefits of Nu Flow Solution

    Nu Flow was able to clean and line theentire main line and all storm drains byusing existing access points

    There were no holes dug and theresidents were not inconvenienced

    Weve been perfectly happy with

    the job Nu Flow has done.

    We would have had to dig up the

    whole front end of the property to

    replace the main line, had we

    decided thats the way to go.

    But this lining has done away with

    all that.

    -Dennis Brokaw, Property Manager,Las Flores Tower

    Main Drain Line & Storm Drain Stacks:Las Flores High-Rise Condo

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    18/26

    Situation

    Cast iron kitchen, laundry and sanitary sewerdrain lines with diameters of 3 and 4 are located

    under the concrete foundations and floors coveredwith ceramic tile or carpets

    Pipes were cracked and leaked into some of the

    waterfronts units Colony Point did not want to re-pipe the

    underground sewer drain lines because of thedestruction it would cause

    Benefits of Nu Flow Solution

    Nu Flows no-dig technology allowed usto inspect, clean and line the pipesusing existing access points

    No inconvenience, displacement, messyconstruction site for residents

    We had a budget and we were

    able to stay inside the budget. We

    felt this process that Nu Flow

    developed would be very

    effective, not only from a cost

    standpoint, but for the sake ofconvenience.

    -David Baker, Colony Point,Resident and Member of Colony Points

    Building Grounds Committee

    Sewer Drains: Colony Point Condos

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    19/26

    Situation

    The 40-year-old horizontal cast iron sewerpipes located in 4- or 5-foot-thick concreteslabs in the parking garage were corrodedand leaking

    The pipes, consisting of 3, 4, 6 and 8

    diameters, were stuck inside the concrete

    without protective sleeving, so the customeroriginally did not think there was a way to fixthe leaks

    Benefits of Nu Flow Solution

    Nu Flows trenchless technology allowed

    us to inspect, clean and line the pipes

    inside the concrete using existing accesspoints

    Our patented structural lining covered thecracks and is a long-term solution againstfuture pipe problems

    We cleaned and lined the aged 10 castiron main line to prevent future issues

    Sewer Drains and Main: Cabrillo Tower

    Nu Flow was the most

    economically prudent and

    practical solution to a problemthat could have cost thousands

    upon thousands of dollars.

    - Mark Tracy, Cabrillo Tower PropertyManager

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    20/26

    Situation

    Several thousand feet of sanitary drainpipes, ranging 1/5 to 6, experienced

    backups and cracks, as a result of age andcorrosion.

    Some of the sewer lines are located in hard-to-access areas, so a traditional re-pipe

    would be a nightmare for the customer

    Benefits of Nu Flow Solution

    Nu Flow successfully installed ourstructural liner in the drain without havingto close the hospital or inconveniencing

    the patients or employees

    The structural liner cures in place andbecomes a new protective pipe within thehost pipe, which covers all holes andcracks, as well as prevents futureproblems from occurring

    Sewer Drain: VA Long Beach Hospital

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    21/26

    Situation

    Serious root intrusion caused consistentbackups in the middle schools 6 sewer main

    The 40-year-old clay pipes run under thefoundation from the schools kitchen to the

    septic tank outside, beneath a paved area

    The sewer main is 826 feet long

    The customer spent thousands of dollars peryear in maintenance costs to routinely cleanthe drain pipes so the middle school lookedfor a long-term solution to save money

    Benefits of Nu Flow Solution

    Nu Flow was able to successfully get the work done within the customers strict timeline

    Our patented Pull-in-Place structural liner was installed using existing access points, sothe floors were preserved and there was no damage to the property

    Nu Flows seamless liner is an effective long-term solution against pipe movements at thejoints, which increase the likelihood of root intrusion

    Sewer Main: Hesperia Junior High

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    22/26

    Situation

    12 PVC drain pipes that run from the corporateheadquarters large stone fountain to a pump

    room were leaking

    The 13-year-old return lines are 10 feet beneaththe outside fountain and surrounding sidewalk

    A traditional re-pipe would cause destruction tothe fountain and sidewalk, which the customerwanted to avoid

    Benefits of Nu Flow Solution

    Nu Flows no-dig technology was the only feasible solution for the customer

    Nu Flows Pull-in-Place structural liner was installed using existing access points,preventing any damage to the fountain or sidewalk

    The 12 drain lines and several 90 degree and 45 degree bends were successfully lined, so

    all leaks were covered and the pipes are protected to prevent future leaks and other

    problems

    Fountain Drain: Chick-Fil-A Corporate

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    23/26

    Situation

    This 3-story apartment complex has a 40-year-old shared sanitary waste system withcast iron pipes, ranging from 2 through 6 in

    diameter

    Some of the pipe lines run through walls andbeneath the ground

    Corrosion reduced the pipes diameters by75%, which caused back-ups and floods

    A traditional re-pipe would have been intrusiveand destructive

    Benefits of Nu Flow Solution

    Our technicians successfully broke through the thick sludge built inside the pipes andbrought the pipes back to their original diameter.

    Nu Flows no-dig technology prevented resident displacement and offered maximumconvenience for the residents

    Our pipe rehabilitation solution was about 40% cheaper than a re-pipes cost

    Sanitary Drain System: First Ave Apartments

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    24/26

    Situation

    22-story busy office building in downtown SanDiego, California

    8 sewer main was about 40 years old and had

    corrosion and cracks, which caused failures

    The sewer main is located under the parkinggarage and nearby streets

    Benefits of Nu Flow Solution

    Nu Flows trenchless technology preserved the

    parking garage and streets, preventing disruption andinconvenience

    Our Pull-in-Place structural liner forms a protectivepipe within a pipe to serve as a long-term solution toprevent future pipe failures

    Sewer Main: 225 Broadway NBC Building

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    25/26

  • 8/3/2019 Drain: Sanitary Pipes - Power Point Presentation

    26/26

    Situation

    4" cast iron sewer pipes, locatedunderneath the mechanical rooms' floors inthe hospital's basement, are more than 50years old

    These pipes became so corroded thatholes formed and leaked foul sewer gases

    into the mechanical rooms and hallways The not-for-profit hospital wanted the pipes

    fixed but did not want normal operationsdisturbed

    Benefits of Nu Flow Solution

    Nu Flow used existing access points toclean and line the aged sewer pipes sothere was no damage to the building

    The 3 by 6 exposed pipe in the concrete

    floor was also successfully lined

    Nu Flow worked at night for minimumdisruption

    Sewer Line: Hoag Hospital Newport Beach